While waiting for my group work partner to come over to finish our presentation, I did a little quilting. I made a little bag to hold a wall hanging when it’s all rolled up for storage and I continued work on the little red mat. I was able to pick out fabrics to finish it from my stash, added borders and got it sandwiched. It’s basically the size of a large placemat.
I’m thinking of practicing my stippling on it. I bought a large stipple template a few months ago and the pounce with chalk, so I may whip all that out to try it out. My free motion quilting is awful, but hey, you gotta start somewhere.
Tonight class was moved up from 8-10 to 6-8. We also have to give the aforementioned presentation, which is not fun, but it won’t be too bad and it will be over. The only other obligation for this class will be the final. However when I get home, I need to do group work for my other class that must be submitted by midnight. I have no idea if I will get to sew at all.
I've created this blog to keep with all my friends on Stashbusters who have their quilting blogs here!
Thursday, April 10, 2008
Wednesday, April 09, 2008
Plumbing Problems
Those 2 words strike terror in the heart. DD astutely caught the drip into the basement and Ted undid the dishwasher and found the leaky value. So now I await the plumber’s phone call so I can leave work and head home.
On a related note, we are trying to plan a large vacation and I have extensive dental work planned and now this. The Lord provides; the Discover Card people raised our limit by $2000 last week. While I don’t like to use credit, I am OK with it for these types of things. I have a hard time planning for the vacation without having all the money in hand right now to pay for all the pieces.
And on top of this all, I got either a migraine or a sinus headache last night. No sewing got done, but nothing else was urgent, so I was a slug and was OK with it.
On a related note, we are trying to plan a large vacation and I have extensive dental work planned and now this. The Lord provides; the Discover Card people raised our limit by $2000 last week. While I don’t like to use credit, I am OK with it for these types of things. I have a hard time planning for the vacation without having all the money in hand right now to pay for all the pieces.
And on top of this all, I got either a migraine or a sinus headache last night. No sewing got done, but nothing else was urgent, so I was a slug and was OK with it.
Tuesday, April 08, 2008
Tupperware
Well, no quilting got done yesterday, but I went to a Tupperware party. I bought the cupcake transporter thingy.
Goal for tonight is to clean up my house. It’s in pretty good shape, so it should be a quick tidy. Laundry, folding and then some sewing.
Goal for tonight is to clean up my house. It’s in pretty good shape, so it should be a quick tidy. Laundry, folding and then some sewing.
Monday, April 07, 2008
Successful Sunday
What a great Sunday! More fantastic sewing got done.
I did go through the green Ziploc of scraps and half the bag was 2.5" strips, 2" strips or bindings. So I put all of those things in their home, leaving just the scraps.
I also handled all the 3.5" strips that I cut for the Patches and Pinwheels (P&P). I ran out of cut lights, so the remaining green strips were put into a newly created 3.5" strips Ziploc. Overall, I made 11 A pinwheels and 12 B pinwheels (they spin different ways) in green. That’s like nearly 100 HSTs.
I did also sew the 2" strips together greens and lights for P&P.
I unsewed the bad row on the little red mat and resewed it. So now it’s a teeny topper that needs some borders, etc.
Kim’s kit is ready, except for instructions.
Tomorrow’s goal will be to get Kim’s pack ready for mailing, and the 6 Chiclets. Bonus would be to start to finish the Sheri quilt. I do have a Tupperware party to attend.
I did go through the green Ziploc of scraps and half the bag was 2.5" strips, 2" strips or bindings. So I put all of those things in their home, leaving just the scraps.
I also handled all the 3.5" strips that I cut for the Patches and Pinwheels (P&P). I ran out of cut lights, so the remaining green strips were put into a newly created 3.5" strips Ziploc. Overall, I made 11 A pinwheels and 12 B pinwheels (they spin different ways) in green. That’s like nearly 100 HSTs.
I did also sew the 2" strips together greens and lights for P&P.
I unsewed the bad row on the little red mat and resewed it. So now it’s a teeny topper that needs some borders, etc.
Kim’s kit is ready, except for instructions.
Tomorrow’s goal will be to get Kim’s pack ready for mailing, and the 6 Chiclets. Bonus would be to start to finish the Sheri quilt. I do have a Tupperware party to attend.
Saturday, April 05, 2008
Saturday night news flash
A quick Saturday night update:
I did get the 150 2 patches done for my OC. I also sewed as much as I could on the CC with the milk crate strips I had cut. I netted 16 step 1 blocks and 16 step 2 blocks, plus more pieces for variety later on. I also cut 70 of the 150 dark squares needed for Kim’s GC 150 2 patches. So I got a lot done.
Tomorrow’s goal is the green Ziploc and its processing, finishing Kim’s kit so I can mail it to her and maybe the 3.5” strips for the Patches and Pinwheels. Those are all EZ angle units, so lots of cutting and sewing into HSTs and then into pinwheels.
Friday, April 04, 2008
Week 14 and Crushing
I started cutting in earnest last night after my class. I am cutting for 3 quilts, because, well, I am nutso. But you all knew that! All 3 are Bonnie quilts: Patches and Pinwheels, OC and GC, and CC.
I have all my small yardage stash in milk crates by color under my sewing table. I pulled out a crate and got to work. I did greens and a few reds. I only picked really dark values. I cut a 3.5, a 1.5 and 3 2 inchers. One 2 incher went into the GC pile, and another into the OC pile. The 3 other strips all went into their own piles for the other quilts. I then went into the green scrap Ziploc (those really tiny pieces) and busted some stash there too. The only modification I’m making to this milk crate cutting system is to remove all 2.5 strip pieces from the Ziplocs and handle them. I had started cutting for a Boxy Stars, so I can just continue with that.
I also cut up some COC for the P&P and the CC and added them to their respective strip piles. And I did find some solid white, so I cut that up for the OC for now. The whole process only netted 3 strings, which is nice.
I’m so glad someone mentioned cutting the WOF strips in half! I get more variety, but more importantly, stuff is just way less wonky. I cut the white strips in half and started sewing some greens to them for my 4 patches. I didn’t get very far, being tired, but I did cut for an hour.
So this week’s sewing goals (it’s week 14) are:
Go through green ziploc, take out 2.5 strips and process
6 Chiclets blocks
Kim’s GC packet – 150 2 patches (she needs small steps)
Sew 150 2 patches for OC
Sew up 3.5” P&P strips
Sew up 2” P&P strips into 2’s (need 4’s)
Sew up CC 2” strips – all steps will be involved!
Finish red dresser mat
Sheri quilt - progress
It’s a lot to do, but with the sewing area clean, it makes it far more enjoyable to be down there. I will be sewing hard and doing homework hard, as best as I can tell.
I have all my small yardage stash in milk crates by color under my sewing table. I pulled out a crate and got to work. I did greens and a few reds. I only picked really dark values. I cut a 3.5, a 1.5 and 3 2 inchers. One 2 incher went into the GC pile, and another into the OC pile. The 3 other strips all went into their own piles for the other quilts. I then went into the green scrap Ziploc (those really tiny pieces) and busted some stash there too. The only modification I’m making to this milk crate cutting system is to remove all 2.5 strip pieces from the Ziplocs and handle them. I had started cutting for a Boxy Stars, so I can just continue with that.
I also cut up some COC for the P&P and the CC and added them to their respective strip piles. And I did find some solid white, so I cut that up for the OC for now. The whole process only netted 3 strings, which is nice.
I’m so glad someone mentioned cutting the WOF strips in half! I get more variety, but more importantly, stuff is just way less wonky. I cut the white strips in half and started sewing some greens to them for my 4 patches. I didn’t get very far, being tired, but I did cut for an hour.
So this week’s sewing goals (it’s week 14) are:
Go through green ziploc, take out 2.5 strips and process
6 Chiclets blocks
Kim’s GC packet – 150 2 patches (she needs small steps)
Sew 150 2 patches for OC
Sew up 3.5” P&P strips
Sew up 2” P&P strips into 2’s (need 4’s)
Sew up CC 2” strips – all steps will be involved!
Finish red dresser mat
Sheri quilt - progress
It’s a lot to do, but with the sewing area clean, it makes it far more enjoyable to be down there. I will be sewing hard and doing homework hard, as best as I can tell.
Wednesday, April 02, 2008
Does this count?
I cleaned up my sewing space last night. The cutting board, the machine, the ironing board and all the little places I leave stuff all over the room are all now tidy. I realized I was avoiding sewing and even going into the basement (my sewing room is in our fully finished basement, which is also our family room) because of the mess.
So I stopped worrying about cutting up scraps and just cleaned everything up. Some of it was not so elegant (shove pieces-parts of projects into a really big banker’s box so that least the nuttiness is together), but all the surfaces are clean and dusted. I can start anew.
I am also very excited to read that it will be a full 2 weeks before another clue is posted. I’m nowhere near ready to start sewing, plus I need to cut Kim’s out at the same time. Plus I have 2 tests and one presentation in the next 3 weeks from today, so I pace myself. Grad school continues to kick my butt, but there are only 6 more weeks and then 14 glorious weeks of summertime.
But at least I can set foot in my sewing area again!
So I stopped worrying about cutting up scraps and just cleaned everything up. Some of it was not so elegant (shove pieces-parts of projects into a really big banker’s box so that least the nuttiness is together), but all the surfaces are clean and dusted. I can start anew.
I am also very excited to read that it will be a full 2 weeks before another clue is posted. I’m nowhere near ready to start sewing, plus I need to cut Kim’s out at the same time. Plus I have 2 tests and one presentation in the next 3 weeks from today, so I pace myself. Grad school continues to kick my butt, but there are only 6 more weeks and then 14 glorious weeks of summertime.
But at least I can set foot in my sewing area again!
Friday, March 28, 2008
Crushing
OMG are we all just over the top with the craving of the CRUSH? I cannot wait for this new mystery! I’ve decided on some color schemes and some sewing methodologies. Here are my ramblings.
I’ve been attempting to cut scraps for a while now, but grad school is getting in the way. I have been cutting for the CC, the OC and Boxy Stars (I like Bonnie quilts – can’t you tell?!?!?). I am definitely using a bright pink batik for the main color (the red) in the CC, so I can’t make a Strawberry Crush. I’m liking the idea of a Orange Crush, as Nancy Mac in IL has reminded us all that U of I’s student cheering section is the Orange Crush (it’s also the name of the Palumbo company after the trouble settled, for those of you in Chicago who know that the Earth Moves with Palumbo). I was planning to send mystery packs to my sister Kim for CC, but I’m thinking she needs a Grape Crush, as she is a huge purple person. So…
My CC colors are scrappy, light creams and pink batik.
My OC colors are orange, purple, red and blue for the accent (just like Bonnie, but purple for black). White will be my light. (Can’t be a dreamsicle with cream….)
Kim’s OC colors should be purple, red, green and yellow for the accent. White will be her light.
I have not had time to shop the stash. Ted is traveling next week, so I am trying to get as much homework done as possible while he’s around to attend to DD, so that when he’s gone, DD and I can hang out. I will be sewing (more like cutting) and she will be doing whatever 7 year olds do!
I hope to shop the stash tonight. I am fairly certain that any orange that I may have it not a lot and not to my liking. I mean, I like it, but it’s from Becky, and I don’t love it, in the OMG I must buy that love it sense. I hope I have enough purple. So overall, I’m thinking of some Moda marbles for the purple and the orange. The rest should be scraps.
So bring on April 1!
I’ve been attempting to cut scraps for a while now, but grad school is getting in the way. I have been cutting for the CC, the OC and Boxy Stars (I like Bonnie quilts – can’t you tell?!?!?). I am definitely using a bright pink batik for the main color (the red) in the CC, so I can’t make a Strawberry Crush. I’m liking the idea of a Orange Crush, as Nancy Mac in IL has reminded us all that U of I’s student cheering section is the Orange Crush (it’s also the name of the Palumbo company after the trouble settled, for those of you in Chicago who know that the Earth Moves with Palumbo). I was planning to send mystery packs to my sister Kim for CC, but I’m thinking she needs a Grape Crush, as she is a huge purple person. So…
My CC colors are scrappy, light creams and pink batik.
My OC colors are orange, purple, red and blue for the accent (just like Bonnie, but purple for black). White will be my light. (Can’t be a dreamsicle with cream….)
Kim’s OC colors should be purple, red, green and yellow for the accent. White will be her light.
I have not had time to shop the stash. Ted is traveling next week, so I am trying to get as much homework done as possible while he’s around to attend to DD, so that when he’s gone, DD and I can hang out. I will be sewing (more like cutting) and she will be doing whatever 7 year olds do!
I hope to shop the stash tonight. I am fairly certain that any orange that I may have it not a lot and not to my liking. I mean, I like it, but it’s from Becky, and I don’t love it, in the OMG I must buy that love it sense. I hope I have enough purple. So overall, I’m thinking of some Moda marbles for the purple and the orange. The rest should be scraps.
So bring on April 1!
Monday, March 24, 2008
sleeping bag
I did get a LOT of response to my sleeping bag request. Here are my thoughts:
The prevailing size was 7 feet by 7 feet, folded over like a taco. That seems simple enough to make. If they are 12” squares, then it would be 49 squares. I may just make a quilt for both sides to bust more stash and try some new techniques. (Like I need a new project…)
One website I found had some really cool handles. It ties it up like a duffle and then also gives the cross handle to allow you to carry it. Now that sounds like a plan.
Now on to materials. I’m thinking Thinsulate for the batting. Or Thinsulate with Warm and Natural to get some loft. Please have suggested flannel for the squares (or at least the lining that touches your body), but I don’t have any in my stash. I will need a really big zipper. I know you can do them without the zip, but I would prefer the zip. Www.seattlefabrics.com seems to have a lot of good stuff.
So now it’s a matter of getting to it. The first overnight thing we have is this coming weekend and it’s for about 16 hours (whatever) and we are in cabins or bunkhouses or something because she is only a Brownie. We’ll see how that goes. She’s already decided we should put the ugly quilt down as a mattress and then sleep on top of that. Sounds like a plan.
The prevailing size was 7 feet by 7 feet, folded over like a taco. That seems simple enough to make. If they are 12” squares, then it would be 49 squares. I may just make a quilt for both sides to bust more stash and try some new techniques. (Like I need a new project…)
One website I found had some really cool handles. It ties it up like a duffle and then also gives the cross handle to allow you to carry it. Now that sounds like a plan.
Now on to materials. I’m thinking Thinsulate for the batting. Or Thinsulate with Warm and Natural to get some loft. Please have suggested flannel for the squares (or at least the lining that touches your body), but I don’t have any in my stash. I will need a really big zipper. I know you can do them without the zip, but I would prefer the zip. Www.seattlefabrics.com seems to have a lot of good stuff.
So now it’s a matter of getting to it. The first overnight thing we have is this coming weekend and it’s for about 16 hours (whatever) and we are in cabins or bunkhouses or something because she is only a Brownie. We’ll see how that goes. She’s already decided we should put the ugly quilt down as a mattress and then sleep on top of that. Sounds like a plan.
low key weekend
Quilting this weekend was nearly non-existent. I did get all the scraps in the living and the kitchen sorted through and piled up on a cutting mat on the kitchen table, ready to be cut. Does that count?
It really just has come down to class being in the way. I had class Wed and Thurs night, so those 2 days were shot. Friday I did go into the basement and cut up some more scraps and make sense of more of my cutting table, but it’s never enough!
Saturday was spent cleaning house. Ugh, a nasty task, but someone has to do it, along with homework. Yesterday was also spent cleaning and doing homework, but I did spend like 45 minutes making hourglass blocks from a baggie of HSTs that I found. My goal is a table topper for a really smaller dresser that we have (14” x 20” for the top).
Tonight is the ISU game in the NIT and then tomorrow I can hopefully continue on the sewing path.
It really just has come down to class being in the way. I had class Wed and Thurs night, so those 2 days were shot. Friday I did go into the basement and cut up some more scraps and make sense of more of my cutting table, but it’s never enough!
Saturday was spent cleaning house. Ugh, a nasty task, but someone has to do it, along with homework. Yesterday was also spent cleaning and doing homework, but I did spend like 45 minutes making hourglass blocks from a baggie of HSTs that I found. My goal is a table topper for a really smaller dresser that we have (14” x 20” for the top).
Tonight is the ISU game in the NIT and then tomorrow I can hopefully continue on the sewing path.
Wednesday, March 19, 2008
Scraps take FOREVER to cut up!
I did go into my basement yesterday and spent 15 minutes cleaning up. Now, DH had recently gone through and reconfigured the basement and it looks very nice, EXCEPT for my pit of a sewing area. So all kinds of crap got piled up on my cutting table, including all of the paperwork my DH brings home from work but doesn’t know what to do with. ARGH!
So I cleaned up the edge of my cutting table, throwing away selvedges and putting scraps in a pile on my ironing board. After 15 minutes of that, I started to cut up the scraps on the ironing board, using a really small cutting board and ruler. I cut some 1.5 squares and 1.5 x 3.5 bricks for CC, and some appropriate things for Boxy Stars and some 2.5 squares for that box (eventual goal: cathedral windows quilt) and some 2” strips for the new mystery.
I cut for like 30 minutes and I only got through half of my teeny pile. Man!
I hope to continue chipping away at it. I didn’t get to make foundations for string blocks nor prep my machine area, nor did I work on Sheri’s quilt. But I did get a lot done on my group work for class, so that has to count for something.
I did go into my basement yesterday and spent 15 minutes cleaning up. Now, DH had recently gone through and reconfigured the basement and it looks very nice, EXCEPT for my pit of a sewing area. So all kinds of crap got piled up on my cutting table, including all of the paperwork my DH brings home from work but doesn’t know what to do with. ARGH!
So I cleaned up the edge of my cutting table, throwing away selvedges and putting scraps in a pile on my ironing board. After 15 minutes of that, I started to cut up the scraps on the ironing board, using a really small cutting board and ruler. I cut some 1.5 squares and 1.5 x 3.5 bricks for CC, and some appropriate things for Boxy Stars and some 2.5 squares for that box (eventual goal: cathedral windows quilt) and some 2” strips for the new mystery.
I cut for like 30 minutes and I only got through half of my teeny pile. Man!
I hope to continue chipping away at it. I didn’t get to make foundations for string blocks nor prep my machine area, nor did I work on Sheri’s quilt. But I did get a lot done on my group work for class, so that has to count for something.
Tuesday, March 18, 2008
Nothing Much
No quilting last night - too tired. I conked out at 9pm.
I have a group meeting right after work today, so that will get lots of homework accomplished. I do have some marketing homework to do as well.
But most importantly, tonight I hope to go downstairs and spend 15 minutes picking up, 15 minutes cutting, and preparing to make string blocks (cut foundations, get area set up, load scrap thread into bobbins, etc.).
The other goal is to prep the Sheri quilt for quilting. I hope to hit that tonight as well.
I have a group meeting right after work today, so that will get lots of homework accomplished. I do have some marketing homework to do as well.
But most importantly, tonight I hope to go downstairs and spend 15 minutes picking up, 15 minutes cutting, and preparing to make string blocks (cut foundations, get area set up, load scrap thread into bobbins, etc.).
The other goal is to prep the Sheri quilt for quilting. I hope to hit that tonight as well.
Monday, March 17, 2008
Week 10 wrap-up / National Quilting Day update
OK, I’m a few days late, but what can I say? We had a busy weekend up in greater Chicagoland, so this is the first time I’ve been able to post.
I did finish my Bargello Bowl quilt. It turned out to be 58 x 70 and it was just darling. I made it for the fundraiser organized by my co-worker. Their goal was $10k and they raised $20k, so it was a huge success! And that was my National Quilting Day.
No other sewing to speak of.
Week 11 goals:
10 string blocks
3 bags for the quilts at work.
It’s not much, but I need to get some serious study time in as well.
I did finish my Bargello Bowl quilt. It turned out to be 58 x 70 and it was just darling. I made it for the fundraiser organized by my co-worker. Their goal was $10k and they raised $20k, so it was a huge success! And that was my National Quilting Day.
No other sewing to speak of.
Week 11 goals:
10 string blocks
3 bags for the quilts at work.
It’s not much, but I need to get some serious study time in as well.
Thursday, March 13, 2008
No update yesterday; I give you 3 little words – blind puking migraine. I spent the entire day in fetal position in a dark room. It was really bad. So bad that my husband asked me 4 times if I was pregnant. Now that’s bad.
I did finish the bargello top and also got the whole thing sandwiches Tuesday night. I tried a new method of sandwiching; I put the top on the batting, trimmed the batting down to a reasonable amount all around and then added the backing to the sandwich. This seemed to work much better, as I already knew the top was smooth and fit the batting. So then the only goal when I turned the sandwich over was to cover all the batting with backing and smooth it out. Don’t ask me why, but it worked.
So last night’s goal was to quilt the thing. I only plan on doing diagonal lines every other square, but I only got 5 lines sewn before I had to go back and lie down. It was truly horrible. I hope to quilt like mad tonight and get the binding on, and then if I am certain I can finish up Friday night, I will email my co-worker tomorrow and ask her where I can drop off the donation item Saturday morning. It turned out really cute. It is truly a pattern that is as easy as Bonnie says and it’s one you can do during the work week if you’re diligent. So I’ll definitely be cutting some 2.5 strips too, if I ever get to cutting!
OK, back to work…
I did finish the bargello top and also got the whole thing sandwiches Tuesday night. I tried a new method of sandwiching; I put the top on the batting, trimmed the batting down to a reasonable amount all around and then added the backing to the sandwich. This seemed to work much better, as I already knew the top was smooth and fit the batting. So then the only goal when I turned the sandwich over was to cover all the batting with backing and smooth it out. Don’t ask me why, but it worked.
So last night’s goal was to quilt the thing. I only plan on doing diagonal lines every other square, but I only got 5 lines sewn before I had to go back and lie down. It was truly horrible. I hope to quilt like mad tonight and get the binding on, and then if I am certain I can finish up Friday night, I will email my co-worker tomorrow and ask her where I can drop off the donation item Saturday morning. It turned out really cute. It is truly a pattern that is as easy as Bonnie says and it’s one you can do during the work week if you’re diligent. So I’ll definitely be cutting some 2.5 strips too, if I ever get to cutting!
OK, back to work…
Tuesday, March 11, 2008
Bargello Progress - Monday Night
Well, last night I made progress on the bargello, but did not make it all the way to where I wanted to be. I did get both uphill panels done and one of the downhill panels. The downhill one required some serious unpicking, so then I quit. I thought I did pretty damned good, despite having a church meeting thrown in there last night.
So tonight’s goal becomes the last downhill panel, assembly of the top, including borders and sandwiching the quilt. I would like to quilt it tomorrow night and then just have the binding to do on Thursday. If I’m really industrious tonight, I may start the quilting process. I’m thinking of just doing simple diagonal lines every other strip and extending it through the borders. I’m marketing this one as a TV time quilt for the auction. Here’s hoping I make it.
I really like this pattern; it grew on me over time. I think I will cut some 2.5 strips and start keeping them handy. I would like to make one where the color placement of the strips is all the same and then I’d like to just make one that’s huge but all random all over. So maybe I’ll add that to the cutting list, which of course, I should start executing!
So tonight’s goal becomes the last downhill panel, assembly of the top, including borders and sandwiching the quilt. I would like to quilt it tomorrow night and then just have the binding to do on Thursday. If I’m really industrious tonight, I may start the quilting process. I’m thinking of just doing simple diagonal lines every other strip and extending it through the borders. I’m marketing this one as a TV time quilt for the auction. Here’s hoping I make it.
I really like this pattern; it grew on me over time. I think I will cut some 2.5 strips and start keeping them handy. I would like to make one where the color placement of the strips is all the same and then I’d like to just make one that’s huge but all random all over. So maybe I’ll add that to the cutting list, which of course, I should start executing!
Monday, March 10, 2008
bargello progress...
Well the quilt show was a success, despite the new location. More on that in another post when I actually have PICTURES!!!!
Anyway, Bonnie just revealed the start of what to cut for the April mystery. Now it seems stupid to start the April mystery while I’m not even really going on the CC mystery, but hey. So I have revised my cutting goals:
100 – 1.5 squares
100 – 1.5 x 3.5 strips
50 sets – 2.5 squares and 2.5 x 4.5 bricks (2.5 x 7)
50 sets – 2.5 x 4.5 bricks and 2.5 x 6.5 bricks (2.5 x 11)
2 inch strips
3.5 strips
On other fronts, I went down to my sewing room last night at like 9 and started to sew on the bargello. If I want to give it to my co-worker for the fundraiser, I need to give it to her Friday morning and time’s a-wasting, so I got the other 3 strip sets done. So now I have all 4 strip sets done. Tonight’s goal is to make the 2 uphill and the 2 downhill panels, all around having to go to a church meeting and also around handling some other stuff.
Then tomorrow I can finish the top and make the sandwich. Wednesday I can quilt it simply and Thursday I can bind it. If I can do this, it will make my day!
Anyway, Bonnie just revealed the start of what to cut for the April mystery. Now it seems stupid to start the April mystery while I’m not even really going on the CC mystery, but hey. So I have revised my cutting goals:
100 – 1.5 squares
100 – 1.5 x 3.5 strips
50 sets – 2.5 squares and 2.5 x 4.5 bricks (2.5 x 7)
50 sets – 2.5 x 4.5 bricks and 2.5 x 6.5 bricks (2.5 x 11)
2 inch strips
3.5 strips
On other fronts, I went down to my sewing room last night at like 9 and started to sew on the bargello. If I want to give it to my co-worker for the fundraiser, I need to give it to her Friday morning and time’s a-wasting, so I got the other 3 strip sets done. So now I have all 4 strip sets done. Tonight’s goal is to make the 2 uphill and the 2 downhill panels, all around having to go to a church meeting and also around handling some other stuff.
Then tomorrow I can finish the top and make the sandwich. Wednesday I can quilt it simply and Thursday I can bind it. If I can do this, it will make my day!
Friday, March 07, 2008
Scraps scraps
What to cut? I just don’t know.
Let’s see, we need 3.5 x 1.5 for CC as well as a ton of 1.5 squares. No more than 100 of each color.
Then I really should have on hand some quilts to give away. I have a girl one ready and the boy one is a flimsy, so that’s covered. I think a few lap ones and a few full ones would be good.
I like the idea of a Sudoku quilt and I know my MIL would like a quilt from me, but I’m pretty sure my scraps will not yield me 9 squares per fabric in the size I need. So there went that idea. I also really like the bargello, but I would love to do them where the strips are the same in each panel. Alas, that will be a stash cutting item, not a scrap one.
I really like Bonnie’s Boxy Stars, so maybe I should just cut a bunch of 2.5 strips. Since the rectangles are really pretty small (2.5 square and 2.5 x 4.5 rectangle), I think I could get a fair amount of them out of the scrap bag.
So let’s try that.
100 – 1.5 squares
100 – 1.5 x 3.5 bricks
100 pairs of 2.5 squares and 2.5 x 4.5 bricks
Let’s see, we need 3.5 x 1.5 for CC as well as a ton of 1.5 squares. No more than 100 of each color.
Then I really should have on hand some quilts to give away. I have a girl one ready and the boy one is a flimsy, so that’s covered. I think a few lap ones and a few full ones would be good.
I like the idea of a Sudoku quilt and I know my MIL would like a quilt from me, but I’m pretty sure my scraps will not yield me 9 squares per fabric in the size I need. So there went that idea. I also really like the bargello, but I would love to do them where the strips are the same in each panel. Alas, that will be a stash cutting item, not a scrap one.
I really like Bonnie’s Boxy Stars, so maybe I should just cut a bunch of 2.5 strips. Since the rectangles are really pretty small (2.5 square and 2.5 x 4.5 rectangle), I think I could get a fair amount of them out of the scrap bag.
So let’s try that.
100 – 1.5 squares
100 – 1.5 x 3.5 bricks
100 pairs of 2.5 squares and 2.5 x 4.5 bricks
Week 10 goals
After spending like 15 minutes typing up my new goals and my Week 10 aspirations directly into the blogger window, when I tried to post, the computer ate it. So now I am back to my tried and true method of writing everything into a Word doc and then copying and pasting into the blogger window. Dang!
Anyway, as I am pretty much mentally (from getting ready for this quilt show) and physically (from the influenza) exhausted, I decided to rethink my approach for getting things done. I’m reaching the point that the weekly to-do list is too stressful and thus nothing is getting done. I also feel that I need to clean out my studio area and only leave one project out at a time, less I get distracted. And then Stashbusters has been discussing some rotation methods on how people get stuff done.
So I percolated all of that for a while, and I’ve decided that I will just start at the top of the QBW list over to the right and work on one item each week and then move on. The first item that needs to be done are some bags for quilts at work. Right now I have them rollup and sitting on my desk, but I’d like them with some sort of protective sleeve on there. Those will be a nice easy finish.
I have decided to put away the Batik Lover’s quilt for the remainder of this school term. I just need a break. It’s a lot of tedious pieces and one of the blocks that was swapped is frankly just wrong compared to what it should have been, so I will redo that one. I just need a break from that quilt.
So I think I will do an item on the list, and then do 10 string blocks. The only real ‘deadline’ that I have is to complete a Bargello Bowl for a fundraiser at work. So this weekend I might clean for 15, sew a panel, clean for 15, cut tubes, etc. The room needs to be tidied and I want to finish this quilt, so this very well may work out just fine.
So that is the new strategy I think. Let’s see how that goes for a while. I really need some finishes and I really need no deadlines.
I did have to dump out my entire blue scrap bag onto my cutting table (for various and sundry reasons). I didn’t repack it; I left it there, figuring I would do some serious cutting of the scraps. I need to cut in earnest for the Carolina Crossroads quilt and I need to think of some other shapes that I need and what quilts I would like in my inventory to just have on hand. Hmmm….
Anyway, as I am pretty much mentally (from getting ready for this quilt show) and physically (from the influenza) exhausted, I decided to rethink my approach for getting things done. I’m reaching the point that the weekly to-do list is too stressful and thus nothing is getting done. I also feel that I need to clean out my studio area and only leave one project out at a time, less I get distracted. And then Stashbusters has been discussing some rotation methods on how people get stuff done.
So I percolated all of that for a while, and I’ve decided that I will just start at the top of the QBW list over to the right and work on one item each week and then move on. The first item that needs to be done are some bags for quilts at work. Right now I have them rollup and sitting on my desk, but I’d like them with some sort of protective sleeve on there. Those will be a nice easy finish.
I have decided to put away the Batik Lover’s quilt for the remainder of this school term. I just need a break. It’s a lot of tedious pieces and one of the blocks that was swapped is frankly just wrong compared to what it should have been, so I will redo that one. I just need a break from that quilt.
So I think I will do an item on the list, and then do 10 string blocks. The only real ‘deadline’ that I have is to complete a Bargello Bowl for a fundraiser at work. So this weekend I might clean for 15, sew a panel, clean for 15, cut tubes, etc. The room needs to be tidied and I want to finish this quilt, so this very well may work out just fine.
So that is the new strategy I think. Let’s see how that goes for a while. I really need some finishes and I really need no deadlines.
I did have to dump out my entire blue scrap bag onto my cutting table (for various and sundry reasons). I didn’t repack it; I left it there, figuring I would do some serious cutting of the scraps. I need to cut in earnest for the Carolina Crossroads quilt and I need to think of some other shapes that I need and what quilts I would like in my inventory to just have on hand. Hmmm….
Week 9 wrap up report
Well, it's the end of week 9 and I sewed this week up to driving into work. Our quilt show is this weekend and my quilt is still not done. I have about a yard to whipstitch down and then I need to cut off the bottom and bind that quickly. Then it's off in the car to head north.
We will hang the entire show tonight. I'm doing my 2 volunteer hours tonight, as I have to drop off anyway. The influenza still is around, in the form of fatigue. I did get a hotel room for tonight so I don't even attempt the really long drive home. I did schedule breakfast with a girlfriend for Saturday morning and then I'll drive home.
We will hang the entire show tonight. I'm doing my 2 volunteer hours tonight, as I have to drop off anyway. The influenza still is around, in the form of fatigue. I did get a hotel room for tonight so I don't even attempt the really long drive home. I did schedule breakfast with a girlfriend for Saturday morning and then I'll drive home.
Thursday, March 06, 2008
I did decide to not complete the Batik Lover’s quilt for the show this weekend. I felt bad, but I told them in advance, and my friends have already covered me on it. It pays to be in the bee that is currently in charge/in power in the guild.
The crayon quilt needs about 4.5 hours more work and I need to leave for Crest Hill at like 4 tomorrow, so there’s a lot of quilting to be done. I’m not really thrilled with how the quilt turned out, but oh well. But I should make it and it will be OK.
The Dad quilt is already done, but not prepped for the show. That’s another hour of my life.
So home I go to sew before class.
The crayon quilt needs about 4.5 hours more work and I need to leave for Crest Hill at like 4 tomorrow, so there’s a lot of quilting to be done. I’m not really thrilled with how the quilt turned out, but oh well. But I should make it and it will be OK.
The Dad quilt is already done, but not prepped for the show. That’s another hour of my life.
So home I go to sew before class.
Thursday, February 28, 2008
Week 9 Goals and Ramblings
I’ve taken Leap Day off to get my tetanus shot for grad school and also to take DD for her annual physical, so the rest of the time I hope to quilt like a nut! I really need to in order to make the quilt show, which is a week from tomorrow!
Week 9 Goals:
Crayon quilt done (except for handsewing on back)
Batik Lover’s done (except for extra quilting DH wants)
Friday goal:
All crayons done. 4 are quilted and 5 are not there yet. I need to get the other 4 quilted, cut all crayons to the same size, attach binding to the bottom of each crayon and to the tips of each crayon. I then need to hand sew down these binding pieces. Then I need to add binding down the side of each crayon as single fold binding. Then I need to sew the crayons together, using that long binding. And then hand sew those bindings down (which will most likely happen after the show).
Other stuff:
The Batik Lover’s quilt needs to have the top pieced (halfway done), sandwiched and quilted. I want to see from DH what he wants and do about half of it before adding the binding. I can have it half quilted to his desire in order to hang it in the show.
So overall, my main weekend goal is to have everything together and need handwork. Anything else is gravy. As it is, this is gonna be hard.
Week 9 Goals:
Crayon quilt done (except for handsewing on back)
Batik Lover’s done (except for extra quilting DH wants)
Friday goal:
All crayons done. 4 are quilted and 5 are not there yet. I need to get the other 4 quilted, cut all crayons to the same size, attach binding to the bottom of each crayon and to the tips of each crayon. I then need to hand sew down these binding pieces. Then I need to add binding down the side of each crayon as single fold binding. Then I need to sew the crayons together, using that long binding. And then hand sew those bindings down (which will most likely happen after the show).
Other stuff:
The Batik Lover’s quilt needs to have the top pieced (halfway done), sandwiched and quilted. I want to see from DH what he wants and do about half of it before adding the binding. I can have it half quilted to his desire in order to hang it in the show.
So overall, my main weekend goal is to have everything together and need handwork. Anything else is gravy. As it is, this is gonna be hard.
Week 8 Report
Goals for this week:
All crayons quilted.
All crayons cut.
Batik Lover’s sandwiched.
After that, I really need to think about which way to go next.
And what I got done…
Orange crayon and black crayon. Not enough, but better than nothing.
My week ended this morning, as my week always begins when my work week ends, and I’ve taken tomorrow off. May I get a lot done tomorrow. DD wants to stay home with me instead of going to daycare, which is fine IF she understands that I have to put the pedal to the metal and get ‘r done.
All crayons quilted.
All crayons cut.
Batik Lover’s sandwiched.
After that, I really need to think about which way to go next.
And what I got done…
Orange crayon and black crayon. Not enough, but better than nothing.
My week ended this morning, as my week always begins when my work week ends, and I’ve taken tomorrow off. May I get a lot done tomorrow. DD wants to stay home with me instead of going to daycare, which is fine IF she understands that I have to put the pedal to the metal and get ‘r done.
Wednesday, February 27, 2008
Tuesday night
Well, I did finish the quilting on the orange crayon. I also did about 1/3 of the quilting on the black crayon. Not enough for my liking, but better than none.
I did take Friday off, but of course, I'm done being queen on Friday at 6am. Go figure!
I did take Friday off, but of course, I'm done being queen on Friday at 6am. Go figure!
Tuesday, February 26, 2008
I don't wanna be queen
I am currently queen and will be until 6am Friday. Of course, I took off Friday to finish my 2 quilts for the show, so I will miss the queen thing by like 12 hours. How is that for my karma in life right about now?!?!?
I didn’t quilt last night, but I did work on my paper and I am also in receipt of 219 boxes of Girl Scout cookies. Oy.
I didn’t quilt last night, but I did work on my paper and I am also in receipt of 219 boxes of Girl Scout cookies. Oy.
Monday, February 25, 2008
week 8
Um, yeah, I’m a bit behind. It’s now week 8 in my quilting universe. In the last 4 weeks, I’ve been taking 2 insurance exams for work, 2 exams for grad school, handling my DD’s 7th birthday and having influenza. So, not a lot of sewing going on.
However, the quilt show is in less than 2 weeks. I have got to get me rear in gear to get the 2 quilts I am hanging done. So I did actually quilt some this weekend – I worked on crayons.
So as of right now:
Brown – sandwiched
Red – piecing
Orange – quilting
Yellow – done
Green – sandwiched
Blue – piecing
Purple – done
Black – sandwiched
As for the Batik Lover’s, the top and bottom piano key borders are done and the side are half-pieced. The 2 bottom rows are pieced together.
Goals for this week:
All crayons quilted.
All crayons cut.
Batik Lover’s sandwiched.
After that, I really need to think about which way to go next.
However, the quilt show is in less than 2 weeks. I have got to get me rear in gear to get the 2 quilts I am hanging done. So I did actually quilt some this weekend – I worked on crayons.
So as of right now:
Brown – sandwiched
Red – piecing
Orange – quilting
Yellow – done
Green – sandwiched
Blue – piecing
Purple – done
Black – sandwiched
As for the Batik Lover’s, the top and bottom piano key borders are done and the side are half-pieced. The 2 bottom rows are pieced together.
Goals for this week:
All crayons quilted.
All crayons cut.
Batik Lover’s sandwiched.
After that, I really need to think about which way to go next.
Wednesday, February 20, 2008
Well, I have good news and bad news.
The good news is that I quilted for about 25 minutes yesterday. I did complete the purple braid quilting. I also started to finish the orange braid quilting, but the bobbin ran out and the bobbin winder is 2 floors below this machine. I did not sew on the black or red braids, nor did I unpick anything.
Tonight I have one test. The goal would be to finish the orange braid, sew 10 on black and red and unpick the brown braid. Slowly but surely, I will get there.
The good news is that I quilted for about 25 minutes yesterday. I did complete the purple braid quilting. I also started to finish the orange braid quilting, but the bobbin ran out and the bobbin winder is 2 floors below this machine. I did not sew on the black or red braids, nor did I unpick anything.
Tonight I have one test. The goal would be to finish the orange braid, sew 10 on black and red and unpick the brown braid. Slowly but surely, I will get there.
Tuesday, February 19, 2008
an actual quilty update
The flu and my hands are not getting along. If this is what arthritis feels like, y’all can have it! My hands ache something fierce non-stop.
I did take some time on Sunday at sew on the purple crayon. Each crayon has 3 steps: the braid, the sandwiching and the quilting (on each braid). The yellow crayon is all done. The orange one still needs some quilting, as I ran out of thread and have since bought more. The purple crayon needed to be quilted, and as of right now is ¾ of the way done.
The other 5 crayons suffer from the fatal design flaw and all need to be fixed, rebraided (can we all say ‘y-seams’?) and then have steps 2 and 3 done. My goal this weekend, and it’s been weeks since I had any quilting goals, is to get this stupid crayon quilt done. I work only until 1 on Friday, so that gives me Friday night. Saturday we need to go to Chicago, but I should be able to get something done that night. Sunday is DD’s kid party, but that is not at my house, so I am hoping that I can get more done Sunday night.
Mini-goal: finish purple crayon and orange crayon tonight. Sew 10 strips on the black braid and on the red braid. Unpick brown braid.
Let’s see how this goes. Recovering from this flu is like recovering from mono.
I did take some time on Sunday at sew on the purple crayon. Each crayon has 3 steps: the braid, the sandwiching and the quilting (on each braid). The yellow crayon is all done. The orange one still needs some quilting, as I ran out of thread and have since bought more. The purple crayon needed to be quilted, and as of right now is ¾ of the way done.
The other 5 crayons suffer from the fatal design flaw and all need to be fixed, rebraided (can we all say ‘y-seams’?) and then have steps 2 and 3 done. My goal this weekend, and it’s been weeks since I had any quilting goals, is to get this stupid crayon quilt done. I work only until 1 on Friday, so that gives me Friday night. Saturday we need to go to Chicago, but I should be able to get something done that night. Sunday is DD’s kid party, but that is not at my house, so I am hoping that I can get more done Sunday night.
Mini-goal: finish purple crayon and orange crayon tonight. Sew 10 strips on the black braid and on the red braid. Unpick brown braid.
Let’s see how this goes. Recovering from this flu is like recovering from mono.
Saturday, February 16, 2008
a-ha!
Now I know why I've been in a funk. I have influenza! I did have the shot and I have a mild case, but still, it saps your energy.
I postponed DD's birthday party for today until March 1. Currently Ted is taking her to the mall and we will head out for an early supper at Chili's. I am just exhausted. I try to study for 15 minutes and do light housework for 15 minutes. I did that for 5 hours yesterday and then I picked up the living room of toys during the news hour at 5. By 7:30 last night I was in bed and promptly slept 12 hours.
So now it is all about pacing. I need to get through these tests this upcoming week, so that is my number 1 concern. I did allow myself to start on the bargello when last I sewed and I did get one panel sewn together, so now it needs pressing and cutting and all of that. The pain in my hands is unbelievable from the flu, so I may just progress on anything that doesn't require precision cutting. I can get pretty far I think.
So it's all about pacing and regaining strength. I think I can make all of my deadlines if I just take one bite at a time.
I postponed DD's birthday party for today until March 1. Currently Ted is taking her to the mall and we will head out for an early supper at Chili's. I am just exhausted. I try to study for 15 minutes and do light housework for 15 minutes. I did that for 5 hours yesterday and then I picked up the living room of toys during the news hour at 5. By 7:30 last night I was in bed and promptly slept 12 hours.
So now it is all about pacing. I need to get through these tests this upcoming week, so that is my number 1 concern. I did allow myself to start on the bargello when last I sewed and I did get one panel sewn together, so now it needs pressing and cutting and all of that. The pain in my hands is unbelievable from the flu, so I may just progress on anything that doesn't require precision cutting. I can get pretty far I think.
So it's all about pacing and regaining strength. I think I can make all of my deadlines if I just take one bite at a time.
Friday, February 08, 2008
hiding out...and thinking too much
I’m been laying low. Sorry about that. It’s been all about school and tests and it really won’t let up until about Feb 29.
I have not been able to sew. Last weekend I took the time to sew some Valentine’s postcards that were on a panel from last year. That was fun and fast. So that busted an infinitesimal amount of stash and nearly a whole spool of deep red thread. It was nice to do something new.
My sewing funk comes from the idea that I absolutely must finish 1 table runner and 2 quilts for the quilt show in a month. Yes, I know, people work better under a deadline and I am no exception, but since I’ve decided to get UFOs done, starting with those, I’ve been in a funk. And I’ve had to stop myself from full-blown launching into the New Year’s Sudoku quilt challenge, Carolina Crossroads in full force, SITP and the Bargello bowl. 4 items that would have turned into UFOs because another 4 cool ideas would have come along to start. At least I know the source of my madness.
Another question that is coming up in my mind is if I make all these quilts, then where to they all go? Yes I can give them away, but I like these patterns and frankly would like to keep them. But for what? Where? Why? This is moving me deeper into the funk.
Meanwhile I have the family DD birthday party on the 16th (have to clean), 3 exams in 2 days on the 20th and 21st, and then the kid party on the 24th (at the place, not at my house). And Ted is traveling for 5 of those 16 days. My stress is stressed just thinking of everything that needs to be done.
So in order to cope, I have to get a lot of studying done, but besides that, I’ve decided that I will work to certain defined points on the 2 quilts, try to accomplish the table runner, do one or two bobbins’ worth of FMQ on an older UFO (a Bonnie My Blue Heaven) and I can start the bargello. I actually cut an entire 2 gallon Ziploc of 2.5 strips when I was doing the cutting for the Dad quilt. I cut a 5” WOF piece, cut 2 nickels for the bin, 1 nickel for a disappearing 9-patch (a UFO, sadly), pieces for the Dad quilt (a Bonnie Backroads to OK) and then took the rest and cut it lengthwise into 2.5” strips and said hey here we go. I know that there are over 128 different fabs in that bag.
My thought process involved a girl here at work. I have had the pleasure of working with her because I took on a task for the time being at the request of management. She is trying to get pregnant and is having a medical hard time. Since I have had all the troubles I have had, I can relate. So I went by her cube today for some work related thing and she has a sign posted for a benefit (needing silent auction items!!!) for a little boy that is ill. Her DH is a cop and one of the parents of this little boy is a cop or a firefighter or some other civil servant. So I figured I would donate the bargello to the silent auction and the My Blue Heaven to the boy. This way I get to work on new stuff, it doesn’t become another UFO, an old UFO gets finished and put to good use, I and the 3 things I need to get done for the show will see some progress.
How I will manage quilting, cleaning and studying is something I haven’t figured out yet. Work hard, play hard I guess.
I have not been able to sew. Last weekend I took the time to sew some Valentine’s postcards that were on a panel from last year. That was fun and fast. So that busted an infinitesimal amount of stash and nearly a whole spool of deep red thread. It was nice to do something new.
My sewing funk comes from the idea that I absolutely must finish 1 table runner and 2 quilts for the quilt show in a month. Yes, I know, people work better under a deadline and I am no exception, but since I’ve decided to get UFOs done, starting with those, I’ve been in a funk. And I’ve had to stop myself from full-blown launching into the New Year’s Sudoku quilt challenge, Carolina Crossroads in full force, SITP and the Bargello bowl. 4 items that would have turned into UFOs because another 4 cool ideas would have come along to start. At least I know the source of my madness.
Another question that is coming up in my mind is if I make all these quilts, then where to they all go? Yes I can give them away, but I like these patterns and frankly would like to keep them. But for what? Where? Why? This is moving me deeper into the funk.
Meanwhile I have the family DD birthday party on the 16th (have to clean), 3 exams in 2 days on the 20th and 21st, and then the kid party on the 24th (at the place, not at my house). And Ted is traveling for 5 of those 16 days. My stress is stressed just thinking of everything that needs to be done.
So in order to cope, I have to get a lot of studying done, but besides that, I’ve decided that I will work to certain defined points on the 2 quilts, try to accomplish the table runner, do one or two bobbins’ worth of FMQ on an older UFO (a Bonnie My Blue Heaven) and I can start the bargello. I actually cut an entire 2 gallon Ziploc of 2.5 strips when I was doing the cutting for the Dad quilt. I cut a 5” WOF piece, cut 2 nickels for the bin, 1 nickel for a disappearing 9-patch (a UFO, sadly), pieces for the Dad quilt (a Bonnie Backroads to OK) and then took the rest and cut it lengthwise into 2.5” strips and said hey here we go. I know that there are over 128 different fabs in that bag.
My thought process involved a girl here at work. I have had the pleasure of working with her because I took on a task for the time being at the request of management. She is trying to get pregnant and is having a medical hard time. Since I have had all the troubles I have had, I can relate. So I went by her cube today for some work related thing and she has a sign posted for a benefit (needing silent auction items!!!) for a little boy that is ill. Her DH is a cop and one of the parents of this little boy is a cop or a firefighter or some other civil servant. So I figured I would donate the bargello to the silent auction and the My Blue Heaven to the boy. This way I get to work on new stuff, it doesn’t become another UFO, an old UFO gets finished and put to good use, I and the 3 things I need to get done for the show will see some progress.
How I will manage quilting, cleaning and studying is something I haven’t figured out yet. Work hard, play hard I guess.
Sunday, February 03, 2008
Postcards
I just made my first postcards! I had a Sandy Gervais panel from last year (the valentine fabs) and it had 6 postcards on it. Well, I just got those made up and they are all addressed and ready to go to the post office. That was so easy!
I also finished my Easter egg coasters this morning. The 2 big table topper eggs are also done, so that is a huge thing off my list.
We did go out yesterday and buy the back for the batik lover's quilt. The top has half the rows done and half of the piano key border done. I'd sew today, but no, I have to volunteer for soccer registration (why on the Superbowl?!?!?) and then head to a party. So no more sewing for me.
I also finished my Easter egg coasters this morning. The 2 big table topper eggs are also done, so that is a huge thing off my list.
We did go out yesterday and buy the back for the batik lover's quilt. The top has half the rows done and half of the piano key border done. I'd sew today, but no, I have to volunteer for soccer registration (why on the Superbowl?!?!?) and then head to a party. So no more sewing for me.
Saturday, February 02, 2008
SNOW DAY!
It was a great snow day. I haven't had one as an adult ever, so we had lots of fun. I put 2 rows together of my batik lover's quilt and did 2 sides of the piano key border. I did study 2 chapters for school. We shovelled snow while DD played in it and then I made blondies with cinnamon chips. Yummy! And had hot cocoa! Penny, the whole area was just shut down, so your niece was no doubt at home. They don't exactly plow well. At least my prof let us out early on Thursday night by half an hour.
Today we need to run to Morton to get the back for the batik lover's quilt. It's for DH and so he has to pick the back. I'm hanging this quilt in a show in March, so I need to shake a leg on it. It is turning out beautiful. DH just loves batiks, and it was a guild swap last year for the blocks, so it seemed like a perfect fit. Of course, there's nothing like waiting until the last minute to get it done!
Today we need to run to Morton to get the back for the batik lover's quilt. It's for DH and so he has to pick the back. I'm hanging this quilt in a show in March, so I need to shake a leg on it. It is turning out beautiful. DH just loves batiks, and it was a guild swap last year for the blocks, so it seemed like a perfect fit. Of course, there's nothing like waiting until the last minute to get it done!
Monday, January 28, 2008
Carolina Crossroads - cutting has commenced!
I actually dipped my big toe in the water! As I was cutting all of my piano keys from 1.5” strips, I saved everything that was greater than a square and less than the smallest key I needed, which was 3.5”. So I have some 9 patch squares going! I’m so excited!
I also found a lovely pink batik that I may use as the focus fabric. I want to see how much of it I have. I remember I bought whatever was on the bolt. Here’s hoping it’s a lot, like 3+ yards.
I want to make the quilt longer, so I need to make one more ring row and one more star row. That means I will have to make 9 extra blocks total. So I spent some time on that math as well.
I also found a lovely pink batik that I may use as the focus fabric. I want to see how much of it I have. I remember I bought whatever was on the bolt. Here’s hoping it’s a lot, like 3+ yards.
I want to make the quilt longer, so I need to make one more ring row and one more star row. That means I will have to make 9 extra blocks total. So I spent some time on that math as well.
weekend update
Thursday – I PASSED MY TEST! However, I had class, so nothing really happened that evening except me lying around and vegging before class. I had earned it!
Friday – DAY OFF! First I went through and finished the other 9 Chiclets blocks that are homework here for Q1. That was a huge pain in the butt off my mind. Then I went in search of my St. Pat’s stuff and it has disappeared. Well dang! The point was to find it and make a silent auction item from it, as the show is a week before St. Pat’s.
So I dropped back 10 and punted. I found my unused Easter fabrics and decided on making a huge striped egg for a table topper. So I cut strips, prepped a back with batting, and I was off to the races. By the end of the evening, I had the whole thing sewn. It was 18 inches wide and the WOF, so I was hoping to get 2 eggs out of it. I got 2 eggs and 11 little eggs for coasters, so when I determine the yards from stash, I will just use 18 inches and the WOF. There was very little waste.
Saturday – We started the morning with no power, so that was an adventure. I did a lot of housework type stuff and errand type stuff, so no so much sewing. I did start cutting the piano keys for the batik quilt.
The batik quilt was a pattern from a magazine called the Puzzler and our guild called it the batik lover’s quilt. Each person was to make 12 of one square and we were to swap. Included in our swap bag were to be some extra strips for the piano key border to provide unity and continuity throughout the quilt. So I started pressing, measuring, sorting and cutting those out. (By the time I was done, I only had to supplement from stash for 5% of the keys, which isn’t bad.)
Sunday – I cut out 2 large Easter eggs and 11 small ones. I sewed the binding on the 2 big and one of the small and the one small did not turn out well. I may have to postcard finish those. I did get one of the bindings stitched down on the big one and it won’t lay 100% completely flat. I need to iron it and see if that helps.
I also finished cutting the piano key border for my batik quilt and started sewing it together. I got 52 of the 260 keys done and they are attached into 4 sections, making me about 20% of the way done. Whoever said that with scrap quilts, when you’re done cutting, you’re halfway done wasn’t kidding!
Friday – DAY OFF! First I went through and finished the other 9 Chiclets blocks that are homework here for Q1. That was a huge pain in the butt off my mind. Then I went in search of my St. Pat’s stuff and it has disappeared. Well dang! The point was to find it and make a silent auction item from it, as the show is a week before St. Pat’s.
So I dropped back 10 and punted. I found my unused Easter fabrics and decided on making a huge striped egg for a table topper. So I cut strips, prepped a back with batting, and I was off to the races. By the end of the evening, I had the whole thing sewn. It was 18 inches wide and the WOF, so I was hoping to get 2 eggs out of it. I got 2 eggs and 11 little eggs for coasters, so when I determine the yards from stash, I will just use 18 inches and the WOF. There was very little waste.
Saturday – We started the morning with no power, so that was an adventure. I did a lot of housework type stuff and errand type stuff, so no so much sewing. I did start cutting the piano keys for the batik quilt.
The batik quilt was a pattern from a magazine called the Puzzler and our guild called it the batik lover’s quilt. Each person was to make 12 of one square and we were to swap. Included in our swap bag were to be some extra strips for the piano key border to provide unity and continuity throughout the quilt. So I started pressing, measuring, sorting and cutting those out. (By the time I was done, I only had to supplement from stash for 5% of the keys, which isn’t bad.)
Sunday – I cut out 2 large Easter eggs and 11 small ones. I sewed the binding on the 2 big and one of the small and the one small did not turn out well. I may have to postcard finish those. I did get one of the bindings stitched down on the big one and it won’t lay 100% completely flat. I need to iron it and see if that helps.
I also finished cutting the piano key border for my batik quilt and started sewing it together. I got 52 of the 260 keys done and they are attached into 4 sections, making me about 20% of the way done. Whoever said that with scrap quilts, when you’re done cutting, you’re halfway done wasn’t kidding!
Week 5 goals
Goals for Week 5:
Pictures into guild for show
Crayons quilted:
Orange
Purple
Black
Red
Blue
Brown
Green
Table Runners for Quilt show
Pam
Other
St. Pat’s
January Table Runner
Batik Lover’s quilt
Carolina Crossroads
Chiclets
100th day of school quilt
Pictures into guild for show
Crayons quilted:
Orange
Purple
Black
Red
Blue
Brown
Green
Table Runners for Quilt show
Pam
Other
St. Pat’s
January Table Runner
Batik Lover’s quilt
Carolina Crossroads
Chiclets
100th day of school quilt
Week 4
Goals for Week 4:
Pictures into guild for show
Crayons quilted:
Orange
Purple
Black
Red
Blue
Brown
Green
Table Runners for Quilt show
Pam
Other
St. Pat’s
January Table Runner
Carolina Crossroads
Chiclets
100th day of school quilt
What I got done:
I passed my test! Since I passed, I took Friday off, so my quilty weekend started Thursday night.
Stashbusting efforts:
No buying and no sewing, so net effect of a big fat zero.
Pictures into guild for show
Crayons quilted:
Orange
Purple
Black
Red
Blue
Brown
Green
Table Runners for Quilt show
Pam
Other
St. Pat’s
January Table Runner
Carolina Crossroads
Chiclets
100th day of school quilt
What I got done:
I passed my test! Since I passed, I took Friday off, so my quilty weekend started Thursday night.
Stashbusting efforts:
No buying and no sewing, so net effect of a big fat zero.
Wednesday, January 23, 2008
Almost...
The test is tomorrow, so all I'm doing is going nuts trying to study. So no sewing but no stash acquisition either!
Friday, January 18, 2008
Week 3
Goals for Week 3:
Pictures into guild for show
Crayons quilted:
Orange
Purple
Black
Red
Blue
Table Runners for Quilt show
January Table Runner
Carolina Crossroads
Chiclets
100th day of school quilt
What I got done:
Friday – 9 chiclets blocks. Goal is 6 per month to finish and this gets me all of January and half of February.
Saturday – too busy to sew.
Sunday – too busy and too tired to sew.
Monday – did nothing – church meeting.
Tuesday – did nothing.
Wednesday – nothing due to class.
Thursday – nothing due to class
Stashbusting efforts:
Well, I didn’t add to the stash, which is always a good sign! LOL. I did work on a really annoying UFO, so that is like double points in my book. My stress level over this insurance exam is off the roof and I will be much better next Thursday afternoon when it’s over. I did indeed take next Friday off as a reward to myself. Sometimes you just need to do it.
It was just as well I did not start the table runner projects for the quilt show, as the other person making identical items had some design issues. Now that we have it all hammered out, I should be good to go.
Pictures into guild for show
Crayons quilted:
Orange
Purple
Black
Red
Blue
Table Runners for Quilt show
January Table Runner
Carolina Crossroads
Chiclets
100th day of school quilt
What I got done:
Friday – 9 chiclets blocks. Goal is 6 per month to finish and this gets me all of January and half of February.
Saturday – too busy to sew.
Sunday – too busy and too tired to sew.
Monday – did nothing – church meeting.
Tuesday – did nothing.
Wednesday – nothing due to class.
Thursday – nothing due to class
Stashbusting efforts:
Well, I didn’t add to the stash, which is always a good sign! LOL. I did work on a really annoying UFO, so that is like double points in my book. My stress level over this insurance exam is off the roof and I will be much better next Thursday afternoon when it’s over. I did indeed take next Friday off as a reward to myself. Sometimes you just need to do it.
It was just as well I did not start the table runner projects for the quilt show, as the other person making identical items had some design issues. Now that we have it all hammered out, I should be good to go.
Thursday, January 17, 2008
CC Revealed!!!!
Well, I got Bonnie’s all important special notice last night and WOW is all I can say! What else can you say??!? Thank you, Bonnie comes to mind.
It is a fantastic quilt. It is also predominately a blue quilt. So I’m glad to see how it turned out so I can work on my color placement. The only other thing I plan on doing is adding another row to the bottom so it’s a tad larger (and busts more stash).
Now that class has started, now I can start on this quilt. Next weekend during the Stashbusters retreat weekend, I plan on getting going. We shall see. This weekend is already tied up with a little kid sleepover for 2 nights, studying for class and studying most importantly for my insurance exam.
It is a fantastic quilt. It is also predominately a blue quilt. So I’m glad to see how it turned out so I can work on my color placement. The only other thing I plan on doing is adding another row to the bottom so it’s a tad larger (and busts more stash).
Now that class has started, now I can start on this quilt. Next weekend during the Stashbusters retreat weekend, I plan on getting going. We shall see. This weekend is already tied up with a little kid sleepover for 2 nights, studying for class and studying most importantly for my insurance exam.
Wednesday, January 16, 2008
Noodle!
Oh. Dear. God.
No quilting last night on my last night of freedom for the next 6 years of my life (I start grad school tonight).
And no studying for the exam today. Eek.
But I did get assigned to a very cool project today and it is the BOMB. I am very excited.
No quilting last night on my last night of freedom for the next 6 years of my life (I start grad school tonight).
And no studying for the exam today. Eek.
But I did get assigned to a very cool project today and it is the BOMB. I am very excited.
Tuesday, January 15, 2008
The Waffler
Now I’m rethinking my colors for the CC. Should I do all scrappy for blue, whatever neutral lights I have for the cream and pink for the red? Hmm…
The pros are that I would be able to go through my Ziploc bags of scraps (sorted by color) and get rid of a lot of stuff and process whatever else is in there and really get a handle on the little stuff. Another pro is although I want to try a pink and brown quilt, I’m not sure I want one that’s 80 x 80. A third benefit (although implied) is that the entire thing could most definitely come from stash.
The cons are that I am waffling and I don’t get a pink and brown quilt right now.
I so cannot wait for this insurance exam to be over. It’s next Thursday the 24th and I am taking the 25th as a mental health day. I plan to quilt all weekend long. DH is in total support of this. I think the only getting out we may do is to quilt shops to drop off fliers for the quilt show, so everything will be quilting related. I so need this weekend.
So back to CC. If you’re reading this, let me know your thoughts.
The pros are that I would be able to go through my Ziploc bags of scraps (sorted by color) and get rid of a lot of stuff and process whatever else is in there and really get a handle on the little stuff. Another pro is although I want to try a pink and brown quilt, I’m not sure I want one that’s 80 x 80. A third benefit (although implied) is that the entire thing could most definitely come from stash.
The cons are that I am waffling and I don’t get a pink and brown quilt right now.
I so cannot wait for this insurance exam to be over. It’s next Thursday the 24th and I am taking the 25th as a mental health day. I plan to quilt all weekend long. DH is in total support of this. I think the only getting out we may do is to quilt shops to drop off fliers for the quilt show, so everything will be quilting related. I so need this weekend.
So back to CC. If you’re reading this, let me know your thoughts.
Monday, January 14, 2008
Weekend Update
Overall, it was not a hugely productive sewing weekend, but since I am less than 2 weeks away from an insurance exam, this is not surprising.
Friday night required some quilting. DD had been sick all day and frankly she was nothing more than a huge pain in the butt. So after a fun adventure at ISU trying to get an ID, I got home and she was asleep taking a nap. So Ted and watched some tivo (Numbers) and after she woke up, I started to sew.
Now I have to make an appreciation table runner for the quilt show co-chair and then I have decided to make 2 more table runners as well for the quilt show silent auction. I figured I wasn’t in the right frame of mind to PP the appreciation table runner (God, how I hate paper piecing!), so I figured I would start my homework on the chiclets.
Somehow, some way before we moved, I made something like 50+ 16-patches for a series of chiclets quilts. Well, the pattern then requires the 16-patches to be framed with a background fabric and some HSTs. Well, making over 400 scrappy HSTs can get a bit tedious! So the project got stuffed into some Ziplocs and shoved in a box and moved.
Fast forward to the move. I took a look at this and decided I had invested too much and that the process was tedious but not hateful and technically the blocks looked good, so I should continue. I decided that I would complete 6 blocks a month until they were all done. So each time I did 6 blocks, I would take a fat eighth and some WOW and make some HSTs using the grid method. Then I would pull out of the existing HST bag and pull enough for 24 HSTs, press, square and sew.
I did indeed do 6 in October and 12 in November during my retreat. I completed 9 on Friday night while watching Gladiator on TNT. It’s not exactly a movie where you need to hear every word and stay riveted to the screen, so it made for good mindless sewing. I got the 9 done and called it an evening. I hope to do the other 9 this coming weekend and then I am done with chiclets for the first quarter of this year.
I have decided that the chiclets will become the TV room/Family room quilt for the couch. So the blocks now have a home, which is good. This will be completely from stash, which is also good. I’m a fan of free quilts.
Saturday involved the MBA orientation, studying a lot and managing DH and DD after they returned from an adventurous trip to Bensenville for a funeral. Let’s just say syrup ended up all over the minivan.
Sunday involved a prolonged morning at church, some football and some studying. No quilting.
It turned out that I couldn’t start on my appreciation table runner at all anyway because the person making the other one wanted to mail me another block and her PP template so that we would be consistent. So it worked out just as well. I want to make the other 2 runners from the scraps of the first, so I just have to wait it out.
Friday night required some quilting. DD had been sick all day and frankly she was nothing more than a huge pain in the butt. So after a fun adventure at ISU trying to get an ID, I got home and she was asleep taking a nap. So Ted and watched some tivo (Numbers) and after she woke up, I started to sew.
Now I have to make an appreciation table runner for the quilt show co-chair and then I have decided to make 2 more table runners as well for the quilt show silent auction. I figured I wasn’t in the right frame of mind to PP the appreciation table runner (God, how I hate paper piecing!), so I figured I would start my homework on the chiclets.
Somehow, some way before we moved, I made something like 50+ 16-patches for a series of chiclets quilts. Well, the pattern then requires the 16-patches to be framed with a background fabric and some HSTs. Well, making over 400 scrappy HSTs can get a bit tedious! So the project got stuffed into some Ziplocs and shoved in a box and moved.
Fast forward to the move. I took a look at this and decided I had invested too much and that the process was tedious but not hateful and technically the blocks looked good, so I should continue. I decided that I would complete 6 blocks a month until they were all done. So each time I did 6 blocks, I would take a fat eighth and some WOW and make some HSTs using the grid method. Then I would pull out of the existing HST bag and pull enough for 24 HSTs, press, square and sew.
I did indeed do 6 in October and 12 in November during my retreat. I completed 9 on Friday night while watching Gladiator on TNT. It’s not exactly a movie where you need to hear every word and stay riveted to the screen, so it made for good mindless sewing. I got the 9 done and called it an evening. I hope to do the other 9 this coming weekend and then I am done with chiclets for the first quarter of this year.
I have decided that the chiclets will become the TV room/Family room quilt for the couch. So the blocks now have a home, which is good. This will be completely from stash, which is also good. I’m a fan of free quilts.
Saturday involved the MBA orientation, studying a lot and managing DH and DD after they returned from an adventurous trip to Bensenville for a funeral. Let’s just say syrup ended up all over the minivan.
Sunday involved a prolonged morning at church, some football and some studying. No quilting.
It turned out that I couldn’t start on my appreciation table runner at all anyway because the person making the other one wanted to mail me another block and her PP template so that we would be consistent. So it worked out just as well. I want to make the other 2 runners from the scraps of the first, so I just have to wait it out.
Friday, January 11, 2008
Week 3 Goals
Goals for Week 3:
Pictures into guild for show
Crayons quilted:
Orange
Purple
Black
Red
Blue
Table Runners for Quilt show
January Table Runner
Carolina Crossroads
Chiclets
100th day of school quilt
Pictures into guild for show
Crayons quilted:
Orange
Purple
Black
Red
Blue
Table Runners for Quilt show
January Table Runner
Carolina Crossroads
Chiclets
100th day of school quilt
Week 2
Goals for Week 2:
Pictures into guild for show
Crayons quilted:
Yellow
Orange
Purple
Black
What I got done:
Friday - I do not even remember. I did go to the doctor and get some antibiotics, so I bet I slept the rest of the day.
Saturday – Went up to Crest Hill and met up with my bee and did some quilt show stuff. DD sewed 2 rows of her 100th Day of School quilt.
Sunday – Worked on the black crayon. Sandwiched the orange crayon. Finished the last 4 broken dishes blocks made from waste triangles from my snowman/snowball quilt. I plan to use these blocks for the January table runner.
Monday – Finished yellow crayon. Started orange crayon.
Tuesday – No sewing, but I did make some headway in my very cluttered house, so that helped out from a mental health point of view.
Wednesday – all of the orange crayon until I ran out of thread. Boo.
Thursday – I fell asleep over my insurance books.
Pictures into guild for show
Crayons quilted:
Yellow
Orange
Purple
Black
What I got done:
Friday - I do not even remember. I did go to the doctor and get some antibiotics, so I bet I slept the rest of the day.
Saturday – Went up to Crest Hill and met up with my bee and did some quilt show stuff. DD sewed 2 rows of her 100th Day of School quilt.
Sunday – Worked on the black crayon. Sandwiched the orange crayon. Finished the last 4 broken dishes blocks made from waste triangles from my snowman/snowball quilt. I plan to use these blocks for the January table runner.
Monday – Finished yellow crayon. Started orange crayon.
Tuesday – No sewing, but I did make some headway in my very cluttered house, so that helped out from a mental health point of view.
Wednesday – all of the orange crayon until I ran out of thread. Boo.
Thursday – I fell asleep over my insurance books.
Thursday, January 10, 2008
CC - Step 6 revealed
Let's just say, based on Step 6 being revealed, that I think I want to swap where the pink and brown will be in my blocks and where the purple and green will be in Kim's blocks. I want a predominately pink and cream quilt and I want Kim to have a predominately purple and cream quilt, so we shall see what else happens with this quilt.
No, I haven't started cutting. Life got way to crazy over New Year's and being sick did not help. Add to that the fact that the quilt show is in 2 months and my 2 quilts aren't ready and you can see what's going on in my life. But I am SO itching to start this quilt!
Maybe this weekend. It will be my Spring 08 quilt. I start grad school next week, so if I can do one full projects plus UFOs each term, I will be pleased as punch. I study a lot and sew a lot. I was already doing my MBA when we moved, (so I have to start over) so I have practice on how to balance school, work and quilting.
No, I haven't started cutting. Life got way to crazy over New Year's and being sick did not help. Add to that the fact that the quilt show is in 2 months and my 2 quilts aren't ready and you can see what's going on in my life. But I am SO itching to start this quilt!
Maybe this weekend. It will be my Spring 08 quilt. I start grad school next week, so if I can do one full projects plus UFOs each term, I will be pleased as punch. I study a lot and sew a lot. I was already doing my MBA when we moved, (so I have to start over) so I have practice on how to balance school, work and quilting.
Tuesday, January 08, 2008
Sidewinder Review
Here’s my review on the SideWinder, the latest hot gadget in quilting.
First a bit of background. I have an older Kenmore that I used as my DSM for a long time, only recently replacing it with the Janome Gem last spring. The Kenmore had only 3 issues with it. It’s heavy, I can’t free motion on it (no doubt operator error, but whatever) and the bobbin winder is broken. Now I really don’t feel like spending a ton of money to repair this feature.
Fast forward to Thanksgiving time, when I brought my Janome in for service. I then was sewing on the Kenmore (named Ed, as I really did get it from a gay guy named Ed), and I had no way to wind bobbins (I was using the Janome, you see…). So I had to get a Side Winder.
The pros: It winds bobbins and you don’t have to unthread your machine. It threads them for more than one bobbin type. It is plug in and battery operated. It is small. And it’s way cheaper than fixing Ed.
The cons: It doesn’t have a stop button. Why do you need one? Well, if your spool runs out, the bobbin keeps going, though nothing is happening. It only stops if the bobbin is full. So in order to stop it, I have to pull the plug (from the unit to the power cord – not out of the wall). What do you do if you’re on battery? It only winds the bobbins about 2/3 full.
So how do I feel about owning it? Good, for Ed the Kenmore. But don’t be fooled by illusions of grandeur.
First a bit of background. I have an older Kenmore that I used as my DSM for a long time, only recently replacing it with the Janome Gem last spring. The Kenmore had only 3 issues with it. It’s heavy, I can’t free motion on it (no doubt operator error, but whatever) and the bobbin winder is broken. Now I really don’t feel like spending a ton of money to repair this feature.
Fast forward to Thanksgiving time, when I brought my Janome in for service. I then was sewing on the Kenmore (named Ed, as I really did get it from a gay guy named Ed), and I had no way to wind bobbins (I was using the Janome, you see…). So I had to get a Side Winder.
The pros: It winds bobbins and you don’t have to unthread your machine. It threads them for more than one bobbin type. It is plug in and battery operated. It is small. And it’s way cheaper than fixing Ed.
The cons: It doesn’t have a stop button. Why do you need one? Well, if your spool runs out, the bobbin keeps going, though nothing is happening. It only stops if the bobbin is full. So in order to stop it, I have to pull the plug (from the unit to the power cord – not out of the wall). What do you do if you’re on battery? It only winds the bobbins about 2/3 full.
So how do I feel about owning it? Good, for Ed the Kenmore. But don’t be fooled by illusions of grandeur.
Week 2
Goals for Week 2:
Pictures into guild for show
Crayons quilted:
Yellow
Orange
Purple
Black
I'm now at the point where I need to focus on Quilt Show duties first and foremost. Right now, I want to get 2 crayons a week quilted so that the whole quilt can be done by the end of January. The other things are 2 table runners for the silent auction and a table runner for one of the 2 that chaired the show.
I am still working on some other things as rewards for completing the "have-to's."
Then there are some admin duties I need to focus on. Oy!
Pictures into guild for show
Crayons quilted:
Yellow
Orange
Purple
Black
I'm now at the point where I need to focus on Quilt Show duties first and foremost. Right now, I want to get 2 crayons a week quilted so that the whole quilt can be done by the end of January. The other things are 2 table runners for the silent auction and a table runner for one of the 2 that chaired the show.
I am still working on some other things as rewards for completing the "have-to's."
Then there are some admin duties I need to focus on. Oy!
Week 1
Goals for Week 1:
Pictures into guild for show
CC – Kim – clue 1
CC – Me – clue 1
Anything else I want!!!
What I got done:
Friday – Christmas party with my bee. Very fun!!!
Saturday – After getting home in the afternoon and taking a nap, I got the purple crayon fixed and sandwiched for quilting. I also sewed 50 pieces on the black crayon.
Sunday – Despite feeling all congested, I did get the yellow crayon fixed and sandwiched for quilting. I also got the upstairs quilting station set up.
Monday – Up in Chicago with sick MIL – don’t ask.
Tuesday – After all the craziness, I did manage to quilt half of the yellow crayon. It went far faster than I expected, so it should be a far more manageable project to complete than what I thought.
I did not get to go to the Treadle to get browns for my CC, nor could I cut Kim’s CC. Such is life. We’ll get there.
Wednesday – Despite being exhausted (I think the kids gave me something), I did sit for 10 minutes and quilted a fourth of the other side of the yellow crayon. Not much, but if that what it takes….I’m taking it.
Thursday – nothing.
Pictures into guild for show
CC – Kim – clue 1
CC – Me – clue 1
Anything else I want!!!
What I got done:
Friday – Christmas party with my bee. Very fun!!!
Saturday – After getting home in the afternoon and taking a nap, I got the purple crayon fixed and sandwiched for quilting. I also sewed 50 pieces on the black crayon.
Sunday – Despite feeling all congested, I did get the yellow crayon fixed and sandwiched for quilting. I also got the upstairs quilting station set up.
Monday – Up in Chicago with sick MIL – don’t ask.
Tuesday – After all the craziness, I did manage to quilt half of the yellow crayon. It went far faster than I expected, so it should be a far more manageable project to complete than what I thought.
I did not get to go to the Treadle to get browns for my CC, nor could I cut Kim’s CC. Such is life. We’ll get there.
Wednesday – Despite being exhausted (I think the kids gave me something), I did sit for 10 minutes and quilted a fourth of the other side of the yellow crayon. Not much, but if that what it takes….I’m taking it.
Thursday – nothing.
Thursday, January 03, 2008
If that what it takes....
I only got in 10 minutes yesterday, so I did a fourth of the other side of the yellow crayon. Right now, if that is all that can be done, I will take it.
DH is still up with his mom. DD and I are holding down the fort, in this zero degree nonsense. I like cold and I live in Illinois, but even I will admit this is cold. However, I am still not wearing a winter coat. That would be admitting defeat!
DH is still up with his mom. DD and I are holding down the fort, in this zero degree nonsense. I like cold and I live in Illinois, but even I will admit this is cold. However, I am still not wearing a winter coat. That would be admitting defeat!
Wednesday, January 02, 2008
Several Days of Catch-Up
Friday – Christmas party with my bee. Very fun!!!
Saturday – After getting home in the afternoon and taking a nap, I got the purple crayon fixed and sandwiched for quilting. I also sewed 50 pieces on the black crayon.
Sunday – Despite feeling all congested, I did get the yellow crayon fixed and sandwiched for quilting. I also got the upstairs quilting station set up.
Monday – Up in Chicago with sick MIL – don’t ask.
Tuesday – After all the craziness, I did manage to quilt half of the yellow crayon. It went far faster than I expected, so it should be a far more manageable project to complete than what I thought.
I did not get to go to the Treadle to get browns for my CC, nor could I cut Kim’s CC. Such is life. We’ll get there.
Saturday – After getting home in the afternoon and taking a nap, I got the purple crayon fixed and sandwiched for quilting. I also sewed 50 pieces on the black crayon.
Sunday – Despite feeling all congested, I did get the yellow crayon fixed and sandwiched for quilting. I also got the upstairs quilting station set up.
Monday – Up in Chicago with sick MIL – don’t ask.
Tuesday – After all the craziness, I did manage to quilt half of the yellow crayon. It went far faster than I expected, so it should be a far more manageable project to complete than what I thought.
I did not get to go to the Treadle to get browns for my CC, nor could I cut Kim’s CC. Such is life. We’ll get there.
Friday, December 28, 2007
week 1 goals
Goals for Week 1:
Pictures into guild for show
Carolina Crossroads - Kim cut - clue 1
Carolina Crossroads - mine cut - clue 1
Anything else I want!!!
I've decided to continue my whatever-I-want phase through the next week. Since I figured out the crayon quilt, watch that be the big thing I haul ass on all week! I'm just excited to have it figured out in my mind's eye.
Pictures into guild for show
Carolina Crossroads - Kim cut - clue 1
Carolina Crossroads - mine cut - clue 1
Anything else I want!!!
I've decided to continue my whatever-I-want phase through the next week. Since I figured out the crayon quilt, watch that be the big thing I haul ass on all week! I'm just excited to have it figured out in my mind's eye.
week 52
Well nothing really happened here in week 52, except that I did get my Dad's quilt done.
I did also finish the top on the Peter/Hunter/generic boy quilt.
And then I promptly have done nothing.
Although I did take out the completed crayons for the crayon quilt and laid them out. I was able to see that the flaw that I thought was there in every crayon indeed is there in every crayon. I have made a design change, which requires doing some ripping, snorting and repiecing with Y seams on each crayon. On a few crayons, they will need more strips, as somehow they are not long enough. I also determined that the quilt will have to hang upside down in the show (the crayon points hanging down), as I have no idea how else to get a sleeve on the thing!
So not a lot of quilting after the holiday, but a real revelation in what to do with this quilt. So now it's just a matter of getting to it.
I did also finish the top on the Peter/Hunter/generic boy quilt.
And then I promptly have done nothing.
Although I did take out the completed crayons for the crayon quilt and laid them out. I was able to see that the flaw that I thought was there in every crayon indeed is there in every crayon. I have made a design change, which requires doing some ripping, snorting and repiecing with Y seams on each crayon. On a few crayons, they will need more strips, as somehow they are not long enough. I also determined that the quilt will have to hang upside down in the show (the crayon points hanging down), as I have no idea how else to get a sleeve on the thing!
So not a lot of quilting after the holiday, but a real revelation in what to do with this quilt. So now it's just a matter of getting to it.
Thursday, December 27, 2007
nothing new
Nothing much. Last night DH and I watched a lot of Babylon 5 and tonight we plan more of the same. Sewing may just be on holiday right now.
Actually, I did clear off the extra table in our room so that I can put my old Kenmore on it. I want to quil the crayon quilt using that machine, so I have to set it up somewhere.
Actually, I did clear off the extra table in our room so that I can put my old Kenmore on it. I want to quil the crayon quilt using that machine, so I have to set it up somewhere.
Wednesday, December 26, 2007
Carolina Crossroads Update
OK, OK, I missed Sunday to update. Sorry. Shoot me – I was a quilter on a mission to finish a gift. Gift accomplished and given. Dad loves it and is amazed that BOTH of his daughters made it.
I did ask my sister what other colors besides purple that she would want. She started with teal and then I explained I had no teal in my stash and she had to work within what I have. I suggested green, and even after explaining that not every green may go with every purple, she was game. So the conversion chart is:
Bonnie’s red = Kim’s purple = my pink
Bonnie’s blue = Kim’s green = my brown
Bonnie’s tan = Kim’s cream = my cream
I may need to buy a bit of fabric here and there to round out both the cream selection and the brown selection, but we shall see.
My sister does not handle angles well, so clue 4 is going to require some serious coaching on my part. Thank God she’s not doing the cutting. That would escape her altogether.
The goal is to cut on New Year’s Day during the various aspects of the Rose Bowl.
I did ask my sister what other colors besides purple that she would want. She started with teal and then I explained I had no teal in my stash and she had to work within what I have. I suggested green, and even after explaining that not every green may go with every purple, she was game. So the conversion chart is:
Bonnie’s red = Kim’s purple = my pink
Bonnie’s blue = Kim’s green = my brown
Bonnie’s tan = Kim’s cream = my cream
I may need to buy a bit of fabric here and there to round out both the cream selection and the brown selection, but we shall see.
My sister does not handle angles well, so clue 4 is going to require some serious coaching on my part. Thank God she’s not doing the cutting. That would escape her altogether.
The goal is to cut on New Year’s Day during the various aspects of the Rose Bowl.
quickly checking in
Friday, Saturday and Sunday – I did get the Dad quilt 100% done (and the first 3 movies of Star Wars watched). I also got the borders on the Peter/Hunter/generic boy quilt on and started the process to piece the back for it.
Monday and Tuesday brought no quilting due to the holiday. I did do some gaming with my DH, which made his day.
Monday and Tuesday brought no quilting due to the holiday. I did do some gaming with my DH, which made his day.
Saturday, December 22, 2007
Dad quilt - quilting update
20% quilted. And that took an hour. WE should make it without issues.
I hate borders and sandwiching. My sister even asked me if I was OK with doing this, as I didn't sound very happy. I told her I'm equal opportunity hate with part of the process.
I hate borders and sandwiching. My sister even asked me if I was OK with doing this, as I didn't sound very happy. I told her I'm equal opportunity hate with part of the process.
Friday, December 21, 2007
Week 52 goals
Goals for Week 52:
Dad quilt done
Pictures into guild for show - meeting with them on the 28th anyway
Anything else I want!!!
I decided earlier in the week when I was taking a long look at what I need to finish by the guild show in March and what I want to finish by that point that between now and the new year, I get to sew on whatever I want. There are only 3 rules:
1. Dad quilt must be done
2. Don't start anything new until New Year's Day (come on Carolina Crossroads!!!)
3. The Dorothy Young Christmas mystery is 'legal'
At some point, I just need to move where the mojo takes me. This will all be in the land of UFO's. I may make some doll clothes for the new American Girl doll making her way to our house this Christmastime.
What I hope for is that a lot of quilts that have blocks done will make it into tops and get all the way through the process except for hand stitiching down the binding. Then having a ton of hand work next to every TV is a good thing and a great way to bust a lot of tivo.
Dad quilt done
Pictures into guild for show - meeting with them on the 28th anyway
Anything else I want!!!
I decided earlier in the week when I was taking a long look at what I need to finish by the guild show in March and what I want to finish by that point that between now and the new year, I get to sew on whatever I want. There are only 3 rules:
1. Dad quilt must be done
2. Don't start anything new until New Year's Day (come on Carolina Crossroads!!!)
3. The Dorothy Young Christmas mystery is 'legal'
At some point, I just need to move where the mojo takes me. This will all be in the land of UFO's. I may make some doll clothes for the new American Girl doll making her way to our house this Christmastime.
What I hope for is that a lot of quilts that have blocks done will make it into tops and get all the way through the process except for hand stitiching down the binding. Then having a ton of hand work next to every TV is a good thing and a great way to bust a lot of tivo.
Week 51
Goals for Week 51:
Peter/Hunter quilt – progress of some sort
Trifecta – quilted (or at least started…)
Crayon – red crayon done
Giftie – progress
Coasters giftie – done
Dad – progress
Tumbleweeds – find!!!
Pictures into guild for show
(Please note that this is nearly the same dang list!!!)
What I got done:
Friday – All Dad b locks done, giftie for SS all assembled. Giftie coaster also done.
Saturday – Completed hand sewing down the binding on the giftie.
Sunday – none – Schwitzner Sibling Christmas.
Monday – nothing.
Tuesday – nothing.
Wednesday – nothing.
Thursday – I got the Dad quilt going! Blocks are all set and the side borders are on. I will make it!!!
Peter/Hunter quilt – progress of some sort
Trifecta – quilted (or at least started…)
Crayon – red crayon done
Giftie – progress
Coasters giftie – done
Dad – progress
Tumbleweeds – find!!!
Pictures into guild for show
(Please note that this is nearly the same dang list!!!)
What I got done:
Friday – All Dad b locks done, giftie for SS all assembled. Giftie coaster also done.
Saturday – Completed hand sewing down the binding on the giftie.
Sunday – none – Schwitzner Sibling Christmas.
Monday – nothing.
Tuesday – nothing.
Wednesday – nothing.
Thursday – I got the Dad quilt going! Blocks are all set and the side borders are on. I will make it!!!
Thursday, December 20, 2007
well, at least the cards are done....
Nothing happened on the sewing front, but the Christmas cards (all 107 of them!) are done. So I consider that a victory.
Wednesday, December 19, 2007
gift completed
Again, no progress. But there was sorta progress, really.
I did finish my organizer roll up thingy and filled it will all good quilty things and have it all ready to go to KS. And promptly left it at home this morning. So I will take it to mail this evening. the cover of the organizer is 3 stars made with Judy's tri-recs lessons. The inside has 5 zippered pouches and I will never sew with vinyl again after this disaster.
The pouches contained quilty goodness. 6 FQs - 3 pink, 3 brown (her colors), a box of flower head pins, a folding seam ripper, an add-a-quarter, a lint brush for the machine, a 1 x 6 mini omnigrid ruler and one of those little cut on one side, press on the other side thingys (I bought one for me too!). So that's a lot of quilty goodness. Plus the sewing Hallmark ornament for this year. I hope she likes her gift.
And that was the extent of the sewing yesterday. My next really big deadline is the Christmas itself. I need to finish the Dad quilt, which is at the completed blocks stage. Time to power-sew.
I did finish my organizer roll up thingy and filled it will all good quilty things and have it all ready to go to KS. And promptly left it at home this morning. So I will take it to mail this evening. the cover of the organizer is 3 stars made with Judy's tri-recs lessons. The inside has 5 zippered pouches and I will never sew with vinyl again after this disaster.
The pouches contained quilty goodness. 6 FQs - 3 pink, 3 brown (her colors), a box of flower head pins, a folding seam ripper, an add-a-quarter, a lint brush for the machine, a 1 x 6 mini omnigrid ruler and one of those little cut on one side, press on the other side thingys (I bought one for me too!). So that's a lot of quilty goodness. Plus the sewing Hallmark ornament for this year. I hope she likes her gift.
And that was the extent of the sewing yesterday. My next really big deadline is the Christmas itself. I need to finish the Dad quilt, which is at the completed blocks stage. Time to power-sew.
Tuesday, December 18, 2007
No progress, but no backsliding either
Monday was the lost day. I didn’t get any sewing done, and I attempted to make fudge. Now, I really can make fudge, but this is a new range, so there are always adjustments to be made. This batch ended up too thin and it spilled on my hand as I was trying to pour it. OW OW OW!!!
Plus DD and I ate all the other fudge in the house that I made over the weekend. So at some point, I was a lump, trying to fight off the sugar crash. That I finished that one batch of fudge and made sense of the addresses for the Christmas cards is a minor miracle.
So no steps forward, sewing-wise, but none back either.
Plus DD and I ate all the other fudge in the house that I made over the weekend. So at some point, I was a lump, trying to fight off the sugar crash. That I finished that one batch of fudge and made sense of the addresses for the Christmas cards is a minor miracle.
So no steps forward, sewing-wise, but none back either.
Monday, December 17, 2007
Snowy Update
Just a quick update.
We got a fair amount of snow and it blew and drifted everywhere, so it’s hard to measure exactly how much. I vote for 3 to 4 inches. DD was in her glory. Ted was exhausted from shoveling.
Friday saw the most sewing of the weekend. After I got DD through her second flu shot (evidently when you’re a kid and it’s your first flu shot ever, you need a booster) with a Happy Meal from the Golden Arches, we came home and I finished all the Dad blocks. I am now the proud owner of 72 Backroads to OK blocks. And with a week to spare!!!! I also worked on my Secret Santa gift, which is an organizer roll up thing. Man, I hate sewing vinyl. Grrrr. I got that all the way done except for handstitching the binding.
Based on our familial schedule for the weekend, I did not hold out illusions of grandeur about sewing lots. I did make 3 batches of fudge, 1 batch (2 loaves) of pumpkin bread and a batch of oatmeal cinnamon chip cookies. I also tidying the kitchen as I went and also went through some paperwork. I did squeeze in a 2 hour nap and I did finish the hand sewing on the coaster and the organizer thingy. I got done nearly everything I wanted to and at a reasonable pace. And DD made it through the eye doctor.
Sunday was the Schwitzner Sibling Christmas. My FIL has children from 2 different wives, so his children get together to celebrate. My FIL called in from FL to chat with them all. My SIL had the event, as she has the biggest home. She really wanted me to do it, because I had moved and it would be a great reason to visit, but we all got somewhere between 3 and 6 inches of snow. So it was better for only our family to be on the road than their 2 families. We brought all the desserts, which explains my baking.
So now all of my Christmas shopping is done. DH needs a Secret Santa gift for work in the $10 range. I need some wrapping paper and I need to do 2 more rounds of baking, but the only things left are to pack my SS box and mail it and to finish the Dad quilt. YIPPEE!!!
We got a fair amount of snow and it blew and drifted everywhere, so it’s hard to measure exactly how much. I vote for 3 to 4 inches. DD was in her glory. Ted was exhausted from shoveling.
Friday saw the most sewing of the weekend. After I got DD through her second flu shot (evidently when you’re a kid and it’s your first flu shot ever, you need a booster) with a Happy Meal from the Golden Arches, we came home and I finished all the Dad blocks. I am now the proud owner of 72 Backroads to OK blocks. And with a week to spare!!!! I also worked on my Secret Santa gift, which is an organizer roll up thing. Man, I hate sewing vinyl. Grrrr. I got that all the way done except for handstitching the binding.
Based on our familial schedule for the weekend, I did not hold out illusions of grandeur about sewing lots. I did make 3 batches of fudge, 1 batch (2 loaves) of pumpkin bread and a batch of oatmeal cinnamon chip cookies. I also tidying the kitchen as I went and also went through some paperwork. I did squeeze in a 2 hour nap and I did finish the hand sewing on the coaster and the organizer thingy. I got done nearly everything I wanted to and at a reasonable pace. And DD made it through the eye doctor.
Sunday was the Schwitzner Sibling Christmas. My FIL has children from 2 different wives, so his children get together to celebrate. My FIL called in from FL to chat with them all. My SIL had the event, as she has the biggest home. She really wanted me to do it, because I had moved and it would be a great reason to visit, but we all got somewhere between 3 and 6 inches of snow. So it was better for only our family to be on the road than their 2 families. We brought all the desserts, which explains my baking.
So now all of my Christmas shopping is done. DH needs a Secret Santa gift for work in the $10 range. I need some wrapping paper and I need to do 2 more rounds of baking, but the only things left are to pack my SS box and mail it and to finish the Dad quilt. YIPPEE!!!
Sunday, December 16, 2007
CC update
As requested, this is my Carolina Crossroads weekly check in. I am still trying to figure out my 3 colors for my sister and then I decided (oh, hell's bells) that I'd do one too.
My goal is to send my sister each clue all prepared and cut and all she has to do is sew it. She has no stash and I have way too much. She is game. All I know for sure is that her accent color (Bonnie's red) will be purple.
My quilt is another story. I want to do pinks, browns and creams. But I do not know if I have enough of all 3 of those colors.
Stay tuned.
My goal is to send my sister each clue all prepared and cut and all she has to do is sew it. She has no stash and I have way too much. She is game. All I know for sure is that her accent color (Bonnie's red) will be purple.
My quilt is another story. I want to do pinks, browns and creams. But I do not know if I have enough of all 3 of those colors.
Stay tuned.
Friday, December 14, 2007
Week 51 goals
Goals for Week 51:
Peter/Hunter quilt – progress of some sort
Trifecta – quilted (or at least started…)
Crayon – red crayon done
Giftie – progress
Coasters giftie – done
Dad – progress
Tumbleweeds – find!!!
Pictures into guild for show
(Please note that this is nearly the same dang list!!!)
Peter/Hunter quilt – progress of some sort
Trifecta – quilted (or at least started…)
Crayon – red crayon done
Giftie – progress
Coasters giftie – done
Dad – progress
Tumbleweeds – find!!!
Pictures into guild for show
(Please note that this is nearly the same dang list!!!)
Week 50
Goals for Week 50:
Peter/Hunter quilt – progress of some sort
Trifecta – quilted (or at least started…)
Crayon – red crayon done
Giftie – progress
Coasters giftie – done
Dad – progress
Tumbleweeds – find!!!
Pictures into guild for show
LCRR – final strips for final block set
(Please note that this is the same dang list!!!)
Oh, and a gaudy sweatshirt for Chad at work. Oh boy!!!
What I got done:
Friday night – I started after the eye appointment debacle. I got started on the LCRR blocks and kept plugging away on the Dad quilt blocks. I also started 4 broken dishes blocks. What I did notice was that the safety on my rotary cutter kept giving out, thus making it unsafe to sew with. And so I had to run out on Saturday for a new one.
Saturday – What a day to sew! When we got home after the ice storm started, I was off to the sewing room. I was able to finish 4 more broken dishes blocks and 2 dozen of the Dad quilt blocks. Before we went out, I did finish the LCRR blocks. So once all of these things were done, I decided we needed a tree skirt. So I took out my blue and white snowflake fabric scrap stash and cut strips ranging from 1” to 3” (1/2” intervals) and did the stitch and flip method of QAYG. The skirt finished at 40” round. The new rotary cutter is fantastic!
Sunday – While watching 4 hours of Project Runway on the tivo, I got the entire tree skirt bound. It is beautiful and set up under our new 4 foot pre-lit tree. Of course, 5 hours later, I found my tub of Christmas fabrics intermixed with the Christmas décor boxes. While I didn’t sew any more on Sunday after 12 noon, I did indeed find the Xmas fabs and put them where they belonged, and went through and donated/threw out 2 footlockers and 1 more box full of fabrics. So while not a lot of sewing per se, I busted a ton of junk, which feels far better. Very little went down into the sewing room.
And the Chad sweatshirt is designed.
Monday – Let’s see. I sewed for a while on the Dad quilt, but didn’t get too far. I cleaned up some of the sewing space, which was required. I also started 2 more broken dishes blocks. I know I sewed for like 1.5 hours, but it doesn’t feel like I got a lot done. Hmmm…..
Tuesday – Got all 4 fussy cut items on the Chad sweatshirt and also sewed 20 more Dad blocks. The remaining 28 are at the point where construction will be easy.
Wednesday – Only fabric painting on the Chad sweatshirt.
Thursday – The Chad sweatshirt is done, bows and all.
Peter/Hunter quilt – progress of some sort
Trifecta – quilted (or at least started…)
Crayon – red crayon done
Giftie – progress
Coasters giftie – done
Dad – progress
Tumbleweeds – find!!!
Pictures into guild for show
LCRR – final strips for final block set
(Please note that this is the same dang list!!!)
Oh, and a gaudy sweatshirt for Chad at work. Oh boy!!!
What I got done:
Friday night – I started after the eye appointment debacle. I got started on the LCRR blocks and kept plugging away on the Dad quilt blocks. I also started 4 broken dishes blocks. What I did notice was that the safety on my rotary cutter kept giving out, thus making it unsafe to sew with. And so I had to run out on Saturday for a new one.
Saturday – What a day to sew! When we got home after the ice storm started, I was off to the sewing room. I was able to finish 4 more broken dishes blocks and 2 dozen of the Dad quilt blocks. Before we went out, I did finish the LCRR blocks. So once all of these things were done, I decided we needed a tree skirt. So I took out my blue and white snowflake fabric scrap stash and cut strips ranging from 1” to 3” (1/2” intervals) and did the stitch and flip method of QAYG. The skirt finished at 40” round. The new rotary cutter is fantastic!
Sunday – While watching 4 hours of Project Runway on the tivo, I got the entire tree skirt bound. It is beautiful and set up under our new 4 foot pre-lit tree. Of course, 5 hours later, I found my tub of Christmas fabrics intermixed with the Christmas décor boxes. While I didn’t sew any more on Sunday after 12 noon, I did indeed find the Xmas fabs and put them where they belonged, and went through and donated/threw out 2 footlockers and 1 more box full of fabrics. So while not a lot of sewing per se, I busted a ton of junk, which feels far better. Very little went down into the sewing room.
And the Chad sweatshirt is designed.
Monday – Let’s see. I sewed for a while on the Dad quilt, but didn’t get too far. I cleaned up some of the sewing space, which was required. I also started 2 more broken dishes blocks. I know I sewed for like 1.5 hours, but it doesn’t feel like I got a lot done. Hmmm…..
Tuesday – Got all 4 fussy cut items on the Chad sweatshirt and also sewed 20 more Dad blocks. The remaining 28 are at the point where construction will be easy.
Wednesday – Only fabric painting on the Chad sweatshirt.
Thursday – The Chad sweatshirt is done, bows and all.
Thursday, December 13, 2007
Painting a plenty...
Last night proved to be an opportune time to run to the paint your pottery place and get DD to make her present for her dad. I made a tray to hold my sewing things by my nightstand and also on retreat. We also had a nice dinner together and overall it was a good evening.
Sewing-wise, I did outline the big Christmas tree on the back of the Chad sweatshirt and then wrote “I (heart) Christmas” inside the tree. That was a request from the person who started this. After 2 hours of fine painting at the pottery place, my hands were steady enough to handle the writing.
Tonight I have to finish the Chad sweatshirt. And hopefully do some more sewing, but my house needs some attention, as does my errand list for Friday.
Sewing-wise, I did outline the big Christmas tree on the back of the Chad sweatshirt and then wrote “I (heart) Christmas” inside the tree. That was a request from the person who started this. After 2 hours of fine painting at the pottery place, my hands were steady enough to handle the writing.
Tonight I have to finish the Chad sweatshirt. And hopefully do some more sewing, but my house needs some attention, as does my errand list for Friday.
Wednesday, December 12, 2007
Brick Free!!!!
The Chad sweatshirt is turning out really cutesy, which is just sick and wrong and wonderful. It’s now making the rounds of the floor about this event. People are bringing in cameras.
I did get more done on the Dad blocks. All the uphill and downhill units are done; I’m brick free! So whatever I need to steal from the extra units stacks to finish this quilt, I will. It’s going to be about 3 dozen units of each type. That will still leave me like 150 units total for the King quilt, so hey, it’s still a good deal in my book.
I did also watch the 2 part episode of Grey’s Anatomy and the other one on the tivo was a rerun, so I busted 3 hours of tivo stash, which also a good thing.
Tonight I hope to handle some Xmas errands with DD for DH while he is working reference (it’s finals week – all hands on deck!), so the sewing portion will most likely just be the Chad sweatshirt and a coaster for DH’s secret santa at work.
I was going to run up to guild tomorrow night, but going 120 miles in this weather, abated as it is, still doesn’t strike me as fun. It has to be a really compelling reason to go, and the meeting is not compelling enough.
I did get more done on the Dad blocks. All the uphill and downhill units are done; I’m brick free! So whatever I need to steal from the extra units stacks to finish this quilt, I will. It’s going to be about 3 dozen units of each type. That will still leave me like 150 units total for the King quilt, so hey, it’s still a good deal in my book.
I did also watch the 2 part episode of Grey’s Anatomy and the other one on the tivo was a rerun, so I busted 3 hours of tivo stash, which also a good thing.
Tonight I hope to handle some Xmas errands with DD for DH while he is working reference (it’s finals week – all hands on deck!), so the sewing portion will most likely just be the Chad sweatshirt and a coaster for DH’s secret santa at work.
I was going to run up to guild tomorrow night, but going 120 miles in this weather, abated as it is, still doesn’t strike me as fun. It has to be a really compelling reason to go, and the meeting is not compelling enough.
Tuesday, December 11, 2007
Tuesday Musings (or is that Monday Musings?)
As I mentioned yesterday, I went through 2 footlockers and 2 bins/boxes of fabrics. It was FANTASTIC to get rid of so much stuff. I kept only quilty fabric (except from the from-Scotland Tartan plaid) and flung the rest. However, whatever I did keep and whatever I plan on donating made its way into the basement.
So now I am starting to dig out the sewing area once again. This seems to be a fortnightly event. However, this does mean that more things are being unearthed, more is being flung and I am able to assess the true size of my stash and my UFOs. Hopefully tonight I will be able to take one of the empty large banker’s boxes and go through the charity box and repack it neatly into the banker’s box. My guild does want me to cull out anything that they may enjoy. I really don’t think that there will be that much, but I will go through it and see.
I also need to do the Chad sweatshirt. I need to do one side tonight so the fabric paint can dry and then the other side tomorrow night. He will wear it on Friday, so I need to get it done. This will be a hoot.
I did make some progress on the Dad quilt, but I realized that I am nearly out of bricks. I decided to make half of the bricks uphill units and the other half downhill units (well, duh), but since each fabric usually had a pair of bricks, I put one brick in the Dad quilt pile and the other brick in the King scrappy quilt pile. So I have been double sewing, but I’m glad that I did. I will be able to just use some bricks from the King pile to finish off the Dad quilt. The amount of bricks that I have left to sew is small (maybe 36) and they will all be uphill units. And to top it off, I am double sewing each unit to get the bonus HSTs as well. So lots and lots of sewing to get these dang units!
Christmas is 2 weeks from today. I will make it with the Dad quilt, no problem. I have to finish 2 coasters, 1 roll up thing and 2 ornaments by Friday, plus the Chad sweatshirt by Friday. That is the more critical deadline at this point.
So now I am starting to dig out the sewing area once again. This seems to be a fortnightly event. However, this does mean that more things are being unearthed, more is being flung and I am able to assess the true size of my stash and my UFOs. Hopefully tonight I will be able to take one of the empty large banker’s boxes and go through the charity box and repack it neatly into the banker’s box. My guild does want me to cull out anything that they may enjoy. I really don’t think that there will be that much, but I will go through it and see.
I also need to do the Chad sweatshirt. I need to do one side tonight so the fabric paint can dry and then the other side tomorrow night. He will wear it on Friday, so I need to get it done. This will be a hoot.
I did make some progress on the Dad quilt, but I realized that I am nearly out of bricks. I decided to make half of the bricks uphill units and the other half downhill units (well, duh), but since each fabric usually had a pair of bricks, I put one brick in the Dad quilt pile and the other brick in the King scrappy quilt pile. So I have been double sewing, but I’m glad that I did. I will be able to just use some bricks from the King pile to finish off the Dad quilt. The amount of bricks that I have left to sew is small (maybe 36) and they will all be uphill units. And to top it off, I am double sewing each unit to get the bonus HSTs as well. So lots and lots of sewing to get these dang units!
Christmas is 2 weeks from today. I will make it with the Dad quilt, no problem. I have to finish 2 coasters, 1 roll up thing and 2 ornaments by Friday, plus the Chad sweatshirt by Friday. That is the more critical deadline at this point.
Monday, December 10, 2007
Weekend Update - I'm Chevy Chase...and you're not.
Friday night – I started after the eye appointment debacle. I got started on the LCRR blocks and kept plugging away on the Dad quilt blocks. I also started 4 broken dishes blocks. What I did notice was that the safety on my rotary cutter kept giving out, thus making it unsafe to sew with. And so I had to run out on Saturday for a new one.
Saturday – What a day to sew! When we got home after the ice storm started, I was off to the sewing room. I was able to finish 4 more broken dishes blocks and 2 dozen of the Dad quilt blocks. Before we went out, I did finish the LCRR blocks. So once all of these things were done, I decided we needed a tree skirt. So I took out my blue and white snowflake fabric scrap stash and cut strips ranging from 1” to 3” (1/2” intervals) and did the stitch and flip method of QAYG. The skirt finished at 40” round. The new rotary cutter is fantastic!
Sunday – While watching 4 hours of Project Runway on the tivo, I got the entire tree skirt bound. It is beautiful and set up under our new 4 foot pre-lit tree. Of course, 5 hours later, I found my tub of Christmas fabrics intermixed with the Christmas décor boxes. While I didn’t sew any more on Sunday after 12 noon, I did indeed find the Xmas fabs and put them where they belonged, and went through and donated/threw out 2 footlockers and 1 more box full of fabrics. So while not a lot of sewing per se, I busted a ton of junk, which feels far better. Very little went down into the sewing room.
And the Chad sweatshirt is designed.
Saturday – What a day to sew! When we got home after the ice storm started, I was off to the sewing room. I was able to finish 4 more broken dishes blocks and 2 dozen of the Dad quilt blocks. Before we went out, I did finish the LCRR blocks. So once all of these things were done, I decided we needed a tree skirt. So I took out my blue and white snowflake fabric scrap stash and cut strips ranging from 1” to 3” (1/2” intervals) and did the stitch and flip method of QAYG. The skirt finished at 40” round. The new rotary cutter is fantastic!
Sunday – While watching 4 hours of Project Runway on the tivo, I got the entire tree skirt bound. It is beautiful and set up under our new 4 foot pre-lit tree. Of course, 5 hours later, I found my tub of Christmas fabrics intermixed with the Christmas décor boxes. While I didn’t sew any more on Sunday after 12 noon, I did indeed find the Xmas fabs and put them where they belonged, and went through and donated/threw out 2 footlockers and 1 more box full of fabrics. So while not a lot of sewing per se, I busted a ton of junk, which feels far better. Very little went down into the sewing room.
And the Chad sweatshirt is designed.
Friday, December 07, 2007
Week 50 goals
Goals for Week 50:
Peter/Hunter quilt – progress of some sort
Trifecta – quilted (or at least started…)
Crayon – red crayon done
Giftie – progress
Coasters giftie – done
Dad – progress
Tumbleweeds – find!!!
Pictures into guild for show
LCRR – final strips for final block set
(Please note that this is the same dang list!!!)
Oh, and a gaudy sweatshirt for Chad at work. Oh boy!!!
Peter/Hunter quilt – progress of some sort
Trifecta – quilted (or at least started…)
Crayon – red crayon done
Giftie – progress
Coasters giftie – done
Dad – progress
Tumbleweeds – find!!!
Pictures into guild for show
LCRR – final strips for final block set
(Please note that this is the same dang list!!!)
Oh, and a gaudy sweatshirt for Chad at work. Oh boy!!!
Week 49
Goals for Week 49:
Peter/Hunter quilt – progress of some sort
Trifecta – quilted (or at least started…)
Crayon – red crayon done
Giftie – progress
Coasters giftie – done
Dad – progress
Tumbleweeds – find!!!
Pictures into guild for show
LCRR – final strips for final block set
What I got done:
Friday – 11/30/07 - I bought fabric for the last LCRR I ever plan on doing in my life and also thread to quilt the snow coasters and the Trifecta quilt. I also bought a SideWinder, which I didn’t think I needed and then my bobbin winder broke.
Saturday and Sunday – Kim and I really made some serious headway into the Dad quilt. She made the 72 center 4 patches and also started to attach white squares to downhill HST bricks. That was a huge help. I started making the uphill bricks and worked on the LCRR.
Monday – I crashed, man. Sleep. Zzzzzzzz…..
Tuesday – No quilting here because DD had her little winter program at school. It was so cute to see 200 kindergarteners and first graders singing their little hearts out!
Wednesday – I decided to move my insurance exam by one month and I am so relieved! However, still no sewing last night, as I made cookies instead, plus did some laundry, helped DD with homework and those types of things. Plus volunteering at the school. Thursday’s goal is 4 inches of snow and a lot of piecing!
Thursday – I finally made it down to the sewing room! I got lots of progress made on probably all the wrong things! I worked on more coasters. I really just need one for the giftie, but I want all of those bonus HST’s sewn up and handled. I was able to get all of them pressed and sorted into stacks, so I have 15 more coasters to go. I am making little broken dishes blocks. I’ve decided (because I am BRILLANT!!!!) to use 18 of them as the squares in the January Quilted Table runner of the month. I have some bright blue snowflake fabric I can use for the rectangles and one or two white snowflake FQ’s (or maybe some scraps) for the stars. Yay!
And then I kept on sewing on the Dad quilt. Kim got the 4 patches done, so I started adding a side pice to a bunch of them. I also kept making uphill units and working on sewing the corner squares to the top and bottom row units, which use the downhill units I already have made.
No LCRR progress. Must finish tonight and mail tomorrow before the bad weather comes.
Snow clocked in at about 2 inches.
Peter/Hunter quilt – progress of some sort
Trifecta – quilted (or at least started…)
Crayon – red crayon done
Giftie – progress
Coasters giftie – done
Dad – progress
Tumbleweeds – find!!!
Pictures into guild for show
LCRR – final strips for final block set
What I got done:
Friday – 11/30/07 - I bought fabric for the last LCRR I ever plan on doing in my life and also thread to quilt the snow coasters and the Trifecta quilt. I also bought a SideWinder, which I didn’t think I needed and then my bobbin winder broke.
Saturday and Sunday – Kim and I really made some serious headway into the Dad quilt. She made the 72 center 4 patches and also started to attach white squares to downhill HST bricks. That was a huge help. I started making the uphill bricks and worked on the LCRR.
Monday – I crashed, man. Sleep. Zzzzzzzz…..
Tuesday – No quilting here because DD had her little winter program at school. It was so cute to see 200 kindergarteners and first graders singing their little hearts out!
Wednesday – I decided to move my insurance exam by one month and I am so relieved! However, still no sewing last night, as I made cookies instead, plus did some laundry, helped DD with homework and those types of things. Plus volunteering at the school. Thursday’s goal is 4 inches of snow and a lot of piecing!
Thursday – I finally made it down to the sewing room! I got lots of progress made on probably all the wrong things! I worked on more coasters. I really just need one for the giftie, but I want all of those bonus HST’s sewn up and handled. I was able to get all of them pressed and sorted into stacks, so I have 15 more coasters to go. I am making little broken dishes blocks. I’ve decided (because I am BRILLANT!!!!) to use 18 of them as the squares in the January Quilted Table runner of the month. I have some bright blue snowflake fabric I can use for the rectangles and one or two white snowflake FQ’s (or maybe some scraps) for the stars. Yay!
And then I kept on sewing on the Dad quilt. Kim got the 4 patches done, so I started adding a side pice to a bunch of them. I also kept making uphill units and working on sewing the corner squares to the top and bottom row units, which use the downhill units I already have made.
No LCRR progress. Must finish tonight and mail tomorrow before the bad weather comes.
Snow clocked in at about 2 inches.
Thursday, December 06, 2007
Wednesday - not quilting better, but mental health better!
I decided to move my insurance exam by one month and I am so relieved! However, still no sewing last night, as I made cookies instead, plus did some laundry, helped DD with homework and those types of things. Plus volunteering at the school. Thursday’s goal is 4 inches of snow and a lot of piecing!
Wednesday, December 05, 2007
Tuesday
No quilting here because DD had her little winter program at school. It was so cute to see 200 kindergarteners and first graders singing their little hearts out!
Tuesday, December 04, 2007
Monday, December 03, 2007
I'm back
I'm back. I beat the storm to Chicago and also came home after all the ice had melted and eerything had passed. The Bears lost, but the rain stopped as the game started and the wind wasn't that bad. I had a good time, personally.
Kim and I really got far on the Dad quilt. She made the 4 patch centers and I worked on the uphill and downhill units. Then I had her start assembled the parts to make the top row of each block and she flew on that. The more we get done now, the more time I have to study.
Kim and I really got far on the Dad quilt. She made the 4 patch centers and I worked on the uphill and downhill units. Then I had her start assembled the parts to make the top row of each block and she flew on that. The more we get done now, the more time I have to study.
Saturday, December 01, 2007
Travelling
I have Bears tickets for Sunday in Chicago, so I am leaving within the hour to get there. Check weather.com for 61761 where I live and you can see all about the evil ice storm coming. Ted ran to Meijer to get a campstove in case the power goes out. Then he can at least cook for himself and DD. I will have to stop in Morris for my machine and that is an hour detour, but well worth it. I should be in Brookfield by 11, which is when it's due to hit up there. The goal is to just outrun the storm.
Peace out. Pray for my safety and for all traveling today.
Peace out. Pray for my safety and for all traveling today.
Friday, November 30, 2007
Brilliant!!!
I am just brilliant! Yes, really, I am!
Tomorrow the weather from central IL to Chicago is supposed to be downright nasty as the day goes on. We are projected to get freezing rain, sleet, ice and other bundles of joy. I need to be in Chicago by 3:15 on Sunday for the Bears game, for which I have a ticket. So what to do?
I have decided to go up early (like as early as I leave for work) tomorrow. Stop on Morris at the dealer to pick up the Janome. Then head into Brookfield and spend 2 nights with my sister (her 2 boys and our Dad, making it a 3 generational house of nuttiness, but that is another story for another day) (and let’s not forget the 2 cats and one dog).
As previously mentioned, I am making a quilt for my Dad for Xmas. So since I will have the Janome in tow, Kim and I will set up shop in her upstairs bedroom suite, and power sew the top. If I can leave early on Monday morning with the top all done (and studied through Chapter 6, another goal), it will have been a fantastic weekend!
Tomorrow the weather from central IL to Chicago is supposed to be downright nasty as the day goes on. We are projected to get freezing rain, sleet, ice and other bundles of joy. I need to be in Chicago by 3:15 on Sunday for the Bears game, for which I have a ticket. So what to do?
I have decided to go up early (like as early as I leave for work) tomorrow. Stop on Morris at the dealer to pick up the Janome. Then head into Brookfield and spend 2 nights with my sister (her 2 boys and our Dad, making it a 3 generational house of nuttiness, but that is another story for another day) (and let’s not forget the 2 cats and one dog).
As previously mentioned, I am making a quilt for my Dad for Xmas. So since I will have the Janome in tow, Kim and I will set up shop in her upstairs bedroom suite, and power sew the top. If I can leave early on Monday morning with the top all done (and studied through Chapter 6, another goal), it will have been a fantastic weekend!
Week 49 goals
Goals for Week 49:
Peter/Hunter quilt – progress of some sort
Trifecta – quilted (or at least started…)
Crayon – red crayon done
Giftie – progress
Coasters giftie – done
Dad – progress
Tumbleweeds – find!!!
Pictures into guild for show
LCRR – final strips for final block set
I must study, and that takes precedence over all!
Peter/Hunter quilt – progress of some sort
Trifecta – quilted (or at least started…)
Crayon – red crayon done
Giftie – progress
Coasters giftie – done
Dad – progress
Tumbleweeds – find!!!
Pictures into guild for show
LCRR – final strips for final block set
I must study, and that takes precedence over all!
Week 48
Week 48 was better than I thought, but not as much as I would have liked. Studying and the stress of studying are freaking me out pretty good at this point.
Goals for Week 48:
King - 4 x 4 disappearing 9 patch center done
Peter/Hunter quilt – progress of some sort
Trifecta – quilted (or at least started…)
Crayon – red crayon done
Giftie – progress
Coasters giftie – done
Dad – progress
Tumbleweeds – find!!!
Pictures into guild for show
What I got done:
I started week 48 on Sunday the 25th, which was the first full day home from KS. I made it a pretty productive day…
Sunday, 11/25/07:
King – 4 x 4 disappearing 9 patch center done. It’s 54 inches square and turned out really well.
Dad – Sewed 80 squares to 80 bricks and did all the bonus triangles.
Started 10 string blocks.
Monday, 11/26/07:
Nothing.
Tuesday, 11/27/07:
Made center for red crayon and added 2 strips. Finished string blocks. Sandwiched the roll up thing. Prepped 80 white squares and also made 8 4 patch centers.
Wednesday, 11/28/07:
Started red crayon and stopped after screw-up. Sewed the 80 squares and cut another 64.
Thursday, 11/29/07:
Started on the coasters giftie. I have hundreds of bonus triangles from my snowmen quilt and I am setting them together as Broken Dishes for coasters. I had 4 blocks made, then I did 6 more last night and I still do not have all the triangles ironed and sorted. I need 12 coasters – 6 for the gift and 6 for me, plus I will use the rest of the blocks in a table runner for me. So the more blocks the merrier.
Goals for Week 48:
King - 4 x 4 disappearing 9 patch center done
Peter/Hunter quilt – progress of some sort
Trifecta – quilted (or at least started…)
Crayon – red crayon done
Giftie – progress
Coasters giftie – done
Dad – progress
Tumbleweeds – find!!!
Pictures into guild for show
What I got done:
I started week 48 on Sunday the 25th, which was the first full day home from KS. I made it a pretty productive day…
Sunday, 11/25/07:
King – 4 x 4 disappearing 9 patch center done. It’s 54 inches square and turned out really well.
Dad – Sewed 80 squares to 80 bricks and did all the bonus triangles.
Started 10 string blocks.
Monday, 11/26/07:
Nothing.
Tuesday, 11/27/07:
Made center for red crayon and added 2 strips. Finished string blocks. Sandwiched the roll up thing. Prepped 80 white squares and also made 8 4 patch centers.
Wednesday, 11/28/07:
Started red crayon and stopped after screw-up. Sewed the 80 squares and cut another 64.
Thursday, 11/29/07:
Started on the coasters giftie. I have hundreds of bonus triangles from my snowmen quilt and I am setting them together as Broken Dishes for coasters. I had 4 blocks made, then I did 6 more last night and I still do not have all the triangles ironed and sorted. I need 12 coasters – 6 for the gift and 6 for me, plus I will use the rest of the blocks in a table runner for me. So the more blocks the merrier.
Thursday, November 29, 2007
Wednesday - So-So
Wednesday afternoon at work was a mess, so some of that work came home with me. Plus we went out for dinner, so that took time. I started red crayon and stopped after screwing up. It now needs some frogging. So then I sewed the 80 squares and cut another 64 for the Dad quilt. So it was not a total loss.
Wednesday, November 28, 2007
Tuesday's progress
Tuesday made for a better night for quilting. First of all, I studied, which always makes me feel better.
I made the center for red crayon and added 2 strips. 10 string blocks got finished (but I can't find the other 10 I've done...hmmm...). I sandwiched the top of the giftie. And I prepped 80 white squares and also made 8 4 patch centers for the Dad quilt.
Not as much as I would like, but progress is prgress. I absolutely must sew on the Dad quilt every day in order to make Christmas without a panic.
I made the center for red crayon and added 2 strips. 10 string blocks got finished (but I can't find the other 10 I've done...hmmm...). I sandwiched the top of the giftie. And I prepped 80 white squares and also made 8 4 patch centers for the Dad quilt.
Not as much as I would like, but progress is prgress. I absolutely must sew on the Dad quilt every day in order to make Christmas without a panic.
Tuesday, November 27, 2007
no progress
No quilting last night. Too busy catching up on grocery shopping, dishes, homework with DD and the like. And watching the Amzaing Race on tivo.
I didn't study last night, but I did study for 30 minutes throughout the day.
I didn't study last night, but I did study for 30 minutes throughout the day.
Monday, November 26, 2007
Week 48 Goals
And now on to Week 48…
Goals for Week 48:
King - 4 x 4 disappearing 9 patch center done
Peter/Hunter quilt – progress of some sort
Trifecta – quilted (or at least started…)
Crayon – red crayon done
Giftie – progress
Coasters giftie – done
Dad – progress
Tumbleweeds – find!!!
Pictures into guild for show
Goals for Week 48:
King - 4 x 4 disappearing 9 patch center done
Peter/Hunter quilt – progress of some sort
Trifecta – quilted (or at least started…)
Crayon – red crayon done
Giftie – progress
Coasters giftie – done
Dad – progress
Tumbleweeds – find!!!
Pictures into guild for show
Week 47
Since I was away from the PC for most of the week, I construed my week-end to be on Saturday.
Goals for Week 47 (traveling on holiday):
Tumbleweeds – find!!!
Trifecta - quilted
Pictures into guild for show
GFG – done with goal (6 flowers finished)
Crayon - Cut red crayon, cut brown crayon, cut black crayon
Cut for OK Backroads
Peter/Hunter quilt – progress of some sort
What I got done:
Over the weekend, I cut everything I need (or should need) for 72 Backroads to OK squares. I also cut I don’t know how many pairs of nickels and also cut the red crayon and the black crayon. I also finished sewing the brown crayon. And the patches needed to sew a 4 x 4 disappearing 9 patch have also been cut.
Then I started on the giftie that is due mid-December. I have the ‘top’ done.
The goal of the weekend was to get everything cut so I can power sew on Sunday. We shall see.
During the week in KS, I did finish 3 GFG flowers: red #1, orange #1 and yellow #1. They took a lot longer than I have budgeted.
Goals for Week 47 (traveling on holiday):
Tumbleweeds – find!!!
Trifecta - quilted
Pictures into guild for show
GFG – done with goal (6 flowers finished)
Crayon - Cut red crayon, cut brown crayon, cut black crayon
Cut for OK Backroads
Peter/Hunter quilt – progress of some sort
What I got done:
Over the weekend, I cut everything I need (or should need) for 72 Backroads to OK squares. I also cut I don’t know how many pairs of nickels and also cut the red crayon and the black crayon. I also finished sewing the brown crayon. And the patches needed to sew a 4 x 4 disappearing 9 patch have also been cut.
Then I started on the giftie that is due mid-December. I have the ‘top’ done.
The goal of the weekend was to get everything cut so I can power sew on Sunday. We shall see.
During the week in KS, I did finish 3 GFG flowers: red #1, orange #1 and yellow #1. They took a lot longer than I have budgeted.
Monday, November 19, 2007
Gobble Gobble
This will be my last post until I return from KS over the weekend. I got a lot of Christmas shopping done after work today, and I have finished my cutting goals for before the trip. I also have started to work on my Secret Santa giftie, so that's always a plus.
Peace out.
Peace out.
Sunday, November 18, 2007
I'm getting there...
It appears that I am getting the hang of this blogspot thing. Some pieces are far more intuitive than I thought they would be. That helps.
I dropped off my machine at the dealer yesterday morning and asked them to ask the tech if a leader/ender was required to sew on this machine. They were of the "no" school of thought, as am I, but others swear it's required. We shall see what the tech says. Now, I know the machine comes back with a piece of fabric under the foot, but I have always regarded it as proof that the tech tested and reset the tension for the various stitches, not as an endorsement of leaders/enders. Stay tuned.
Yesterday was spend up north doing various things, including celebrating Thanksgiving with my family with BLTs. Don't ask - it works for us! We arrived at my MIL's late in the afternoon and she about gave me the third degree about where we were all day. Um, I have family too? Whatever. Most importantly, she has my dog, and Taffy is going downhill fast. So I said my goodbyes and wished her well at the Rainbow Bridge. I would be surprised if Taffy lasted until year end. She's just really old.
So without a child this morning, Ted and I were befuddled with what to do. I actually finished cutting for the disappearing 9 patch center of my King quilt, and the colored patches for the Dad quilt, and the strips for the red crayon. I then finished sewing the brown crayon and started cutting the black crayon. I am nearing the completion of my cutting goals pre-gobble.
Yes, I did sew. My old Kenmore has weathered the move well. YAY! It will get me through until my Gem is ready.
So off to the basement to do more. I want to finish cutting the black crayon and start cutting the white squares for the Dad quilt and I don't know what else.
I dropped off my machine at the dealer yesterday morning and asked them to ask the tech if a leader/ender was required to sew on this machine. They were of the "no" school of thought, as am I, but others swear it's required. We shall see what the tech says. Now, I know the machine comes back with a piece of fabric under the foot, but I have always regarded it as proof that the tech tested and reset the tension for the various stitches, not as an endorsement of leaders/enders. Stay tuned.
Yesterday was spend up north doing various things, including celebrating Thanksgiving with my family with BLTs. Don't ask - it works for us! We arrived at my MIL's late in the afternoon and she about gave me the third degree about where we were all day. Um, I have family too? Whatever. Most importantly, she has my dog, and Taffy is going downhill fast. So I said my goodbyes and wished her well at the Rainbow Bridge. I would be surprised if Taffy lasted until year end. She's just really old.
So without a child this morning, Ted and I were befuddled with what to do. I actually finished cutting for the disappearing 9 patch center of my King quilt, and the colored patches for the Dad quilt, and the strips for the red crayon. I then finished sewing the brown crayon and started cutting the black crayon. I am nearing the completion of my cutting goals pre-gobble.
Yes, I did sew. My old Kenmore has weathered the move well. YAY! It will get me through until my Gem is ready.
So off to the basement to do more. I want to finish cutting the black crayon and start cutting the white squares for the Dad quilt and I don't know what else.
Saturday, November 17, 2007
It's really too early to post...
A few odds 'n ends this early Saturday morning...
First of all, I'm taking machine in to the doctor for a check-up. I feel like Linus without his blankey. Waah! I'll be travelling this coming week, so it's a perfect time for it to go in. I'll also set up the other machine, which is still in its moving box, and assess its status as well. I actually can quilt a few things on the old Kenmore, so here's hoping I can get some stuff done done and crossed off the list.
I had great illusions of grandeur yesterday about getting a ton of things done when work was done at 12:45. I went home and took a nap instead. Best use of time; I felt great when I woke up. DH came home from Decatur and we went to get DD. DD decided to stay for parents night out (daycare stays open late so parents can go out - well worth the $7 per hour), so we went to my work's happy hour, had dinner, socialized, came home, watched a movie on tivo and then got DD. Worked for her, worked for us.
I retreated successfully last weekend, so this weekend's goal is to cut a lot. I want to finish cutting the Dad quilt, plus the patches for the King quilt, plus the piano key border for the Batik Lover's quilt. So I will cut like mad, tidy a bit more down here, and get ready for the machine's triumphant return! I need about 3 more hours down here busting tail and I will really be in good shape. So I hope to get 'r done this weekend.
Dinner's already in the crockpot (beef stew) and it;s time to get going to the dealer and to haircuts up north.
First of all, I'm taking machine in to the doctor for a check-up. I feel like Linus without his blankey. Waah! I'll be travelling this coming week, so it's a perfect time for it to go in. I'll also set up the other machine, which is still in its moving box, and assess its status as well. I actually can quilt a few things on the old Kenmore, so here's hoping I can get some stuff done done and crossed off the list.
I had great illusions of grandeur yesterday about getting a ton of things done when work was done at 12:45. I went home and took a nap instead. Best use of time; I felt great when I woke up. DH came home from Decatur and we went to get DD. DD decided to stay for parents night out (daycare stays open late so parents can go out - well worth the $7 per hour), so we went to my work's happy hour, had dinner, socialized, came home, watched a movie on tivo and then got DD. Worked for her, worked for us.
I retreated successfully last weekend, so this weekend's goal is to cut a lot. I want to finish cutting the Dad quilt, plus the patches for the King quilt, plus the piano key border for the Batik Lover's quilt. So I will cut like mad, tidy a bit more down here, and get ready for the machine's triumphant return! I need about 3 more hours down here busting tail and I will really be in good shape. So I hope to get 'r done this weekend.
Dinner's already in the crockpot (beef stew) and it;s time to get going to the dealer and to haircuts up north.
Friday, November 16, 2007
Week 46
Goals for week 46:
Finish sorting charity fabrics and all yarns
Fayge – done
Chiclets – done with goal of 12 blocks
Tumbleweeds – find!!!
Batik lover’s – top done
Trifecta - quilted
Pictures into guild for show
Crayons – yellow done
Clean up workspace/garage
What I got done:
Chiclets – all 12 blocks done.
Fayge quilt – 11/11/07 – Done!
Clean up workspace/garage – 11/11/07 – All garage purple bins are done! 10 bins are down to 2, and those 2 are down in the sewing studio.
Crayons – 11/11/07 - yellow done; brown crayon has 50 strips on it! 11/13/07 – another 10 on brown. 11/14/07 – only 16 left, so I sewed on 24(?). 11/15/07 – started cutting red strips.
Dad & King – cut 3 colors – 11/12/07 – started to cut yellow. 11/13/07 – finished cutting yellow, cut orange and started to cut blue (first cuts done, subcuts need to be done). 11/14/07 – First cuts of green all done and red was started as well as the first cuts for the red crayon. 11/15/07 – started cutting red and green into subcuts and then Survivor came on….
I have picked out the fabric for the inner lining of an organizer thing that I am making for my Secret Santa on the Kansas Quilters list. I’ll go to JoAnn’s today to buy zippers and vinyl for the pockets.
So a good week, but not a great week.
Goals for Week 47 (traveling on holiday):
Tumbleweeds – find!!!
Trifecta - quilted
Pictures into guild for show
GFG – done with goal (6 flowers finished)
Crayon - Cut red crayon, cut brown crayon, cut black crayon
Cut for OK Backroads
Peter/Hunter quilt – progress of some sort
Finish sorting charity fabrics and all yarns
Fayge – done
Chiclets – done with goal of 12 blocks
Tumbleweeds – find!!!
Batik lover’s – top done
Trifecta - quilted
Pictures into guild for show
Crayons – yellow done
Clean up workspace/garage
What I got done:
Chiclets – all 12 blocks done.
Fayge quilt – 11/11/07 – Done!
Clean up workspace/garage – 11/11/07 – All garage purple bins are done! 10 bins are down to 2, and those 2 are down in the sewing studio.
Crayons – 11/11/07 - yellow done; brown crayon has 50 strips on it! 11/13/07 – another 10 on brown. 11/14/07 – only 16 left, so I sewed on 24(?). 11/15/07 – started cutting red strips.
Dad & King – cut 3 colors – 11/12/07 – started to cut yellow. 11/13/07 – finished cutting yellow, cut orange and started to cut blue (first cuts done, subcuts need to be done). 11/14/07 – First cuts of green all done and red was started as well as the first cuts for the red crayon. 11/15/07 – started cutting red and green into subcuts and then Survivor came on….
I have picked out the fabric for the inner lining of an organizer thing that I am making for my Secret Santa on the Kansas Quilters list. I’ll go to JoAnn’s today to buy zippers and vinyl for the pockets.
So a good week, but not a great week.
Goals for Week 47 (traveling on holiday):
Tumbleweeds – find!!!
Trifecta - quilted
Pictures into guild for show
GFG – done with goal (6 flowers finished)
Crayon - Cut red crayon, cut brown crayon, cut black crayon
Cut for OK Backroads
Peter/Hunter quilt – progress of some sort
Thursday, November 15, 2007
Productivity Continues!
Productivity rolled into Wednesday night as well. I actually got in 2 mini-study sessions for my insurance exams (think boards, etc.) and if I’ve studied, I always feel like a huge weight has been lifted off my shoulders for the day. So with 35 minutes of studying under my belt, off I went to sew.
I sewed some more strips on to the brown crayon braid. Dimensions will be huge on this thing, based on my early math, so we shall see. It’s busting a lot of little scraps, but since Becky’s stash came into my stash, I can just whack some strips of her voluminous yardage pieces she sent my way. Oy.
I did finish all the subcutting on the blues and then did the first cuts on the green and started on the red. I also started cutting the 2” strips for the red crayon. The only crayons left are the red and the black, so I am getting there.
I did decide that I will quilt each crayon individually, then add some joining strips and join the crayons together and quilt some sort of cable or something down the join. Since my DSM is just a Janome Gem, there’s only so much it can handle. The stitch I want to use to quilt each braid is on my Kenmore, so once the Janome goes to the doctor for a check up on Saturday, I’ll set up the Kenmore and start on the quilting of the crayons. Not exactly the order I want to do everything in, but I will take what I can get. If I can get one braid all done and joined each week, then I will be finished well before the show.
And then a co-worker at Ted’s work had her baby and it was a boy. I have the Peter quilt nearly done, and frankly, since Peter’s parents have never once contacted me since the move and I only know them through my old work, I am deciding that the Peter quilt will now be the Hudson quilt (yes that is what they named him) and I will endeavor to finish that up tonight and tomorrow on the Gem and then finish the hand sewing this weekend.
So I’m torn. Finish the baby quilt or finish my cutting. I hope to handle both.
I sewed some more strips on to the brown crayon braid. Dimensions will be huge on this thing, based on my early math, so we shall see. It’s busting a lot of little scraps, but since Becky’s stash came into my stash, I can just whack some strips of her voluminous yardage pieces she sent my way. Oy.
I did finish all the subcutting on the blues and then did the first cuts on the green and started on the red. I also started cutting the 2” strips for the red crayon. The only crayons left are the red and the black, so I am getting there.
I did decide that I will quilt each crayon individually, then add some joining strips and join the crayons together and quilt some sort of cable or something down the join. Since my DSM is just a Janome Gem, there’s only so much it can handle. The stitch I want to use to quilt each braid is on my Kenmore, so once the Janome goes to the doctor for a check up on Saturday, I’ll set up the Kenmore and start on the quilting of the crayons. Not exactly the order I want to do everything in, but I will take what I can get. If I can get one braid all done and joined each week, then I will be finished well before the show.
And then a co-worker at Ted’s work had her baby and it was a boy. I have the Peter quilt nearly done, and frankly, since Peter’s parents have never once contacted me since the move and I only know them through my old work, I am deciding that the Peter quilt will now be the Hudson quilt (yes that is what they named him) and I will endeavor to finish that up tonight and tomorrow on the Gem and then finish the hand sewing this weekend.
So I’m torn. Finish the baby quilt or finish my cutting. I hope to handle both.
Wednesday, November 14, 2007
Tuesday night progress
A good quilty night, especially when compared to Monday night. Monday night’s lack of stuff can be attributed to white wine in the food and the scents of dinner and the scent of tropical breeze in the Glad Plug-in in the basement all clashing to make me feel nasty. Ted wasn’t doing too hot either, while DD was fine and she didn’t eat the same thing we did.
Anyway, Tuesday’s success. I did finish cutting yellow and then went on to cut all of orange and the first cut on the blues. The first cut is just whacking off a 5” strip from all of these folds of fabric. I was able to determine that 2 large yardage pieces from my cousin are nasty when ironed, so they are poly blends and off to charity they went.
So tonight’s goal is to finish cutting up the blues, cut the greens and make the first cut in the reds. I need to cut for the red crayon as well, and that will just take a ton of time. Tomorrow is our first Brownies meeting, so I have to leave work early to handle pick-up, so I will have more quilty time! Yay! I hope to handle the reds, the whites and the blacks on Thursday.
Oh, and I should do some more on the brown crayon, shouldn’t I?
Anyway, Tuesday’s success. I did finish cutting yellow and then went on to cut all of orange and the first cut on the blues. The first cut is just whacking off a 5” strip from all of these folds of fabric. I was able to determine that 2 large yardage pieces from my cousin are nasty when ironed, so they are poly blends and off to charity they went.
So tonight’s goal is to finish cutting up the blues, cut the greens and make the first cut in the reds. I need to cut for the red crayon as well, and that will just take a ton of time. Tomorrow is our first Brownies meeting, so I have to leave work early to handle pick-up, so I will have more quilty time! Yay! I hope to handle the reds, the whites and the blacks on Thursday.
Oh, and I should do some more on the brown crayon, shouldn’t I?
Tuesday, November 13, 2007
Daily Update
Last night was ho-hum on the quilty front. I started by sewing 10 more on the brown strip (it’s a big long braid) and I started to cut yellow for the Dad quilt and the King quilt (for my bed). I need a 5” strip from 17 yellows, so into the milk crate I went.
I found 13 from large yardage cuts (mostly my cousin’s stash). Some will come from my baggie of small scraps. I need 1 pair of nickels (for the nickel bin) and 1 single nickel for the King quilt. Then I take the remainder and cut it lengthwise into 2 2.5” strips. One goes into the binding baggie (these 2 quilts will just have scrappy binding) and the other gets cut down into as many 2.5” squares and 2.5 x 4.5 bricks as possible.
Dad’s quilt is a Backroads to OK, a Bonnie Hunter pattern. The King quilt is going to a mish-mosh of a lot of stuff and we need another king quilt for our bed because the current one is too small (how 7.5’ by 9’ is too small, I have no idea, but whatever). I found in my sorting something like 50 9” friendship stars from a swap in 2002 and another 50 6” siggie squares from another swap in 2001 or 2002. So when I did the math, I can make a quilt that is medallion style.
Center: disappearing 9 patch, with the same center square in each 9 patch to provide some sort of continuity. 16 squares, set 4 x 4.
2” plain border
Flying geese
2” plain border
Friendship stars
2” plain border
Siggie squares
2” plain border
Friendship stars
2” plain border
Mathematically this turns out huge, but that’s what we need.
The goal is to have everything cut before I leave for my annual sojourn to KS for Thanksgiving and then to power sew upon my return.
And best of all, both will come 100% from stash and thus be free!
I found 13 from large yardage cuts (mostly my cousin’s stash). Some will come from my baggie of small scraps. I need 1 pair of nickels (for the nickel bin) and 1 single nickel for the King quilt. Then I take the remainder and cut it lengthwise into 2 2.5” strips. One goes into the binding baggie (these 2 quilts will just have scrappy binding) and the other gets cut down into as many 2.5” squares and 2.5 x 4.5 bricks as possible.
Dad’s quilt is a Backroads to OK, a Bonnie Hunter pattern. The King quilt is going to a mish-mosh of a lot of stuff and we need another king quilt for our bed because the current one is too small (how 7.5’ by 9’ is too small, I have no idea, but whatever). I found in my sorting something like 50 9” friendship stars from a swap in 2002 and another 50 6” siggie squares from another swap in 2001 or 2002. So when I did the math, I can make a quilt that is medallion style.
Center: disappearing 9 patch, with the same center square in each 9 patch to provide some sort of continuity. 16 squares, set 4 x 4.
2” plain border
Flying geese
2” plain border
Friendship stars
2” plain border
Siggie squares
2” plain border
Friendship stars
2” plain border
Mathematically this turns out huge, but that’s what we need.
The goal is to have everything cut before I leave for my annual sojourn to KS for Thanksgiving and then to power sew upon my return.
And best of all, both will come 100% from stash and thus be free!
Monday, November 12, 2007
Virtual Retreat Success!
What a great quilty weekend! Stashbusters had a virtual retreat this weekend, and I was participating! I got a lot done for quilting, but not necessarily all at the machine.
The most important achievement of the weekend was that we went through all the Rubbermaid bins in the garage. I thought for sure that nearly all of them were full of crafts. Only 10 of the 30 were and I whipped through those 10 in an hour. Several bins had fabric that I bought 15+ years ago, so I went ahead and donated it all. It was not quilting cotton. One bin had my Looney Tunes fabrics in it and another had a tumbling blocks quilt that I had started, so I put those 2 together in one bin. Another bin was one I packed from my old sewing room and so it was just lost and now it is found. YAY!
There was another bin’s worth of stuff that was other crafts worth saving. Some cross stitch supplies and the hot glue gun and some other stuff, so those things got filed back into my craft supplies elfa shelving unit. And another bin was full of purple fabrics, so now purple has its own milk crate under my sewing table. I also found a ton of orphan blocks, so I added them to the orphan block baggie I’ve started. We’ll see what happens with those blocks. One set of blocks is enough to make a lap quilt I think, so that may be a good piece to practice some FMQ.
So overall, it resulted in 2 bags of donations, 1 bag of garbage, 2 bins of quilting fabric and general peace of mind. I thought for sure that my stash in the garage was far bigger. Now I think I have located all my stash, but I am still missing one project. That is the goal for this week.
I also cut 3 colors for the Dad quilt – brown, pink and purple. I sewed the yellow crayon and started the brown crayon. And I finished the Fayge quilt (while busting a bunch of tivo!).
So we shall see what I get done tonight. More of the brown crayon, and I want to cut yellow, blue and orange for the Dad quilt. And maybe sort the last charity fabrics in the sewing room, but let’s not get greedy.
The most important achievement of the weekend was that we went through all the Rubbermaid bins in the garage. I thought for sure that nearly all of them were full of crafts. Only 10 of the 30 were and I whipped through those 10 in an hour. Several bins had fabric that I bought 15+ years ago, so I went ahead and donated it all. It was not quilting cotton. One bin had my Looney Tunes fabrics in it and another had a tumbling blocks quilt that I had started, so I put those 2 together in one bin. Another bin was one I packed from my old sewing room and so it was just lost and now it is found. YAY!
There was another bin’s worth of stuff that was other crafts worth saving. Some cross stitch supplies and the hot glue gun and some other stuff, so those things got filed back into my craft supplies elfa shelving unit. And another bin was full of purple fabrics, so now purple has its own milk crate under my sewing table. I also found a ton of orphan blocks, so I added them to the orphan block baggie I’ve started. We’ll see what happens with those blocks. One set of blocks is enough to make a lap quilt I think, so that may be a good piece to practice some FMQ.
So overall, it resulted in 2 bags of donations, 1 bag of garbage, 2 bins of quilting fabric and general peace of mind. I thought for sure that my stash in the garage was far bigger. Now I think I have located all my stash, but I am still missing one project. That is the goal for this week.
I also cut 3 colors for the Dad quilt – brown, pink and purple. I sewed the yellow crayon and started the brown crayon. And I finished the Fayge quilt (while busting a bunch of tivo!).
So we shall see what I get done tonight. More of the brown crayon, and I want to cut yellow, blue and orange for the Dad quilt. And maybe sort the last charity fabrics in the sewing room, but let’s not get greedy.
Friday, November 09, 2007
Week 45 results and Week 46 Goals
Week 45 was interesting. I did get a lot of sewing done at the retreat, but none of that is reflected on here, since I revamped my list post-retreat.
Goals:
Crayons – yellow done
Chiclets – do some more blocks (I hate this one and will be very glad to get this over with and stick it back in its hidey hole!)
Sort charity fabrics
Fayge quilt – attach binding for handsewing
Trifecta – sandwiched
Clean up workspace
What I got done:
Chiclets – 1 side on the 12 blocks.
Fayge quilt – 11/08/07 – binding attached and one side whipped down during Survivor
Clean up workspace – 11/06/07 – 3 hours! 11/07/07 – 3 hours!
Goals for week 46:
Finish sorting charity fabrics and all yarns
Fayge – done
Chiclets – done with goal of 12 blocks
Tumbleweeds – find!!!
Batik lover’s – top done
Trifecta - quilted
Pictures into guild for show
Crayons – yellow done
Clean up workspace/garage
We shall see how week 46 goes. I have insurance exams to study for, and that just has to happen.
Goals:
Crayons – yellow done
Chiclets – do some more blocks (I hate this one and will be very glad to get this over with and stick it back in its hidey hole!)
Sort charity fabrics
Fayge quilt – attach binding for handsewing
Trifecta – sandwiched
Clean up workspace
What I got done:
Chiclets – 1 side on the 12 blocks.
Fayge quilt – 11/08/07 – binding attached and one side whipped down during Survivor
Clean up workspace – 11/06/07 – 3 hours! 11/07/07 – 3 hours!
Goals for week 46:
Finish sorting charity fabrics and all yarns
Fayge – done
Chiclets – done with goal of 12 blocks
Tumbleweeds – find!!!
Batik lover’s – top done
Trifecta - quilted
Pictures into guild for show
Crayons – yellow done
Clean up workspace/garage
We shall see how week 46 goes. I have insurance exams to study for, and that just has to happen.
Thursday, November 08, 2007
Quilty Goals - 2008
Another post. I pilfered off my LiveJournal account so that my blogspot has a clear thread about what I am thinking on the quilting front. This was written a few weeks ago, so some paragraphs will have updates.
I have taken some serious stock of my quilting stuff since I had to integrate my cousin’s stash into my own and man, I have enough fabric. I have decided to participate in some quilty challenges in 2008. I’m on a yahoo group called Stashbusters, and they have several challenges to get people using or donating their stash and not making the problem worse. The 4 challenges I hope to participate in are:
The No Buy Challenge – I will not join officially, so I will do what is know as the Spirit of No Buy, which a lot of us do. The premise is that you can only buy to finish a project you are doing RIGHT NOW. These are legal purchases. I would love to do this for a year, if not longer. Right now I am aiming for starting after I get back from retreat (November 5) and getting through year end. I am thinking of saving up $10 per week for every week I can make it through. By the end of 2008, that would be a tidy sum. I am including books and patterns in that, but I do have a running tools list that I keep. If I find it, I buy it, as not every shop carries every thing. UPDATE: I bought nothing at the retreat, and so I need to start saving my $10 bills!
The 100 Yard Dash Challenge – Everyone just does this one by themselves; there’s no official challenge as we cannot come to a consensus on how to count it. Some want to do only things in your stash, but if you had to make a purchase (as indicated above), that doesn’t count. I just take the measurements of the project, count the front and back, convert to square inches and add the binding. Then I take the total square inches and divide it by 42” for the width of the fabric on the bolt and then by 36” for yardage. Right now, I’ve used about 20 yards in 2007, but should I bang out a ton of finishes here in the last 2 months, that could ramp up quickly. My goal would be 200 yards (this year and next) by the end of 2008.
The UFO Challenge – this one I join for real. It’s complicated to explain, but my personal goals for 2008 are 12 twin sized (or greater) finishes. This is basically finishing up old projects that have been abandoned. Another goal is not to start any more; the count needs to go down.
The WIPs and WHIMMs Challenge – this is another one I join for real. This rewards the projects started and completed within the same calendar year, thus reducing new UFOs. I don’t care how many of these I have.
UPDATE: I was the Linus Lady for my guild and then I moved. I spoke to my fellow guild members/bee members at the retreat last weekend (it is fantastic when your guild President and VP are in your bee. You can get so much done!), and they solved the problem for me. The ruling was that the guild will no longer support Project Linus as a guild. People are free to do their own thing. As for all the supplies and fabric that people dumped on me for Linus that I paid to move, I can sort through them and donate them in my local community to a like charity. YAY! I have been going through boxes and bins for the last 2 days, sorting into charity for Linus, charity other, garbage and my stuff. 3 boxes are gone, 1 more is full of Linus stuff, 1 garbage bag is other charity donations and there are 3 bags of garbage. YAY! This has been a huge hassle in my garage and we need to get it resolved. Now that it is, full steam ahead!
I have taken some serious stock of my quilting stuff since I had to integrate my cousin’s stash into my own and man, I have enough fabric. I have decided to participate in some quilty challenges in 2008. I’m on a yahoo group called Stashbusters, and they have several challenges to get people using or donating their stash and not making the problem worse. The 4 challenges I hope to participate in are:
The No Buy Challenge – I will not join officially, so I will do what is know as the Spirit of No Buy, which a lot of us do. The premise is that you can only buy to finish a project you are doing RIGHT NOW. These are legal purchases. I would love to do this for a year, if not longer. Right now I am aiming for starting after I get back from retreat (November 5) and getting through year end. I am thinking of saving up $10 per week for every week I can make it through. By the end of 2008, that would be a tidy sum. I am including books and patterns in that, but I do have a running tools list that I keep. If I find it, I buy it, as not every shop carries every thing. UPDATE: I bought nothing at the retreat, and so I need to start saving my $10 bills!
The 100 Yard Dash Challenge – Everyone just does this one by themselves; there’s no official challenge as we cannot come to a consensus on how to count it. Some want to do only things in your stash, but if you had to make a purchase (as indicated above), that doesn’t count. I just take the measurements of the project, count the front and back, convert to square inches and add the binding. Then I take the total square inches and divide it by 42” for the width of the fabric on the bolt and then by 36” for yardage. Right now, I’ve used about 20 yards in 2007, but should I bang out a ton of finishes here in the last 2 months, that could ramp up quickly. My goal would be 200 yards (this year and next) by the end of 2008.
The UFO Challenge – this one I join for real. It’s complicated to explain, but my personal goals for 2008 are 12 twin sized (or greater) finishes. This is basically finishing up old projects that have been abandoned. Another goal is not to start any more; the count needs to go down.
The WIPs and WHIMMs Challenge – this is another one I join for real. This rewards the projects started and completed within the same calendar year, thus reducing new UFOs. I don’t care how many of these I have.
UPDATE: I was the Linus Lady for my guild and then I moved. I spoke to my fellow guild members/bee members at the retreat last weekend (it is fantastic when your guild President and VP are in your bee. You can get so much done!), and they solved the problem for me. The ruling was that the guild will no longer support Project Linus as a guild. People are free to do their own thing. As for all the supplies and fabric that people dumped on me for Linus that I paid to move, I can sort through them and donate them in my local community to a like charity. YAY! I have been going through boxes and bins for the last 2 days, sorting into charity for Linus, charity other, garbage and my stuff. 3 boxes are gone, 1 more is full of Linus stuff, 1 garbage bag is other charity donations and there are 3 bags of garbage. YAY! This has been a huge hassle in my garage and we need to get it resolved. Now that it is, full steam ahead!
List through the Guild Show
Well, I’ve had this blogspot account reserved for quite some time, as it matches my LiveJournal account. I rather like my user name, so I’m fussy about keeping it. Kinda like Bonnie Hunter and Quiltville. My goal of this blog is to journal my quilting (my LiveJournal account handles everything else, and in that one, I swear like a sailor, so be warned if you go over there!). I love to quilt and have been at it for 20 years, making my first quilt at age 16.
To get this blog going, I’m going to list my goals between now and the end of the year. I decided to start journaling my quilting by week a few months ago. The week starts when my work week ends. If I’m done at noon on Friday, well then, that’s when the week starts. The week ends when I arrive at work on that last day of my work week. Typically the week ends on Friday morning and then the new one starts on Friday afternoon.
My list below contains all things that I want to finish by my guild’s show in early March. Fat chance, I know, but if I do not dream, I will never get anywhere. This does keep me on some level of task to get things done. I want to hang 3 quilts in the show and they are all on this list. If they are the only 3 things I get done, well, then it’s a success.
So without further adieu, the full list of everything I wrote down, just free form. I will put down some goals between now and year end and see where we are by then. Yes, it’s a lot of projects, but what can I say?
Batik lover’s – top done
Tumbleweeds - find
Crayons – top done
Fence rail/LCRR – top done, back done (both are quilts – it’s reversible)
Snowmen – sandwiched
Snow accessories - done
Peter quilt - done
Fayge quilt - done
Jackson quilt - done
Lasagna - done
Lasagna - done
St. Pat’s – find
St. Pat’s accessories - find
OK backroads - done
Charity LCRR 1 - done
Charity LCRR 2 - started
Charity LCRR 3 - nothing
Quiltfabric.com – blocks done
Shower curtain - done
Super Secret Quilt - designed
GFG – 6 flowers done
Denim – started
Strings – 100 blocks done
Gifties – need 10 – 1 has to be done by Dec 15, so 1 done. Blocks done for all, supplies purchased for all.
Silent auction item – aiming for St. Pat’s table runner, so need to find St. Pat’s stuff
Chiclets – 12 blocks done
QFAH batik quilt – through hour 10
Pink & Yellow LCRR – top done
Trifecta - done
Bedroom quilt – top done
So now by week:
45
Crayons – yellow done
Chiclets – do some more blocks (I hate this one and will be very glad to get this over with and stick it back in its hidey hole!)
Sort charity fabrics
Fayge quilt – attach binding for handsewing
Trifecta – sandwiched
Clean up workspace – 11/06/07 – 3 hours! 11/07/07 – 3 hours!
46
Finish sorting charity fabrics and all yarns
Fayge – done
Chiclets – done with goal (I really hate this one, can’t you tell?!?!)
Tumbleweeds – find!!!
Batik lover’s – top done
Trifecta - quilted
Pictures into guild for show
47
GFG – done with goal
Crayon - Cut red crayon, cut brown crayon, cut black crayon
Cut for OK backroads
Trifecta -done
(traveling on holiday)
OK, back to work!
To get this blog going, I’m going to list my goals between now and the end of the year. I decided to start journaling my quilting by week a few months ago. The week starts when my work week ends. If I’m done at noon on Friday, well then, that’s when the week starts. The week ends when I arrive at work on that last day of my work week. Typically the week ends on Friday morning and then the new one starts on Friday afternoon.
My list below contains all things that I want to finish by my guild’s show in early March. Fat chance, I know, but if I do not dream, I will never get anywhere. This does keep me on some level of task to get things done. I want to hang 3 quilts in the show and they are all on this list. If they are the only 3 things I get done, well, then it’s a success.
So without further adieu, the full list of everything I wrote down, just free form. I will put down some goals between now and year end and see where we are by then. Yes, it’s a lot of projects, but what can I say?
Batik lover’s – top done
Tumbleweeds - find
Crayons – top done
Fence rail/LCRR – top done, back done (both are quilts – it’s reversible)
Snowmen – sandwiched
Snow accessories - done
Peter quilt - done
Fayge quilt - done
Jackson quilt - done
Lasagna - done
Lasagna - done
St. Pat’s – find
St. Pat’s accessories - find
OK backroads - done
Charity LCRR 1 - done
Charity LCRR 2 - started
Charity LCRR 3 - nothing
Quiltfabric.com – blocks done
Shower curtain - done
Super Secret Quilt - designed
GFG – 6 flowers done
Denim – started
Strings – 100 blocks done
Gifties – need 10 – 1 has to be done by Dec 15, so 1 done. Blocks done for all, supplies purchased for all.
Silent auction item – aiming for St. Pat’s table runner, so need to find St. Pat’s stuff
Chiclets – 12 blocks done
QFAH batik quilt – through hour 10
Pink & Yellow LCRR – top done
Trifecta - done
Bedroom quilt – top done
So now by week:
45
Crayons – yellow done
Chiclets – do some more blocks (I hate this one and will be very glad to get this over with and stick it back in its hidey hole!)
Sort charity fabrics
Fayge quilt – attach binding for handsewing
Trifecta – sandwiched
Clean up workspace – 11/06/07 – 3 hours! 11/07/07 – 3 hours!
46
Finish sorting charity fabrics and all yarns
Fayge – done
Chiclets – done with goal (I really hate this one, can’t you tell?!?!)
Tumbleweeds – find!!!
Batik lover’s – top done
Trifecta - quilted
Pictures into guild for show
47
GFG – done with goal
Crayon - Cut red crayon, cut brown crayon, cut black crayon
Cut for OK backroads
Trifecta -done
(traveling on holiday)
OK, back to work!
Subscribe to:
Posts (Atom)