I've created this blog to keep with all my friends on Stashbusters who have their quilting blogs here!
Monday, July 20, 2009
Week 30
We’re now somewhere in Week 30, and I have enjoyed and relaxed over these past 10 days or so. While Ted and Renee were both at various overnight events, I had a really bad 4 day migraine, but once that subsided (which is when Ted came home), I did start getting some things accomplished. Not all on my 101 list, but things nonetheless.
And now for my progress:
Sandwich curtain panels – Done! They are sitting upstairs near the sewing machine that can handle that heavy duty quilting.
Finish the green GFG flower – Done! I just decided (while waiting for my health meter to recharge on a video game – don’t laugh, OK?) to sew it together and call it a day.
Finish strips on the barnyard flower – Done! They are hanging at work outside my cube. There are 9 strips to a flower and I am sewing the fourth one on. I sew this flower at lunch.
Find the 2 books I want to read – Haven’t started to read. Walden is one and I still have not made it to the library. I may just read this Star Trek book that Ted gave me to read.
2 meatless meals – Half-Done! Got one done on 07/07. Total is 2 down and 7 to go.
Wannabees RR – Ute – Nothing done.
Wannabees RR – Julie – Halfway done. I have 4 pieced boarders to add and then they need a coordinating border to go with. That is all I can write – Julie reads this blog!!!
60 Mellie blocks – I have 40 done and am working on the next 10.
Review Ted’s CD purchases – Only 4 CD’s left. Ted bought Thriller while at ALA. It seemed like a good idea, with all the hoopla and such. So now we need 3.
Pay $120 to the student loan – this has not been happening.
Candles – Researched some supplies.
And lastly my goals for the time between now and Friday morning:
101 goals:
GFG Barnyard Flower – finish the fourth strip and attach the fifth.
The 2 books – Try to read twice this week on Thoreau.
Start DH’s 401k – Go through the big basket of paperwork and find what I need.
Pass CPCU 530 – Study through chapter 5.
Use up 100 yards in 2009 – There’s some yardage in the sandwiched pile. See if the Christmas BRB can be sandwiched this week as well.
Communicate with my DH’s grandma once a month – When I’m going through that big basket of paperwork, I will also pull out all of Renee’s school photos so that I can get those mailers ready as well.
Unrelated: Renew CPA Registration!!!! This only comes up once every 3 years and it’s due 09/30/09, so I thought I’d put it on here just in case.
Wannabees RR – Ute – started
Wannabees RR – Julie – mailed
60 Mellie blocks – 40 done – get to 60 done
Monday, July 13, 2009
Migraines
Except I had a 4 day migraine. And there went the concept of progress.
Yesterday was the first day I felt I could function for longer than an hour without retreating to a dark room. Saturday, I did drive DD to Chicago so she could spend the week with her aunt, but it was a very painful drive up and a very painful one home. I am just grateful it was achieved.
I also unplugged my phone. I just couldn’t stand the jarring ring every time I could fall asleep to end the migraine.
So while I had all of these grandiose plans to get so very much done as of Wednesday night to the present, very little has been achieved. I did get the kitchen to an acceptable level, as well as the rest of my main floor. This is key; then anyone can walk in. I of course have been living on that floor this week, so it needs maybe 10 minutes of love, but otherwise I am in good shape. (The dry cleaning lying on the floor is really the issue. Dry cleaning is such a pain in the butt.)
I did also start and accomplish a significant amount of the laundry. There are something like 10 loads that need to be done, and Ted comes home tonight (a day early!) and he’ll be bringing his. Hopefully we can stay on top of this. I have been folding as they are complete (and shamelessly watching the Michael Jackson tribute whilst doing so), so folding is remaining current.
I also did finally get downstairs to sew. After declaring that there was absolutely NOTHING on TV on Sunday, I headed down there. I fired up the Friday Night Lights and got through about 5 episodes. I also got 40 blocks down for the Mellie swap (1/3) and sandwiched a curtain panel, which was no small endeavor. That thing was a monster (4 feet by 7 feet just for the top, so you can imagine the rest), but now that one is sandwiched, there’s only one more left to be sandwiched and then the quilting can begin. I also am developing a way to sandwich large quilts via my ironing board, and if it holds true for the second curtain panel, then I will attempt to sandwich the Christmas BRB this way. Then I will have something like 6 quilts ready to be quilted, which is a good and beautiful thing.
And I just remembered to buy tickets and ride bracelets for the county fair! Yay!
Wednesday, July 08, 2009
Prayers
I have decided to bookmark and follow the 3 blogs that made me so emotionally fragile a few weeks ago. They are women who have walked the hard road of grief, but their lives have moved forward (some people just make shrines…). Anyway, one of them has posted a link to a young girl’s story of fighting a brain tumor.
Diagnosed just last week, Kate is 5, loves pink and is fighting an aggressive brain tumor. Their family has been turned upside down. If you pray, pray for these people. This is a shitty thing to go through and no little kid should have to.
http://www.caringbridge.org/visit/mcraekate
OK, one quilty note: I got nothing done yesterday, save 15 minutes of handwork on the barnyard GFG flower.
Tuesday, July 07, 2009
DD is Sewing!
DD and I are also working on skirts. Check out the last June project at the Moda Bake Shop (www.modabakeshop.com) and that is what we are making. Hers is blue and mine is pink. This is the most motivated she has ever been to sew, so it really depends on the project.
Monday, July 06, 2009
Week 29? 30? Bueller?
Sandwich curtain panels
Finish the green GFG flower
Finish strips on the barnyard flower
Find the 2 books I want to read
2 meatless meals
And here are some more goals:
Wannabees RR – Ute
Wannabees RR – Julie
60 Mellie blocks
And my progress from last week:
Review Ted’s CD purchases – I did check with him and nothing else has been purchased besides the Genesis packs. So we need to buy 4 more.
Pay $120 to the student loan – this has not been happening. It is very possible that I will not make this one by Ted’s 40th, but sometime in his 40th year.
Sandwich curtain panels – I actually got one panel sewn, so the process is beginning.
Finish the green GFG flower – I have only one white strip to sew on.
Finish strips on the barnyard flower – all done and waiting in my cube to go.
Find the 2 books I want to read – I actually have some thoughts on this. One is Walden by Thoreau. My sister gave me some other ideas.
Potholders – completed and given to my sister.
Ted and DD will be gone for a while, with everyone back under one roof on Friday, July 17, late that night. So I plan to get lots of annoying things done during that time.
Friday, June 26, 2009
Week 27
Review Ted’s CD purchases
Pay $120 to the student loan
Sandwich curtain panels
Finish the green GFG flower
Finish strips on the barnyard flower
Find the 2 books I want to read.
And here are some more goals:
Wannabees RR - Ute
Potholders
20 Mellie blocks
And my progress from last week:
I did nothing on my list. I’m not surprised, with class winding down. Actually getting my MBA is on my 101 list, and by finishing this class, I am now halfway done with my MBA, which is an achievement, at least in my book. Tonight is Relay for Life and so part of my weekend is booked, but we’ll figure it out.
Wednesday, June 24, 2009
Tuesday, June 23, 2009
36 hours to go
Ted and DD (well, 99% Ted) cleaned up the main floor of the house so we can have people inside our house. It’s a detail. After work today, I can run home, water the plants (OMG, it’s 102 heat index or something crazy like that), do the last bit of tidying (15 minutes max) and get ready for company.
Unfortunately, I don’t think a lot of things on this week’s 10 in 101 goal list will get done this week, but hey, Friday starts a new week, one without class.
So as Scarlett says, ‘tomorrow is another day.’
Friday, June 19, 2009
Week 26 Goals
Review Ted’s CD purchases
Pay $120 to the student loan
Sandwich curtain panels
Finish the green GFG flower - brought it home for the weekend
And here are some more goals:
Wannabees RR
Potholders - started last night
20 Mellie blocks
Finish FIL 440, another class toward the MBA
Tuesday, June 16, 2009
10 in 101
With the summer term for me ending in 9 days (but who’s counting?), I’m going to see if there are 10 things I can do in 101 days. Not quite the same as the 101, but more bite-sixed. This would give me 7 items that would be completely done and others that would have progress. Sometimes, that has to be enough.
Start Date: 06/22/09 (my sister’s birthday)
End Date: 09/29/09 (my birthday)
Yes, it’s only 99 days
1. Complete the grandmother's flower garden quilt (progress is plenty, trust me)
Goal: finish the barnyard flower and green flower. Start diamonds process.
24. Work my way through the Alphabet reading a book by authors whose last name begins with each letter. I didn’t mean I have to read in alphabetical order, just that I have to read a book for every letter.
Brown – The da Vinci Code
Moore – The Stupidest Angel
Goal: Read 2 more books.
• 16. make candles just once
Goal: Complete the mission
• 44. climb a rock wall
Goal: A friend’s kids want to come down to our wall, so maybe then.
• 52. start DH’s 401k
Goal: Fix this mess.
D. Finish my CPCU
Goal: Pass CPCU 530 – test date is 08/19/09
K. Pay off Ted’s student loan
Goal: Current balance is 3800 – get to 2000 left
U. Use up 100 yards in 2009
Goal: Get to only 40 yards left in the dash.
• Make some fabric grocery bags and stop using plastic ones
Goal: Just Do It
64. Communicate with my DH’s grandma once a month
Goal: 3 times
• Eat Meatless one night a week for two months
Goal: Just Do It
9. Complete the woods sampler – restarted on smaller canvas.
Goal: Progress. Not sure how best to do this, but some progress would be good.
• 87. Buy 33 new CD’s (like 1 per month) – DH and I are doing this one together.
Genesis – blue box – 6 CDs
Genesis – red box – 10 CDs
Genesis – green box – 13 CDs
Goal: See if Ted’s bought 4 more CDs. Which I bet he has.
• 19. See the movie Crash
Goal: Stalk the Tivo.
Unrelated: Renew CPA Registration!!!! This only comes up once every 3 years and it’s due 09/30/09, so I thought I’d put it on here just in case.
Tuesday, June 09, 2009
Over Halfway There
I have only 5 more classes to go. I just need to get to June 24 at 10pm and then my summer is my own. Well, except for that insurance exam I need to take on August 19….
Sunday, June 07, 2009
100 Yard Dash Update
Well, that does help to be 8.25 yards closer.
Sunday Morning Peace
It's a gentle rain this morning in central IL. Right now, I hear an owl whoo-hoo-ing. That is very interesting.
My flowers made it into the ground yesterday, so I am grateful for the rain. We never quite made it to Peoria. We were really slow leaving the house and I told Ted there was nothing urgent, so let the day go as it does. We did make it up to Washington to that quilt shop and I did some damage. (I joined a quilt swap where the quilt is a called "A Quilt for Melanie Wilkes." How can I not join?!?!?!)
So today, there is housework and folding and laundry and homework. And getting ready for camp and tonight's cocktail party and hopefully some quilting.
Sorry for no pics yet - slept away Friday afternoon and did I need it. I had a migraine flirting with me and that kept it at bay.
Friday, June 05, 2009
A Baby Step
I did, however, talk in depth with Ted about next week’s schedule and DD’s first week at camp. This is a new experience for her and so we are trying to manage the logistics. She also has expressed an interest in taking karate (the first time ever for a sport) (everything else has been our idea) and so we signed her up for those at $2 per lesson. However, they start Monday, so the first day of camp will be craziness.
So while sewing wasn’t accomplished, logistics and family time were, and that is never a bad thing.
So for this afternoon and tonight….
Piece the 2 panels (rows are done – just piece the rows)
Sandwich the 2 curtain panels
Pictures!
Kim’s potholders
Ute’s RR
Plus stuff like…
Menu planning
Grocery list
Dinner
Brownies paperwork all done and filed away
Camp backpack
Dishes, folding, etc.
Call Kim
Thursday, June 04, 2009
Week 24 Goals
I used to post that my quilting week began on Friday, whenever work was done. Using that, tomorrow at 12:15 starts Week 24. Anything I get done tonight, I’m counting towards it.
Thursday night
Cut and wash curtain panel backing
Piece the 2 panels (rows are done – just piece the rows)
Look at Ute’s RR
Friday night
Sandwich the 2 curtain panels
Pictures!
Kim’s potholders
Ute’s RR
The weekend
Finish Ute’s RR
Do the zigzag quilting on the curtain panels and the chiclet quilt
I have no idea what I can get done next week during the week, so we will just manage with this.
I suck
As I mentioned in a January post, I’m in school until essentially the fourth of July. It’s actually the 24th of June at 10pm, but who is keeping exact track? Last night I had my summer class’ midterm. It seems to have a midterm after only 3 weeks of class, but that is the way it works. My spring classes ended well; I got an A in one (the boring one) and a B in the other. It was my first B in grad school and hopefully my last, but even so, as long as my GPA stays above 3.5 (I’m at 3.81), I continue to qualify for a grad student grant. I need that grant to pay for this whole endeavor!
Anyway, it’s been a dearth of quilting. I have been plagued for the last 4 months with what I describe as annoying illnesses – ear infections, strep, exhaustion and finally diverticulitis, which made me so exhausted, I felt like I did when I had mono. Don’t worry, I don’t have mono! But I have to go a week from tomorrow and have another blood draw done to confirm that I am on the mend and not suffering from thyroid problems or anything else.
So needless to say, quilting has just not been happening. I have suffered a bit from ‘I need to handle this one project before I can face anything else’ syndrome. I also realize that I want to piece, but there’s too much piecing lying around not turning into anything else. I also realize that I have a lot of projects out right now and I am being overwhelmed by them. And Ted’s crap is all over my space right now, and that is not helping things either.
So starting anew, as I am feeling better, the midterm is done and I can see the light at the end of the tunnel:
Goals for June:
Update at least one a week.
Pictures!
2 more potholders for Kim’s birthday on June 22.
Finish Ute’s round robin.
Finish the 2 curtain panels, wash backing, sandwich and zigzag quilt. Attach binding.
Pay Patsy for retreat.
Quilt chiclets quilt.
Sandwich Christmas BRB.
I know there’s more, but let’s just start there.
Sunday, February 22, 2009
This morning
And a good morning to you too.
So now I'm on the third load of laundry. The grocery list is made; now I just need to go and run. A third of my own homework is done. I hope to get partway through the next third before I leave to get groceries.
Ain't life grand?
To keep this quilty, I did finish quilting my P&P last night. Tonight's goal is to trim it and attach the binding. Also, make 6 boxy stars blocks and find my focus fabric for Judy's quilt-along.
Wednesday, February 11, 2009
Morning musings
So here I am.
I need to do a total of stashbusting for January. The only things that got down were a tiny dresser topper and the potholders for Kim. The dresser topper was done for the Inauguration, and it was really the Election Night challenge put out there by Sweet Pea. So not exactly a lot of yardage. I have 2 quilts basted and ready for quilting: Chiclets #1, the P&P and Watermelon Slice. No, I haven’t done any quilting on them at all.
I did, however, on Superbowl Sunday, start a blue boxy stars from Bonnie Hunter. Way back, the goal was to do a Bonnie quilt in blue on the day of the big game. I think that may have changed over time, but that is what I remembered. (Due to homework, I have had to go no mail on my quilting lists.) So I started and got pretty far – maybe halfway with making the 120 units that will make the 30 stars. This quilt will go to the 4th Annual Taste of Brookfield @ your library. The library has its largest fundraiser with FOOD INSIDE THE LIBRARY. Yes, sacrilege if I’ve ever heard it, but it is a ton of fun. I organized the 1st Annual, so I’m partial to this event. It won’t be until the fall, but if I start now, it won’t hurt.
I haven’t been doing a lot of stitching at lunch either, because of year end at work or going out for lunch. I need to get back to that. I’m running out of hexagons and need to start making the large bloom so I can unbaste some! Plus I plan to run Joann’s this weekend and get thread for Watermelon Slice, since thread is on sale.
So my new goals for now are:
Post a January stashbusting total.
1 hex done in February.
Quilt 2 quilts.
Bind 2 quilts.
Finish the stars for boxy stars.
Make dresser topper to match Watermelon Slice.
My Q1 goals are:
25 yards busted from stash.
Finish the fab 4 I want to do: P&P, Chiclets #1, Watermelon Slice and the Christmas BRB.
Finish boxy stars top.
OK that’s plenty and I’m getting overwhelmed. Back to work.
Monday, January 12, 2009
Sneaky
So I’ve decided to start bring in my GFG to work on. I will sew 5 hexs per day. Since each of my flowers are triple bloom with a full white border, that means it will take me 12 business days to complete the hex sewing of a flower. Then I’ll go ahead and start flower construction. This is about 15 minutes of sewing time per day, guaranteed.
I’d love to get one flower done per calendar month. I would just ROCK if I did that. But fat chance, that is not happening. I’d be pleased with 6 flowers this year. I have another 6 or 7 done at home. I plan on connecting using green diamonds, so my other goal this year is to have a single bloom flower of the flowers I’ve done. That should take up the rest of the time.
Tonight starts class. I’ve heard that this prof is incredibly dull, treats you like you were stupid and spends 3 evenings teaching us how to get on to the internet. I hope he knows that Vint Cerf invented the internet (he did – go google it right now). I worked at MCI when Vint did, so I know my knowledge is correct. So here’s hoping that tonight’s class is short because we are just introducing ourselves and going through the syllabus.
Sunday, January 11, 2009
The End of Freedom
So today I worked my tail off to get my fab 5 set up for the term. The Christmas BRB is still in a pile on my bedroom floor. That one will wait to be sandwiched until I have more spray baste. Watermelon Slice is sandwiched and ready to go, except I have no idea on how to quilt it or any appropriate thread. I sandwiched Patches & Pinwheels with the last of the spray baste (and pinned as well) this evening. There's a pucker ot two in the back; I just don't care. It's mean for my DD to enjoy while watching TV and playing in our basement family room. The Chiclets #1 quilt was easily basted without issue this afternoon and it's ready to go.
I do have ideas on how to quilt both the BRB and the P&P, so at least I can get started on the P&P. I need some thoughts/inspiration for the Chiclets quilt and for Watermelon Slice. For WS, I need to read what people are doing on A Pocketful of Mysteries; maybe that will insprire me.
As far as the flannel quilt goes, I took it out and assessed it. Realized that I could just plod on. Worked on it for an hour the other day. Tried to work on it again today and sewed it very very wrong. Threw it out. As I was pitching it, DH saw and asked. When I explained, he helped me. I've only thrown away 2 projects ever and both times it was so liberating. This was time #2.
So my fab 5 is now a fab 4.
Once I got all of that dne, I took out a baggie and started making some crumb blocks from the contents. I ahve had a hankering to make crumb blocks for a while and once my fab 5 were ready for teh school term, I got right to it.
New goals:
1 hour of some sort of sewing a night.
Friday, January 02, 2009
2009 resolutions
I have made some quilty New Year’s resolutions. Let’s see how this goes.
Resolutions
I resolve to update this blog at least once a week with my quilty progress. I’ve been really bad about it and I just need to be better about it. It’s just that simple.
I resolve to put pictures up on this blog. Blogs with pictures are better and that is a fact. I also just have been too lazy about learning new computer things and have relied on Ted. Well, after Ted broke BOTH PCs in December, I feel the need to be a bit more proactive.
I resolve to have 52 crafts this year of some sort or another. This is for another challenge somewhere else, but since 90+% of them will be most likely be quilty, here’s a good place to talk about them.
I resolve to bust 100 yards from stash. I work my stash inventory like the IRS – everything you’ve got, plus everything you’ve bought this year is inventory. No one told me it had to age in the stash a certain amount of time to be considered stash. If the time elapsed is 5 minutes, who cares? Makes my math easier.
I resolve to make sure my husband Ted and my DD each get quilts from me. Somehow, they always get the short end of the stick.
How To’s
I’m not sure how to accomplish all of that. I do know that when I am in grad school, I quilt a lot less, especially if I am also taking insurance exams for work. Fortunately, for all of 2009, I have decided to take only one insurance exam and it is January 28. So one crisis is solved. However, quilting during grad school still is a challenge.
I have figured out that the picking of fabrics, cutting of fabrics, piecing, and making units and subunits and blocks requires an attention to detail I do not possess during the school term. So I have decided to work a lot on UFOs. A UFO, as defined by me, is any project that has been committed in some way to cloth – from fabric and a pattern have been selected to blocks are done and anything and everything in between.
I’ve also decided that working on groups of 5 at a time seems to make sense, so I will tweak a Stashbusters idea, and have the Fabulous 5. My goal right now is to get as many of the Fab 5 to the ‘ready to be quilted’ stage. Quilting is something I can do with ease during the school term, so if I can get lots of things sandwiched and ready to quilt, life is good. I go back to class on the 12th, so I may try to get 10 or even 15 items ready to go, so that I have an inventory of quilt sandwiches to work on. I hate making the quilt sandwich, but hey, sometimes you gotta do what you gotta do. I need enough inventory to get me through to spring break in early March.
That said, here are my first Fab 5 (if no goal is stated, then it’s completion):
1. Christmas
2. Watermelon Slice – For you Dorothy Young mystery quilters on A Pocketful of Mysteries, I did her Christmas quilt for the second time and it turned out great. It was what I needed to get back in the quilty groove. I got fabrics selected, the top is made and the whole monster is sandwiched and ready to quilt. Part of my holiday quilt collection, representing June (maybe August – not sure).
3. Patches & Pinwheels – Another Bonnie Hunter pattern. When I made the pinwheels, I made 80+ spinning each way, which meant I had enough for 2 quilts. The first quilt is done and went to a silent auction. The second quilt, which will be for my family room, is in rows.
4. Flannel quilt – You know the type, flannel front and back in squares, and sewn together and snip the edges and all of that. It was abandoned long ago and it’s been unearthed. So let’s get this done and donated.
5. Chiclets #1 –The Chiclets pattern was running around Stashbusters for a while there and I started a bazillion blocks. The reason for starting them no longer exists, so I now have a bazillion finished blocks. I plan to set them 4 x 5 and use my roll of plaid fabric (my official charity backing fabric for now) to finish these off into Project Linus quilts.
Thoughts for the next Fab 5:
1. Ted’s birthday quilt
2. Chiclets #2
3. Inauguration dresser quilt (election challenge)
4.
5.
Wednesday, September 17, 2008
I'm baaaacccckkkk!!!!!!!
It appears that this summer, I went into a huge quilting funk. I finished class in early May and promptly had to have 2 teeth fixed. They were next to each other, upper back. The all the way back one had to get a gold crown and the one next to it needed a root canal and a crown. $2500 and 5 appointments later, my mouth is all better, but there went my summer. Granted, it was an area of my mouth that I have neglected for 10 years, so the fact that one tooth could be saved and neither needed to be pulled is nothing short of a minor miracle. So that killed a lot of my spirit this summer.
I got through that crisis, and then it was the last week in July, which started the Great Travel Period of Ted. He was essentially gone for 2 weeks straight, which meant it was me and DD against the world. Now, I knew this was going to happen, so we had a great time, but still, it’s all about her at that time and not about me sewing.
The second week of August (right when the Olympics opened) was our family vacation to southern California. This was 7 days of pure enjoyment and relaxation (plus 2 very frustrating days of travel). No sewing got done that week, but the rest alone was fantastic. When we arrived home, I started school 2 days later and DD started the day after me.
The past month has been all about getting into the swing of things. Getting used to being in class 2 nights a week. Getting used to second grade. Getting used to being Market Day mom and Brownie troop co-leader. It’s just been a month of getting organized.
But I have started to sew. If you look over to the right, that’s the list for the rest of this year. I’m starting to work on it. But first I had to clean up my sewing area. This took some thought and insight before I could work on it. I decided that part of the problem was that too many projects were out and making me stressed. So using the list to the list as my guide, everything else went away into a closet. And in that process, I made the closet a better place. Having a cleaner sewing area has helped immensely.
And then Cher sends me a “you’re the queen!” notice. Aw dang.
Monday, June 16, 2008
Sunday's baby steps
I cut 10 2” strips of cream and then picked out the blues to go with and got a few things sewn together.
I would hope to sew tonight, but I have part 3 of the root canal, so I will be sedated come this afternoon and that will carry me through until the morning. Tomorrow night we have swimming so maybe I can get down there to sew later on.
Ted figured out why I’ve been so tired. Work for me has really picked up and I have not had that happen in a very long time. So now I need to adapt. It’s good to at least have a reason as to why it is happening!
I’ve already listed my sewing goals, but now a mini-goal is to get the wedding quilt done before I leave for California in August.
Tuesday, June 10, 2008
The Death of the Ironing Board Cover
Then late last night, Ted reported that a soft drink from a fast food place had exploded on the ironing board. I had left my drink from Sunday’s lunch on the ironing board and the cup gave way and it leaked all over my very scorched ironing board cover. So I just rolled it up and tossed it out. Ted thought for sure the world had ended and it leaked through the pad, etc.
So now I can’t sew until I get a new pad. I’m scheduled for a Target run Friday night, so I guess things will wait until then. Or maybe I’ll just a use for a few days. But tonight contains swimming lessons for both me and DD, and then we need to pick up our farmer produce, so there went tonight!
Monday, June 09, 2008
Second Mini-Challenge
My second mini-challenge will run from now until 08/07/08, which is when we leave for vacation. The theme of this challenge is Next Steps. I need to get through the next steps of each of these quilts to feel like something is happening.
1. OC – top done
2. CC – top done
3. Batik Lover’s quilt – top done and sandwiched. I had to withdraw this one from my quilt show earlier this year because it wouldn’t come together. Now that I have gone through and cut from every milk crate, I have put all batik scraps I could find in one spot to finish off the piano key border. Also, one of the blocks in the swap was horribly made, so I will remake that one so the top looks proper.
4. Red Fence Rail – I started this one in the early 1990’s when Ted and I were dating. I have since hosted a log cabin round robin to make a log cabin red back so that this one will be reversible. The goal is to finish both tops.
5. King Center – I have made a 50” center for a scrap quilt for our bed. (We have one on the bed now, but in winter, we need more.) The goal is to sandwich and quilt this center.
6. Super Secret King Center – This is for an online friend. I need to make the 50” center, sandwich it and quilt it. The goal is to run the construction of my King center and her King center concurrently.
7. Xmas Sampler – A few years ago, I did 2 blocks of the month from 2 different stores. I made one block in Christmas fabrics of each block so that I would have 24 blocks done and then I need to make one more, set them all on point, etc. The first goal is to finish the blocks. I am more than halfway done. The second goal would be to finish the top.
Meanwhile, the following remains undone from my first mini-challenge:
Lasagna #2
Brownies Quilt
Baby Boy Quilt
P&P wedding gift
Joyful quilt
This makes 12 projects to work on in the next 7+ weeks. Plus there are a few small things I would like to do. I need some coasters for work that are thematic. I would like to make a few more dresser mats like the little red mat, which is really just making a glorified placemat. I would like to make 2 bags for swimming class, so that after we come home from swimming, the bag and all of its contents can just be dumped into the washer. Plus I need to complete 18 chiclets blocks per quarter. And I did actually make enough pinwheels to make 2 P&P, so to finish off that second one would be a nice bonus.
I am going on a 4 day retreat July 31 – Aug 3. My goal is to take all of my Christmas fabrics (a Rubbermaid tote), buy some WOW or something and make a Blue Ridge Beauty. That’s all I plan on bringing to that retreat.
My last goal of the year will be to finish these items. I will be in class at the point this challenge starts, so no thought is a good thing. God help me if Bonnie does another challenge.
Wednesday, June 04, 2008
weekend preview
Ted has been feeling better. It seems that after he hurt his ankle, the Percocet they gave him produced a ton of massive side effects which were all detrimental. So he needed another 10 days to recover from the Percocet. Now that he is well, he leaves on yet another business trip tomorrow morning. So he will be gone from early Thursday until late Sunday.
Now that I have no exam, my goal is to enjoy DD and get some stuff done. What gets done, gets done. No more, no less. Tomorrow we plan on going swimming after work/daycare and then going to La Bamba for burritos as big as our heads. Friday night I will make low key, just because that is my style. Maybe homemade milkshakes. Saturday, we plan to make homemade spinach fettuccine. Sunday we plan on going to church. Otherwise we will hang loose.
So how does all of this relate to quilting? I am nearly done with my mini-challenge. I wanted to finish 8 things and I think I will finish 4. Since this is my hobby, I will not beat myself up over this. This is actually pretty good, considering all that went on, including my root canal stuff.
So I hope to work on the 16 patches for the P&P. I also hope to finish lasagna #2. I see that the resolution to the OC has been posted by Bonnie and so of course now I am spurred to continue. I also have the next mini-challenge planned, even before this one is done. I’m such a nut.
Monday, June 02, 2008
Weekend
Friday, May 30, 2008
a finish in the chaos
UFO #3 - lasanga quilt
Stress has not abated, so I am taking some time to think through how to cope for the next 2 weeks.
Thursday, May 29, 2008
Restful Wednesday
Hopefully I can plod through and get some stuff done. This insurance exam looming over my head is making me nutso.
Wednesday, May 28, 2008
exhaustion update
Ted ended up in the ER last Monday and again yesterday on 2 unrelated items. The only benefit is that we have paid all of our deductibles, so it should all be covered 100%. For many days, I was Mom’s Taxi, running Ted and DD everywhere they needed to be.
DD also threw up one day last week, and that was a hard day. I felt bad for her.
We were to entertain family last Saturday, but cancelled that. We saw them in Chicago on Monday anyway. I did have part 2 of the root canal done as well.
I spent the weekend sewing as much as I could. UFO #3 is the lasagna quilt and I am hand stitching the binding down, so that one will be done soon. I did another bobbin of FMQ on the Jackson quilt. My crowning achievement was finishing 7 dozen pinwheels blocks, spinning in opposite directions (that would be 14 dozen total) for the P&P quilt I am making as a wedding gift.
I have no idea when I will get any time to sew in the next 4 weeks and I am not making that up. My main goal is to continue on this mini-challenge and before Q2 is done, I will report in to Cher how I’ve done. I do have an insurance examination for work on the 10th, and that is eating into my quilting time.
If I get any sewing time, my thoughts are to do a bit on the second lasagna quilt (step 1 is to sandwich and then a bobbin a night), a bobbin a night on the Jackson quilt, and then on to the 16-patches for the P&P quilt. The first 2 items take about an hour total, so we shall see how this goes.
If I end up with a stack of quilts next to my bed that only need the hand stitching of the binding down, that will be a huge achievement.
So hang in there, all. I’m exhausted.
Monday, May 19, 2008
exhaustion
Saturday I was in Chicago.
Sunday I was in Chicago.
I have done no sewing. And I’m exhausted. Ted’s in Ohio and also in the ER (now resting at the hotel).
Stay tuned.
Friday, May 16, 2008
Week 19 report and Week 20 goals
I did watch last week’s and this’ week’s Grey’s Anatomy, so that’s nice. While I did not sew a stitch, I did continue cutting. I started cutting my yellow milk crate. I also cut some WOC strips so I can start cutting blades for the pinwheel blocks for the P&P quilt. I did cut 24 pinwheels of blades and I’m still not done with blue. Such is life.
So week 19 did not have a UFO finish, and while I am bummed by that, I have to remind myself that this mini-challenge is not meant to frustrate me. I had hoped to have a quilt to bind while at my sister’s, but that did not happen. So I will bring my GFG bag with me and hope to get a flower worked on. That would still be progress, just on a different goal.
So Week 20 has the following goals:
Cut yellow milk crate
Finish first lasagna quilt to the hand sewing portion of binding
Brownie top all done
Sandwich other lasagna top
Sandwich baby boy quilt top
Cut into pink and brown milk crate
Sew all cut pinwheels
1 bobbin FMQ on the Jackson quilt
That would have me doing something on all 6 remaining UFOs in this challenge.
Tonight’s goals:
Finish cutting the yellow milk crate.
Cut all pinwheels blades out from all of the 3.5” strips I’ve cut. This would be blue, orange and yellow blades.
Square up Brownie blocks, so they are ready for their next logs.
Thursday, May 15, 2008
nothing new
Wednesday, May 14, 2008
Sleep, Precious Sleep
Then when we got home, Ted and I ate our dinner, which was ribs. And then I fell promptly asleep at 8:30 and slept all the way through. I did get up at 1:30 for an Aleve and the headache medicine and went right back down.
So no quilting, but I am well rested for sure!
Tuesday, May 13, 2008
Milk Crate Success!
I forgot I had a church meeting last night, but they are very prompt that they are only an hour long. So before the meeting I did some cutting and after the meeting I cut for hours. While I got nothing else on my list done, I did finish cutting up the blue and orange milk crate. My God, that took FOREVER.
Tonight there are no errands, but there is laundry and folding. So after those things are done, I hope to do 2 bobbins on a lasagna quilt, which will finish its quilting. I also hope to sandwich the other lasagna quilt, as I did wash the backing last night. I hope to cut 10 yardage pieces of yellow (the next milk crate) and finish framing the Brownies squares. I think that’s plenty for the evening.
Monday, May 12, 2008
Sunday update
Meanwhile, Sheri did receive her quilt and it made her day, as she has been having a less than ideal set of days. I’m glad that hit the mark.
So on to Sunday. The weather here in central IL was downright nasty. We were checking the TV at 3 am for tornado warnings, it was so bad. So we stayed in, as the advisory was for wind and you weren’t to drive unless you had to. Since I am functioning on temporary crowns right now, eating out wasn’t really high on my list, so we had lots of scrambled eggs and noodles.
I did sandwich a lasagna quilt and quilted a third of it with my very bad FMQ scribbles. I did try some more FMQ on another quilt, but stopped after the top thread broke twice. Then it was on to the quarterly quilting homework of chiclets blocks. Now I love the chiclets pattern, but all of those HSTs can be annoying. Since working on Patches & Pinwheels and the OC, I am now using my easy angle for those HSTs and it’s going much faster. I also found my WOW pile, hidden in the basement under some toys (I wonder who that could be?). So now no more chiclets blocks until July.
Then I started on the Brownies quilt, ironing off all the extra crayon wax and trimming the blocks down to the actual colored surfaces, as the girls did not fill up the whole block in most cases. Then it was framing the blocks log cabin style in 2.5” strips. I then started cutting into my blue and orange milk crate and I started with the scrap bag and not the yardage. The scrap bags take forever, so I didn’t get very far.
And then I watched 3 hours of Survivor and I had Amanda and Parvati in my pool, so I have won some cash! Yay!
Week 18 report and Week 19 goals
Goals for Week 19:
Progress, progress, progress
Each night:
Sandwich a quilt – there are 3
Quilt for one bobbin or one hour, whichever is shorter
Finish Brownies top
Attach binding to one quilt
Continue cutting blue and orange milk crate
Start cutting the yellow milk crate
There is not a lot of piecing this upcoming week, but I have a lot of weekends in the car for the next few weeks, so I am trying to quilts quilted and bindings attached for whipping down in the car or while visiting with families. 6 of the UFOs in this mini challenge were already pieced, so quilting is what needs to be done, so let’s just get to it.
I will lose one night due to dental work, so we shall see how this all goes.
Tuesday, May 06, 2008
It's Mailed!
I FINALLY got the label on Sheri’s quilt last night, while DD flitted about in the backyard, running from neighbor to neighbor playing with all the little girls. (It’s high time she made some friends!)
And then today, I got the quilt over to the FedEx-Kinko’s and mailed it out. It should arrive either tomorrow or Thursday, which is perfect, because Sheri’s birthday is Thursday. She will be 54.
The quilt is all cow fabric and hearts fabric. On the one day I call in sick in October 2006, Sheri leaves work ill and is diagnosed with congestive heart failure. She already had leaky valves and within the year before she fell it, she had lost 75 pounds and looked terrific. If she had not lost all the weight, the congestive heart failure would have killed her.
Anyway, Sheri needed some valve replacements. They told her they were going to use cow valves. She asked for one cow valve and one pig valve so she could “Moo & Oink.” It’s a Chicago reference: http://en.wikipedia.org/wiki/Moo_%26_Oink. Trust me, it’s worth clicking on the link.
The doctors did decline, and when they got inside Sheri, she only needed one valve and they were able to repair the other. Meanwhile, Sheri’s mother was not exactly sympathetic; her mother is one that has to be in the spotlight. So Sheri nearly dying and having open heart surgery (!) was not considered a big deal and her mother has no idea why Sheri is so damned whiny.
Needless to say, Sheri needed a quilt. It got lost in the move, but it’s on its way, better late than never. The Cow Quilt, pattern, Yellow Brick Road, symbolizing the road to recovery.
I did take pictures, but I have no idea how that part works. Stay tuned.
Monday, May 05, 2008
UFO #2 is done
I finished the binding on Sheri’s quilt and made the label using Printed Treasures. Tonight I will sew the label on, pack it in a box and mail it on its way!
So UFO #2 – Sheri’s quilt.
I worked on stupid Chiclets blocks and ran out of WOW. I ran to the Treadle and fixed that issue. Only other offense: 2 packs of charm squares. I buy 2 at a time for nickel quilt patterns.
I had been given a roll of 54” fabric that if it washes up OK, would be suitable for charity backs. I cut off a hunk, washed it, dried it and it appears not to have shrunken down to a handkerchief. I need to iron it and measure to it check for shrinkage. Overall though, this was a success.
UFO #3 - I’m not sure where I’m going with this. I have 3 quilts all about the same size that need to be sandwiched, and then the quilting can commence. I need to work on the Brownies quilt as well. I may sandwich one using the washed back and have it at the ready to quilt.
I need to cut the milk crate and do all of that processing, but the finance final looms on Thursday.
I did, however, find my car sticker!
Friday, May 02, 2008
Week 17 ends and 18 begins
Goal is to work on that tonight and over the weekend and get it to the Kinko’s by Monday for shipment. We should be good to go.
Week 17 finish:
Little Red Mat - 1/8
Week 18 goals:
Finish Sheri’s quilt
Process blue and orange milk crate (please note that this involves several things, as noted before)
Brownies quilt – progress
Start OC step 2
Start OC step 3
Kit step 1b for Kim
Kit step 2a for Kim
Kit step 2b for Kim
Thursday, May 01, 2008
I did get the binding on Sheri’s quilt and even started to stitch it down before class. Then after class I came home and got even more done. A whole long side is whipped down.
So tonight I have find my car sticker, but then I will continue to stitch that binding down. There is actual hope that I will make it to mail it on Saturday! Yay!
Wednesday, April 30, 2008
a finish!
I did indeed complete UFO #1 – the little red mat. It is all done and actually on display (albeit in the wrong month – it’s for February) on the little dresser. YAY! I used my large stipple stencil and FMQ’d it. There are some HUGE toe-catching stitches on it, but I have to start somewhere.
I also quilted all of Sheri’s quilt, which is a twin. I then unpinned it and snipped all the threads last night, which took me well over an hour (so of course I watched 2 tivo’d things). It needs to be trimmed and bound. I do have class tonight, and a doctor’s appointment right after work, so I may or may not get this done. If I could get it trimmed and the binding attached before class, then I can leave it next to my bed at night and work on it as I wind down each night. I want to get his one in the mail on Saturday because her birthday is on the 8th.
Monday night did leave me exhausted. I took a nap when I got home, watched some TV and then ended up going to bed. I do not know how I ended up this tired, but I went with it.
So week 17 showed the little red amt as a finish and week 18 should show Sheri’s quilt as a finish. Other items in consideration are the Hunter quilt, 2 lasagna quilts and the Jackson quilt. That’s 4 more things. That leaves one left to figure out.
Monday, April 28, 2008
Weekend update
I did plan my herb garden in little window boxes that hang over my deck. Of course, tonight is going to be like 30, so I need to bring them in tonight.
On to quilting. I worked toward my mini-goal and actually finished the red mat. Of course, it doesn’t have a label yet; I’m waiting until I have enough finished to warrant using a whole sheet of Printed Treasures. I’m loving Nann’s idea of using a label size from Avery and making the labels that way. So one finish down, and 7 to go.
I also finished the purple pinwheels, which made 25 pinwheels, which is 100 HSTs, which is 200 triangles cut with that EZ angle. I can vouch for the EZ angle. Again, these are for the P&P I’m making for a wedding gift in June.
Nothing else was outstanding from the last milk crate, so I could cross that off the list.
I did quilt Sheri’s quilt in full. Now I need to take out the safety pins, trim the threads, square it up and attach the binding so I can hand whip it down this week. This needs to be in the mail on Saturday.
I hauled some serious butt on the GFG as well. My goal was organization, which was to be to get one flower completely pinned to the hexagons and figure out from the existing partially constructed flowers what I could work on. My goal is one flower per month and 2 hours on the existing mess, so that slowly I can get some stuff done. Once I get 7 flowers all done, I will join them together. I have 3 flowers done.
So during the evening last night, I watched some Star Wars on Spike with DD, and sewed 3 hexes and folded 10 items and did that for 2 hours. All the folding got done and 18 hexes got done, so it was rather productive.
I have an entire laundry basket full of paperwork to go through, so no doubt that will be tonight’s goal. From a sewing point of view, I’m aiming to de-pin and thread trim Sheri’s quilt, do more hexes and find the backing I want to use up for the Brownies quilt. I need to measure it and then lay out the girls’ blocks and see what comes to me.
So what’s left:
Brownies quilt all done
Sheri’s quilt all done
1 bag for work quilts
18 Chiclets blocks
Friday, April 25, 2008
Mini-Challenge
So I’ve decided that I will finish (not start!!!) 7 UFO’s between now and then. They may be UFO’s or they may be WHIMM’s, but the goal is getting 7 started things done. So 7 UFO’s and the wedding quilt = 8 quilts.
OK, then 8 UFO’s between now and then.
Week 16's a bust, so on to Week 17
As usual, my quilting list for week 17 is far longer than will actually get done, but I gotta dream big!
Week 17
Brownies quilt all done
Sheri’s quilt all done
Purple pinwheels
Finish anything else from last milk crate
GFG organization
Mycala’s gift
Red dresser mat
1 bag for work quilts
18 Chiclets blocks
Please note this really doesn’t include any OC stuff. I have been doing OC stuff and cutting more and more milk crates up, but not getting through some of the items on the list. They’ve been carried forward over and over. So it’s time to work on some of that. Catching up on OC will not be hard.
Plus I have 2 birthdays coming up and I need to handle those things, as they are timely.
Tuesday, April 22, 2008
On other fronts, I have a test in one class tomorrow night and the dishwasher installation is Friday afternoon, so those are 2 things I must prepare for.
Friday, April 18, 2008
Week 16 goals
Brownies quilt
Mycala’s gift
Process blue and orange milk crate
25 4 patches OC
24 step 1 CC
24 step 2 CC
Sew up 3.5” P&P strips
Sew up 2” P&P strips into 2’s (need 4’s)
Finish red dresser mat
6 Chiclets blocks
Sheri quilt – progress
Prep 1 GFG block
OC step 2 blocks – up to 100 if possible
It’s going to be hard to get stuff done, but I continue to aim big.
Back to work – it’s crazy-busy.
Monday, April 14, 2008
Sunday report
Sunday, April 13, 2008
A great Saturday
Yesterday’s quilting went pretty well. I got as far as I could on my OC. Since I want to be scrappy, I have to wait for other milk crates to be done. So 75 4 patches are done and 75 2 patches are done.
All the 2” P&P are sewn.
20 step 1 blocks are done for the CC.
My SIL and I mis-communicated about the date for her son’s communion. It was Saturday and I had emailed her to confirm it was Sunday and she did indeed confirm it was Sunday. So now that we’ve missed it, I’m home all today too. So after I go count cash at church all morning, I can come home and sew.
Today’s goals include Sonya’s heart block, finishing the 20 step 2 blocks, finishing the red pinwheels and cutting the purple HSTs for the purple pinwheels. Next goals would be prepping the GFG hexes and the 6 Chiclets blocks.
Saturday, April 12, 2008
Successful Friday
What a good kickoff to Week 15.
I came home at like
However, I had a lot to show for it, which is great. My 2.5” strip bag is 100% full, so it will be time to start another bag. I didn’t even cut any of these – I just took them out of the scrap bags. I already sewed all the 2” strips together for the P&P, but I did not worry about making any strip sets of 4 strips or any sub cutting. The 3.5” strips are half done. I sub cut all the red strips with the WOC strips with my EZ angle. Those are for the P&P pinwheels.
Today’s goals are prepping the GFG hexes for tomorrow’s road trip, sewing all of the pinwheels together, 20 step 1 and step 2 CC blocks and some 4 patches for the OC. OMG, I will be sewing all day. The weather’s due to be crappy, so that’s OK, but I do need to do some housework and homework too.
Friday, April 11, 2008
Week 14 Wrap Up
Here’s how week 14 shook out:
Done - Go through green ziploc, take out 2.5 strips and process
Done - Kim’s GC packet – 150 2 patches (she needs small steps)
Done - Sew 150 2 patches for OC
Done - Sew up 3.5” P&P strips
Done - Sew up 2” P&P strips into 2’s (need 4’s)
Done - Sew up CC 2” strips – all steps will be involved!
In progress - Finish red dresser mat
Not started - 6 Chiclets blocks
Not started - Sheri quilt – progress
Not too shabby, despite plumbing problems and classes, which included a presentation.
Week 15 goals
Process red and purple milk crate
Cut another WOC for lights for the 3 Bonnie quilts I’m cutting for
OC 2 patches and then some 4 patches – quantity dependant on what I can get out of the milk crate
Sew up 3.5” P&P strips
Sew up 2” P&P strips into 2’s (need 4’s) – join a few to the greens already done
Sew up CC 2” strips – working on steps 1 and 2, which will make the ring block, which is step 6
Finish red dresser mat
6 Chiclets blocks
Sheri quilt – progress
Heart block for Sonya
Prep 1 GFG block
Sew all colored hexes for GFG
These are some seriously aggressive goals, considering that Sunday I have to count cash at church (8am until noon) and then hop in the car to Chicago for a family thing at 2. If I get all the GFG stuff prepped, I could actually get that whole thing done in the car going back and forth. We shall see.
Thursday, April 10, 2008
A little bit here, a little bit there
I’m thinking of practicing my stippling on it. I bought a large stipple template a few months ago and the pounce with chalk, so I may whip all that out to try it out. My free motion quilting is awful, but hey, you gotta start somewhere.
Tonight class was moved up from 8-10 to 6-8. We also have to give the aforementioned presentation, which is not fun, but it won’t be too bad and it will be over. The only other obligation for this class will be the final. However when I get home, I need to do group work for my other class that must be submitted by midnight. I have no idea if I will get to sew at all.
Wednesday, April 09, 2008
Plumbing Problems
On a related note, we are trying to plan a large vacation and I have extensive dental work planned and now this. The Lord provides; the Discover Card people raised our limit by $2000 last week. While I don’t like to use credit, I am OK with it for these types of things. I have a hard time planning for the vacation without having all the money in hand right now to pay for all the pieces.
And on top of this all, I got either a migraine or a sinus headache last night. No sewing got done, but nothing else was urgent, so I was a slug and was OK with it.
Tuesday, April 08, 2008
Tupperware
Goal for tonight is to clean up my house. It’s in pretty good shape, so it should be a quick tidy. Laundry, folding and then some sewing.
Monday, April 07, 2008
Successful Sunday
I did go through the green Ziploc of scraps and half the bag was 2.5" strips, 2" strips or bindings. So I put all of those things in their home, leaving just the scraps.
I also handled all the 3.5" strips that I cut for the Patches and Pinwheels (P&P). I ran out of cut lights, so the remaining green strips were put into a newly created 3.5" strips Ziploc. Overall, I made 11 A pinwheels and 12 B pinwheels (they spin different ways) in green. That’s like nearly 100 HSTs.
I did also sew the 2" strips together greens and lights for P&P.
I unsewed the bad row on the little red mat and resewed it. So now it’s a teeny topper that needs some borders, etc.
Kim’s kit is ready, except for instructions.
Tomorrow’s goal will be to get Kim’s pack ready for mailing, and the 6 Chiclets. Bonus would be to start to finish the Sheri quilt. I do have a Tupperware party to attend.
Saturday, April 05, 2008
Saturday night news flash
A quick Saturday night update:
I did get the 150 2 patches done for my OC. I also sewed as much as I could on the CC with the milk crate strips I had cut. I netted 16 step 1 blocks and 16 step 2 blocks, plus more pieces for variety later on. I also cut 70 of the 150 dark squares needed for Kim’s GC 150 2 patches. So I got a lot done.
Tomorrow’s goal is the green Ziploc and its processing, finishing Kim’s kit so I can mail it to her and maybe the 3.5” strips for the Patches and Pinwheels. Those are all EZ angle units, so lots of cutting and sewing into HSTs and then into pinwheels.
Friday, April 04, 2008
Week 14 and Crushing
I have all my small yardage stash in milk crates by color under my sewing table. I pulled out a crate and got to work. I did greens and a few reds. I only picked really dark values. I cut a 3.5, a 1.5 and 3 2 inchers. One 2 incher went into the GC pile, and another into the OC pile. The 3 other strips all went into their own piles for the other quilts. I then went into the green scrap Ziploc (those really tiny pieces) and busted some stash there too. The only modification I’m making to this milk crate cutting system is to remove all 2.5 strip pieces from the Ziplocs and handle them. I had started cutting for a Boxy Stars, so I can just continue with that.
I also cut up some COC for the P&P and the CC and added them to their respective strip piles. And I did find some solid white, so I cut that up for the OC for now. The whole process only netted 3 strings, which is nice.
I’m so glad someone mentioned cutting the WOF strips in half! I get more variety, but more importantly, stuff is just way less wonky. I cut the white strips in half and started sewing some greens to them for my 4 patches. I didn’t get very far, being tired, but I did cut for an hour.
So this week’s sewing goals (it’s week 14) are:
Go through green ziploc, take out 2.5 strips and process
6 Chiclets blocks
Kim’s GC packet – 150 2 patches (she needs small steps)
Sew 150 2 patches for OC
Sew up 3.5” P&P strips
Sew up 2” P&P strips into 2’s (need 4’s)
Sew up CC 2” strips – all steps will be involved!
Finish red dresser mat
Sheri quilt - progress
It’s a lot to do, but with the sewing area clean, it makes it far more enjoyable to be down there. I will be sewing hard and doing homework hard, as best as I can tell.
Wednesday, April 02, 2008
Does this count?
So I stopped worrying about cutting up scraps and just cleaned everything up. Some of it was not so elegant (shove pieces-parts of projects into a really big banker’s box so that least the nuttiness is together), but all the surfaces are clean and dusted. I can start anew.
I am also very excited to read that it will be a full 2 weeks before another clue is posted. I’m nowhere near ready to start sewing, plus I need to cut Kim’s out at the same time. Plus I have 2 tests and one presentation in the next 3 weeks from today, so I pace myself. Grad school continues to kick my butt, but there are only 6 more weeks and then 14 glorious weeks of summertime.
But at least I can set foot in my sewing area again!
Friday, March 28, 2008
Crushing
I’ve been attempting to cut scraps for a while now, but grad school is getting in the way. I have been cutting for the CC, the OC and Boxy Stars (I like Bonnie quilts – can’t you tell?!?!?). I am definitely using a bright pink batik for the main color (the red) in the CC, so I can’t make a Strawberry Crush. I’m liking the idea of a Orange Crush, as Nancy Mac in IL has reminded us all that U of I’s student cheering section is the Orange Crush (it’s also the name of the Palumbo company after the trouble settled, for those of you in Chicago who know that the Earth Moves with Palumbo). I was planning to send mystery packs to my sister Kim for CC, but I’m thinking she needs a Grape Crush, as she is a huge purple person. So…
My CC colors are scrappy, light creams and pink batik.
My OC colors are orange, purple, red and blue for the accent (just like Bonnie, but purple for black). White will be my light. (Can’t be a dreamsicle with cream….)
Kim’s OC colors should be purple, red, green and yellow for the accent. White will be her light.
I have not had time to shop the stash. Ted is traveling next week, so I am trying to get as much homework done as possible while he’s around to attend to DD, so that when he’s gone, DD and I can hang out. I will be sewing (more like cutting) and she will be doing whatever 7 year olds do!
I hope to shop the stash tonight. I am fairly certain that any orange that I may have it not a lot and not to my liking. I mean, I like it, but it’s from Becky, and I don’t love it, in the OMG I must buy that love it sense. I hope I have enough purple. So overall, I’m thinking of some Moda marbles for the purple and the orange. The rest should be scraps.
So bring on April 1!
Monday, March 24, 2008
sleeping bag
The prevailing size was 7 feet by 7 feet, folded over like a taco. That seems simple enough to make. If they are 12” squares, then it would be 49 squares. I may just make a quilt for both sides to bust more stash and try some new techniques. (Like I need a new project…)
One website I found had some really cool handles. It ties it up like a duffle and then also gives the cross handle to allow you to carry it. Now that sounds like a plan.
Now on to materials. I’m thinking Thinsulate for the batting. Or Thinsulate with Warm and Natural to get some loft. Please have suggested flannel for the squares (or at least the lining that touches your body), but I don’t have any in my stash. I will need a really big zipper. I know you can do them without the zip, but I would prefer the zip. Www.seattlefabrics.com seems to have a lot of good stuff.
So now it’s a matter of getting to it. The first overnight thing we have is this coming weekend and it’s for about 16 hours (whatever) and we are in cabins or bunkhouses or something because she is only a Brownie. We’ll see how that goes. She’s already decided we should put the ugly quilt down as a mattress and then sleep on top of that. Sounds like a plan.
low key weekend
It really just has come down to class being in the way. I had class Wed and Thurs night, so those 2 days were shot. Friday I did go into the basement and cut up some more scraps and make sense of more of my cutting table, but it’s never enough!
Saturday was spent cleaning house. Ugh, a nasty task, but someone has to do it, along with homework. Yesterday was also spent cleaning and doing homework, but I did spend like 45 minutes making hourglass blocks from a baggie of HSTs that I found. My goal is a table topper for a really smaller dresser that we have (14” x 20” for the top).
Tonight is the ISU game in the NIT and then tomorrow I can hopefully continue on the sewing path.
Wednesday, March 19, 2008
I did go into my basement yesterday and spent 15 minutes cleaning up. Now, DH had recently gone through and reconfigured the basement and it looks very nice, EXCEPT for my pit of a sewing area. So all kinds of crap got piled up on my cutting table, including all of the paperwork my DH brings home from work but doesn’t know what to do with. ARGH!
So I cleaned up the edge of my cutting table, throwing away selvedges and putting scraps in a pile on my ironing board. After 15 minutes of that, I started to cut up the scraps on the ironing board, using a really small cutting board and ruler. I cut some 1.5 squares and 1.5 x 3.5 bricks for CC, and some appropriate things for Boxy Stars and some 2.5 squares for that box (eventual goal: cathedral windows quilt) and some 2” strips for the new mystery.
I cut for like 30 minutes and I only got through half of my teeny pile. Man!
I hope to continue chipping away at it. I didn’t get to make foundations for string blocks nor prep my machine area, nor did I work on Sheri’s quilt. But I did get a lot done on my group work for class, so that has to count for something.
Tuesday, March 18, 2008
Nothing Much
I have a group meeting right after work today, so that will get lots of homework accomplished. I do have some marketing homework to do as well.
But most importantly, tonight I hope to go downstairs and spend 15 minutes picking up, 15 minutes cutting, and preparing to make string blocks (cut foundations, get area set up, load scrap thread into bobbins, etc.).
The other goal is to prep the Sheri quilt for quilting. I hope to hit that tonight as well.
Monday, March 17, 2008
Week 10 wrap-up / National Quilting Day update
I did finish my Bargello Bowl quilt. It turned out to be 58 x 70 and it was just darling. I made it for the fundraiser organized by my co-worker. Their goal was $10k and they raised $20k, so it was a huge success! And that was my National Quilting Day.
No other sewing to speak of.
Week 11 goals:
10 string blocks
3 bags for the quilts at work.
It’s not much, but I need to get some serious study time in as well.
Thursday, March 13, 2008
I did finish the bargello top and also got the whole thing sandwiches Tuesday night. I tried a new method of sandwiching; I put the top on the batting, trimmed the batting down to a reasonable amount all around and then added the backing to the sandwich. This seemed to work much better, as I already knew the top was smooth and fit the batting. So then the only goal when I turned the sandwich over was to cover all the batting with backing and smooth it out. Don’t ask me why, but it worked.
So last night’s goal was to quilt the thing. I only plan on doing diagonal lines every other square, but I only got 5 lines sewn before I had to go back and lie down. It was truly horrible. I hope to quilt like mad tonight and get the binding on, and then if I am certain I can finish up Friday night, I will email my co-worker tomorrow and ask her where I can drop off the donation item Saturday morning. It turned out really cute. It is truly a pattern that is as easy as Bonnie says and it’s one you can do during the work week if you’re diligent. So I’ll definitely be cutting some 2.5 strips too, if I ever get to cutting!
OK, back to work…
Tuesday, March 11, 2008
Bargello Progress - Monday Night
So tonight’s goal becomes the last downhill panel, assembly of the top, including borders and sandwiching the quilt. I would like to quilt it tomorrow night and then just have the binding to do on Thursday. If I’m really industrious tonight, I may start the quilting process. I’m thinking of just doing simple diagonal lines every other strip and extending it through the borders. I’m marketing this one as a TV time quilt for the auction. Here’s hoping I make it.
I really like this pattern; it grew on me over time. I think I will cut some 2.5 strips and start keeping them handy. I would like to make one where the color placement of the strips is all the same and then I’d like to just make one that’s huge but all random all over. So maybe I’ll add that to the cutting list, which of course, I should start executing!
Monday, March 10, 2008
bargello progress...
Anyway, Bonnie just revealed the start of what to cut for the April mystery. Now it seems stupid to start the April mystery while I’m not even really going on the CC mystery, but hey. So I have revised my cutting goals:
100 – 1.5 squares
100 – 1.5 x 3.5 strips
50 sets – 2.5 squares and 2.5 x 4.5 bricks (2.5 x 7)
50 sets – 2.5 x 4.5 bricks and 2.5 x 6.5 bricks (2.5 x 11)
2 inch strips
3.5 strips
On other fronts, I went down to my sewing room last night at like 9 and started to sew on the bargello. If I want to give it to my co-worker for the fundraiser, I need to give it to her Friday morning and time’s a-wasting, so I got the other 3 strip sets done. So now I have all 4 strip sets done. Tonight’s goal is to make the 2 uphill and the 2 downhill panels, all around having to go to a church meeting and also around handling some other stuff.
Then tomorrow I can finish the top and make the sandwich. Wednesday I can quilt it simply and Thursday I can bind it. If I can do this, it will make my day!
Friday, March 07, 2008
Scraps scraps
Let’s see, we need 3.5 x 1.5 for CC as well as a ton of 1.5 squares. No more than 100 of each color.
Then I really should have on hand some quilts to give away. I have a girl one ready and the boy one is a flimsy, so that’s covered. I think a few lap ones and a few full ones would be good.
I like the idea of a Sudoku quilt and I know my MIL would like a quilt from me, but I’m pretty sure my scraps will not yield me 9 squares per fabric in the size I need. So there went that idea. I also really like the bargello, but I would love to do them where the strips are the same in each panel. Alas, that will be a stash cutting item, not a scrap one.
I really like Bonnie’s Boxy Stars, so maybe I should just cut a bunch of 2.5 strips. Since the rectangles are really pretty small (2.5 square and 2.5 x 4.5 rectangle), I think I could get a fair amount of them out of the scrap bag.
So let’s try that.
100 – 1.5 squares
100 – 1.5 x 3.5 bricks
100 pairs of 2.5 squares and 2.5 x 4.5 bricks
Week 10 goals
Anyway, as I am pretty much mentally (from getting ready for this quilt show) and physically (from the influenza) exhausted, I decided to rethink my approach for getting things done. I’m reaching the point that the weekly to-do list is too stressful and thus nothing is getting done. I also feel that I need to clean out my studio area and only leave one project out at a time, less I get distracted. And then Stashbusters has been discussing some rotation methods on how people get stuff done.
So I percolated all of that for a while, and I’ve decided that I will just start at the top of the QBW list over to the right and work on one item each week and then move on. The first item that needs to be done are some bags for quilts at work. Right now I have them rollup and sitting on my desk, but I’d like them with some sort of protective sleeve on there. Those will be a nice easy finish.
I have decided to put away the Batik Lover’s quilt for the remainder of this school term. I just need a break. It’s a lot of tedious pieces and one of the blocks that was swapped is frankly just wrong compared to what it should have been, so I will redo that one. I just need a break from that quilt.
So I think I will do an item on the list, and then do 10 string blocks. The only real ‘deadline’ that I have is to complete a Bargello Bowl for a fundraiser at work. So this weekend I might clean for 15, sew a panel, clean for 15, cut tubes, etc. The room needs to be tidied and I want to finish this quilt, so this very well may work out just fine.
So that is the new strategy I think. Let’s see how that goes for a while. I really need some finishes and I really need no deadlines.
I did have to dump out my entire blue scrap bag onto my cutting table (for various and sundry reasons). I didn’t repack it; I left it there, figuring I would do some serious cutting of the scraps. I need to cut in earnest for the Carolina Crossroads quilt and I need to think of some other shapes that I need and what quilts I would like in my inventory to just have on hand. Hmmm….
Week 9 wrap up report
We will hang the entire show tonight. I'm doing my 2 volunteer hours tonight, as I have to drop off anyway. The influenza still is around, in the form of fatigue. I did get a hotel room for tonight so I don't even attempt the really long drive home. I did schedule breakfast with a girlfriend for Saturday morning and then I'll drive home.
Thursday, March 06, 2008
The crayon quilt needs about 4.5 hours more work and I need to leave for Crest Hill at like 4 tomorrow, so there’s a lot of quilting to be done. I’m not really thrilled with how the quilt turned out, but oh well. But I should make it and it will be OK.
The Dad quilt is already done, but not prepped for the show. That’s another hour of my life.
So home I go to sew before class.
Thursday, February 28, 2008
Week 9 Goals and Ramblings
Week 9 Goals:
Crayon quilt done (except for handsewing on back)
Batik Lover’s done (except for extra quilting DH wants)
Friday goal:
All crayons done. 4 are quilted and 5 are not there yet. I need to get the other 4 quilted, cut all crayons to the same size, attach binding to the bottom of each crayon and to the tips of each crayon. I then need to hand sew down these binding pieces. Then I need to add binding down the side of each crayon as single fold binding. Then I need to sew the crayons together, using that long binding. And then hand sew those bindings down (which will most likely happen after the show).
Other stuff:
The Batik Lover’s quilt needs to have the top pieced (halfway done), sandwiched and quilted. I want to see from DH what he wants and do about half of it before adding the binding. I can have it half quilted to his desire in order to hang it in the show.
So overall, my main weekend goal is to have everything together and need handwork. Anything else is gravy. As it is, this is gonna be hard.
Week 8 Report
All crayons quilted.
All crayons cut.
Batik Lover’s sandwiched.
After that, I really need to think about which way to go next.
And what I got done…
Orange crayon and black crayon. Not enough, but better than nothing.
My week ended this morning, as my week always begins when my work week ends, and I’ve taken tomorrow off. May I get a lot done tomorrow. DD wants to stay home with me instead of going to daycare, which is fine IF she understands that I have to put the pedal to the metal and get ‘r done.
Wednesday, February 27, 2008
Tuesday night
I did take Friday off, but of course, I'm done being queen on Friday at 6am. Go figure!
Tuesday, February 26, 2008
I don't wanna be queen
I didn’t quilt last night, but I did work on my paper and I am also in receipt of 219 boxes of Girl Scout cookies. Oy.
Monday, February 25, 2008
week 8
However, the quilt show is in less than 2 weeks. I have got to get me rear in gear to get the 2 quilts I am hanging done. So I did actually quilt some this weekend – I worked on crayons.
So as of right now:
Brown – sandwiched
Red – piecing
Orange – quilting
Yellow – done
Green – sandwiched
Blue – piecing
Purple – done
Black – sandwiched
As for the Batik Lover’s, the top and bottom piano key borders are done and the side are half-pieced. The 2 bottom rows are pieced together.
Goals for this week:
All crayons quilted.
All crayons cut.
Batik Lover’s sandwiched.
After that, I really need to think about which way to go next.
Wednesday, February 20, 2008
The good news is that I quilted for about 25 minutes yesterday. I did complete the purple braid quilting. I also started to finish the orange braid quilting, but the bobbin ran out and the bobbin winder is 2 floors below this machine. I did not sew on the black or red braids, nor did I unpick anything.
Tonight I have one test. The goal would be to finish the orange braid, sew 10 on black and red and unpick the brown braid. Slowly but surely, I will get there.
Tuesday, February 19, 2008
an actual quilty update
I did take some time on Sunday at sew on the purple crayon. Each crayon has 3 steps: the braid, the sandwiching and the quilting (on each braid). The yellow crayon is all done. The orange one still needs some quilting, as I ran out of thread and have since bought more. The purple crayon needed to be quilted, and as of right now is ¾ of the way done.
The other 5 crayons suffer from the fatal design flaw and all need to be fixed, rebraided (can we all say ‘y-seams’?) and then have steps 2 and 3 done. My goal this weekend, and it’s been weeks since I had any quilting goals, is to get this stupid crayon quilt done. I work only until 1 on Friday, so that gives me Friday night. Saturday we need to go to Chicago, but I should be able to get something done that night. Sunday is DD’s kid party, but that is not at my house, so I am hoping that I can get more done Sunday night.
Mini-goal: finish purple crayon and orange crayon tonight. Sew 10 strips on the black braid and on the red braid. Unpick brown braid.
Let’s see how this goes. Recovering from this flu is like recovering from mono.
Saturday, February 16, 2008
a-ha!
I postponed DD's birthday party for today until March 1. Currently Ted is taking her to the mall and we will head out for an early supper at Chili's. I am just exhausted. I try to study for 15 minutes and do light housework for 15 minutes. I did that for 5 hours yesterday and then I picked up the living room of toys during the news hour at 5. By 7:30 last night I was in bed and promptly slept 12 hours.
So now it is all about pacing. I need to get through these tests this upcoming week, so that is my number 1 concern. I did allow myself to start on the bargello when last I sewed and I did get one panel sewn together, so now it needs pressing and cutting and all of that. The pain in my hands is unbelievable from the flu, so I may just progress on anything that doesn't require precision cutting. I can get pretty far I think.
So it's all about pacing and regaining strength. I think I can make all of my deadlines if I just take one bite at a time.
Friday, February 08, 2008
hiding out...and thinking too much
I have not been able to sew. Last weekend I took the time to sew some Valentine’s postcards that were on a panel from last year. That was fun and fast. So that busted an infinitesimal amount of stash and nearly a whole spool of deep red thread. It was nice to do something new.
My sewing funk comes from the idea that I absolutely must finish 1 table runner and 2 quilts for the quilt show in a month. Yes, I know, people work better under a deadline and I am no exception, but since I’ve decided to get UFOs done, starting with those, I’ve been in a funk. And I’ve had to stop myself from full-blown launching into the New Year’s Sudoku quilt challenge, Carolina Crossroads in full force, SITP and the Bargello bowl. 4 items that would have turned into UFOs because another 4 cool ideas would have come along to start. At least I know the source of my madness.
Another question that is coming up in my mind is if I make all these quilts, then where to they all go? Yes I can give them away, but I like these patterns and frankly would like to keep them. But for what? Where? Why? This is moving me deeper into the funk.
Meanwhile I have the family DD birthday party on the 16th (have to clean), 3 exams in 2 days on the 20th and 21st, and then the kid party on the 24th (at the place, not at my house). And Ted is traveling for 5 of those 16 days. My stress is stressed just thinking of everything that needs to be done.
So in order to cope, I have to get a lot of studying done, but besides that, I’ve decided that I will work to certain defined points on the 2 quilts, try to accomplish the table runner, do one or two bobbins’ worth of FMQ on an older UFO (a Bonnie My Blue Heaven) and I can start the bargello. I actually cut an entire 2 gallon Ziploc of 2.5 strips when I was doing the cutting for the Dad quilt. I cut a 5” WOF piece, cut 2 nickels for the bin, 1 nickel for a disappearing 9-patch (a UFO, sadly), pieces for the Dad quilt (a Bonnie Backroads to OK) and then took the rest and cut it lengthwise into 2.5” strips and said hey here we go. I know that there are over 128 different fabs in that bag.
My thought process involved a girl here at work. I have had the pleasure of working with her because I took on a task for the time being at the request of management. She is trying to get pregnant and is having a medical hard time. Since I have had all the troubles I have had, I can relate. So I went by her cube today for some work related thing and she has a sign posted for a benefit (needing silent auction items!!!) for a little boy that is ill. Her DH is a cop and one of the parents of this little boy is a cop or a firefighter or some other civil servant. So I figured I would donate the bargello to the silent auction and the My Blue Heaven to the boy. This way I get to work on new stuff, it doesn’t become another UFO, an old UFO gets finished and put to good use, I and the 3 things I need to get done for the show will see some progress.
How I will manage quilting, cleaning and studying is something I haven’t figured out yet. Work hard, play hard I guess.
Sunday, February 03, 2008
Postcards
I also finished my Easter egg coasters this morning. The 2 big table topper eggs are also done, so that is a huge thing off my list.
We did go out yesterday and buy the back for the batik lover's quilt. The top has half the rows done and half of the piano key border done. I'd sew today, but no, I have to volunteer for soccer registration (why on the Superbowl?!?!?) and then head to a party. So no more sewing for me.
Saturday, February 02, 2008
SNOW DAY!
Today we need to run to Morton to get the back for the batik lover's quilt. It's for DH and so he has to pick the back. I'm hanging this quilt in a show in March, so I need to shake a leg on it. It is turning out beautiful. DH just loves batiks, and it was a guild swap last year for the blocks, so it seemed like a perfect fit. Of course, there's nothing like waiting until the last minute to get it done!