Monday, February 20, 2012

Current Status

OK, it’s been a few weeks since I posted and I need to catch up on things. So I’m aiming for one post per day until I get reasonably caught up.

February quilting is not going in any way like I had planned and that is fine! I’ve been working a lot on the homework things. For example, I did get 12 Chiclets blocks done, plus I did the centers for the 12 I am behind. I did get 6 Old Navy t-shirts done. I also completed the top on 11b Australia fabrics, and pieced the backing.

I actually went ahead and ordered the sweatshirt for 1c the Seaside Rose sweatshirt. Last night I cut it apart and made the center front cut. I also started putting fabric down on the jacket. I decided somewhere during the month that this UFO would actually be the easiest to complete, so I went ahead and decided to work on it.

So where do I stand with 9 days left in the month? Pretty good. I know I overplan, but that’s OK. It gives me the variety I crave and the ability to get some things done. I haven’t planned all the way through the month-end, but I have planned for this week. Tonight’s goal is to finish one half of 1c Seaside Rose sweatshirt’s body and to sandwich the 11b Australia fabrics quilt. Then Tuesday through Thursday are finishing the sweatshirt pieces and quilting the quilt. Friday is assembly and binding attachment night for both items. I haven’t done a set-in sleeve in quite a while, so this should be interesting. If I make to this point, both UFOs will only have handwork left, and that is for Tivo time!

The other things I know I want to work on are the 8 QAYG blocks, Orca Bay and 1b Christmas 2 BOM. I envision that 1b Christmas 2 BOM is the UFO I will carry into March. At any rate, it seems like I am on pace to complete 2 UFOs this month, and that is good.

Friday, February 03, 2012

2012 UFOs - February is #1 - plan of attack

So February is UFO #1. Yummy! Here’s what’s in box # 1 .

Box 1

1a Thimbles BOM – A BOM, with an extra block made so I can set on point. Civil War fabrics. Status: Blocks completed.
1b Christmas 2 BOM – I took the instructions for 2 different BOMs I was in and made another block in Christmas fabrics. I need to make the 25th block and set them on point. Status: Most blocks completed.
1c Seaside Rose Sweatshirt – A jacket covered in the Seaside Rose line, with the jacket coming from a sweatshirt. Status: In pieces.
1d Red Strings – Red string blocks and die-cut hearts come together for a cuddle quilt. Status: In pieces.

For 1a, Thimbles is the name of the shop where the BOM came from. I love this BOM. Love. Covet. This one is mine. So this is the one that I will finish this month.

For 1b, I will work on getting it to a flimsy.

For 1c, I don’t plan on doing anything.

For 1d, I’ll take it out and let it percolate. If nothing happens, it’s OK.

Homework:

8 QAYG blocks
12 Chiclets blocks
4 Old Navy shirts

Bonus UFOs

A quarter section of Orca Bay
Completed top for Jeanne’s Diamonds

Catch-Up – now I am behind in my goals (stupid diverticulitis!), but here’s how I can catch up. I can do all or nothing or just one or two.

For the 12 Chiclets blocks, I can get all the centers done for the 12 I missed.
For the 4 Old Navy shirts, I can just do some extra this month.
For Orca Bay , I can get another quarter section together as a flimsy, so to speak.
For Jeanne’s Diamonds, I can finish it.
For 11b, I can get it to a flimsy.

I know I am trying for 2 UFOs a month and in some months I need to complete 3. Right now, I will get 1a done. If I could get any of the following also done that would be good. Two of them would be great. In contention: 1b, Jeanne’s Diamonds, 11b.

Let’s see where this goes….

Friday, January 27, 2012

quick update

A quick update as we head into the last weekend of the month….

I was attacked by diverticulitis this week. It was really bad. Bad bad bad. So that seriously cramped my productivity. However, somehow, some way, I was able to finish quilting all the white thread items on 5d Watermelon Slice. This did make my day. I did handle it about 15 minutes at a time with 45 minutes of rest in between each session, and I did this over 3 or 4 days. But I got them all done, and the machine is now rethreaded for the pink rectangles. Since I’m not 100% yet, I plan on doing 15 minutes at a time for them as well, and should finish with ease this weekend. Since the binding is already on the quilt, I did take some time as well whilst being infirmed and worked on that as well. I would say it’s 40% stitched down. Overall, the goal is to complete the quilt this weekend. This is completely do-able and I’m so happy to have a finish of this size! It has been a long time!

As far as everything else goes, I’m going to clean up my basement sewing space and pack up the rest of January. While I didn’t hit every goal, I got a lot farther than if I hadn’t made any goals at all. So I’m judging the month (in advance) as a success. I’ll still make 5b out as a leader-ender project and get that cut up and prepped and next to my machine while I clean up my space. While I’ve occupied my kitchen table for quilting this big quilt, the mess that is sewing has taken over my main floor, so while I finish 5d Watermelon Slice, I will clean up the downstairs space and prepare it for the machine to return. Then once the machine is returned, I will clean up the main floor as if no sewing went on. It was an experiment and a very successful one, so I will do it again as needed.

Here’s hoping for a restful and productive weekend.

Monday, January 23, 2012

2012 UFOs - January is #5 - week 3 wrap up

Week 3 of the month. What can I say? 10 days with no post - sorry

I went ahead and occupied my kitchen table. I did start quilting 5d Watermelon Slice, which I am declaring as the #5 UFO for Judy’s challenge. I want to quilt the top in 3 different colors of thread – green, white and fuchsia. The green is all done and was by far the largest amount of quilting needed. Since it also included the borders, I went ahead and trimmed the quilt down, thus removing a foot of bulk on each side, and added the binding. Only 100 inches of the binding was made, so I had to make more first – grrr. But now since the binding is on, I can sew binding down during the 10pm news, which isn’t all bad. My goal is to finish by this weekend and since I am #12 on the list, I best hurry.

I did go ahead and sort out all of the Old Navy shirts. I washed them and started cutting. Cutting is a more arduous task than I thought, as I am cutting the rest of the shirts into strips for a crochet project. (Yes, I’m nuts.) So with about 8 or 9 days to go, this is where I hope I end up.

5a Remains untouched and that’s OK.
5b I had hoped to finish this one, but it’s not going to happen. I plan on leaving it out as a leader-ender project.
5c I wanted all blocks done, but about half will be. That’s still better than where we were.
5d Done done.

The 8 QAYG string blocks are done.
The 12 Chiclet blocks are started but will not be done.
The 4 Old Navy shirts will be cut and have interfacing on them.

I have 1 little row and one star row done on Orca Bay . I will not be as far as I want to be.
I have not done anything more on Jeanne’s Diamonds.

I did finish the Anita’s Arrowhead baby quilt for my husband’s co-worker. That used up 3.06 yards of stash.

New totals: 3.60 yards used. 0 for UFOs. 3.60 yards YTD.

Friday, January 13, 2012

January Week 2 weekday update

My week 2 goals are kind of going by the wayside, once I figured out what I wanted to do on each project for the month. It really doesn’t matter, as long as I get all of it done. At least that’s what I’m telling myself.

So far during the week, I haven’t actually done too much sewing. Monday involved a Girl Scout meeting. We did a tremendous amount of cleaning on Tuesday, which at least puts me in the right mind to sew in peace. Wednesday just sort of slipped away from me; I didn’t sew. But I did do some fabric searching, and that was involved, as our basement is a complete and utter wreck. After the fabric quest was complete, I was done for the night.

Yesterday I left work early for a snow day and I did get some sewing in. What I did accomplish was pretty good. I had found a lot of parts of things from my UFO list for the year, so I got those all filed into the 6 UFO boxes. I also moved the 6 UFO boxes out of my front entrance and into my sewing room and into their location under my sewing table. I also pulled fabrics to make more Bricks and Stepping Stones blocks, part of UFO 5c. So while I put stuff away, I actually took out more.

On to the sewing. I completed 8 Anita’s Arrowhead blocks, making my count 19. I need 25 to make the quilt 45” and not needing a border. I laid out the 5d UFO entitled Watermelon Slice and stared at it for a long while. I have a quilting plan in my mind, and even better yet, a timetable to complete it. I went through what blocks were done for the 5c UFO, and regrouped by color. I need 120 blocks, which is essentially 10 blocks per color from last year’s monochromatic challenge. Since I want all the blocks done this month, I need to do about 40 per week. So 10 were done (yellow). I completed red and blue last night. I need 10 more for this week, but since it is out and since all the fabric has been pulled to complete this, I may just persevere onwards until all 120 blocks are done. I am using them as leaders and enders for the Anita’s Arrowhead blocks, which I make 4 at a time. I also found a backing for the 5b UFO.

So with all of this being said, my weekend goals are as follows:
Finish Anita’s Arrowhead
1/3 of the quilting on 5d Watermelon Slice
Finish all the blocks on 5c and put all that fabric away

I will feel better when the area is tidy again.

Monday, January 09, 2012

Week 2 goals

Week 2 goals:

5a Nothing. And this will remain this way all month.
5b Get as far on the top as possible. Goal is to finish this month.
5c Do 3 sets of 10. Colors are red, orange and green. Goal is to finish all blocks this month.
5d Pull it out of the closet and study it. Goal is to finish this month.

Make the 12 centers, which are 16-patches, for the Chiclets blocks.
Nothing on the shirts.

Assemble the next 2 rows for Orca Bay . Attach them to the 2 rows already done. Goal is to quilt first section this month.
Finish all the borders for Jeanne’s Diamonds. Goal is to have sandwiched this month.

I have started a baby quilt for a co-worker of DH. I am doing Anita’s Arrowhead and I have 11 blocks made and need at least 20; 25 would be better. My goal is to get as far as possible on this one this week. Goal is to finish this one this month.

Week 1 recap

Week 1 wrap up:

Goals:

5a Nothing.
5b I think I know what I want to do. So I will pull everything together and let it sit there for a while and let it percolate.
5c I want to make 60 black and white 4 patches and look up the colors that were 7-12.
5d Pull it out of the closet and study it. Start quilting on it and be ¼ of the way done with the quilting.

Complete the 8 string QAYG blocks.
Cut 2.5” strips for Chiclets blocks. I have a bunch of fabric lying around and so while I put it all away, I’ll just cut a strip from each one.
Nothing on the Old Navy shirts.

For Orca Bay , I will assemble a little row and a star row. I’m starting at the bottom.
For Jeanne’s Diamonds, I will put the rows together, which will leave me with a completed top without borders.

Additionally I made a mini of Jeanne’s Diamonds and that is sandwiched.

Progress:

5a Same.
5b Going with Streak of Sunshine.
5c Made 60 4-patches and looked up all the colors.
5d Nothing. Boo.

The 8 QAYG string blocks are done.
Strips were cut for the Chiclets blocks.
Nothing was done on the shirts.

I did assemble 2 rows for Orca Bay .
I did assemble the center of the top for Jeanne’s Diamonds.

I did finish the mini Jeanne’s Diamonds. 0.53 yards used in mini. 0 for UFOs. 0.53 total YTD.

Friday, January 06, 2012

Mid-week Update

This is what I got done on Wednesday, while recovering from a migraine...

5b I took the fabrics out of the box and realized that there are 7 of them and they are at least FQ size if not bigger. I’ve decided to do Bonnie’s Streak of Sunshine with them in as large of a size as the fabrics will permit.

5c I found the list of 2011 colors from Judy. I then took some inventory of what I had done. And I made 20 4-patches.

I started to sew a string block to use up a spool that was just about done.

I did sew together one little row and one star row for Orca Bay .

I did assemble the blocks for Jeanne’s Diamonds.

This is what I got done last night...

I cut a whole bunch of strips for the Chiclets blocks. And then collapsed for the exhaustion of a 2 day migraine.

I'm out of pocket Friday afternoon to Saturday night, so here's hoping for a big quilty Sunday.

Tuesday, January 03, 2012

2012 UFOs - January is #5 - week 1

So Judy picked the UFO number on Sunday (OMG, I was stalking for this number on Sunday!) and she picked 5. So let’s take a look at the 5 box, plus the bonuses plus the homework.

Box 5

5a Snowmen – I swapped 12” snowmen blocks a while ago and also some snow FQs. Status: Flimsy.
5b Australia FQs – I received these in a secret santa type box and I need to finish this project and donate it. Status: In pieces.
5c Bricks & Stepping Stones – I started these blocks trying to make 10 per color of Judy Laquidara’s 2011 Monochromatic challenge. Status: Some blocks completed.
5d Watermelon – A Dorothy Young pattern. Status: Sandwiched.

Homework

12 Chiclets blocks
4 Old Navy Flag shirts
8 String QAYG blocks

Bonus UFOs

25 Orca Bay – The Bonnie Hunter 2011 Christmas mystery. Status: In pieces.
26 Jeanne’s Diamonds – The Dorothy Young 2011 Christmas mystery. Status: In pieces.

So from all of this, I need 2 finishes for January. Here are my goals for this week on this box. I hesitate to talk about the whole month, so let’s just start with the week.

5a Nothing.
5b I think I know what I want to do. So I will pull everything together and let it sit there for a while and let it percolate.
5c I want to make 60 black and white 4 patches and look up the colors that were 7-12.
5d Pull it out of the closet and study it. Start quilting on it and be ¼ of the way done with the quilting.

Complete the 8 string QAYG blocks.
Cut 2.5” strips for Chiclets blocks. I have a bunch of fabric lying around and so while I put it all away, I’ll just cut a strip from each one.
Nothing on the Old Navy shirts.

For Orca Bay , I will assemble a little row and a star row. I’m starting at the bottom.
For Jeanne’s Diamonds, I will put the rows together, which will leave me with a completed top without borders.

Additionally I made a mini of Jeanne’s Diamonds and that is sandwiched. I’d like to quilt it by Thursday night and bind it in the car over the weekend, as we are travelling north.

Sunday, January 01, 2012

Sick of Green

I'm sick of green. There, I said it. I'm so stuck in the Orca Bay mystery. I'm trying to finish all of the green clues, since Bonnie's black is my green. OMG, I am so sick of green.

Oh, and Happy New Year.

I shall persevere. I am close to being done with the green. I had hoped to be done with it yesterday, but that did not happen. So today I shall try again to be done.

I went and saw the reveal for Orca Bay and I like it. I'm also glad that I switched the black and green positions in my own quilt. While green is bugging me now, having a quilt with that much black would bug me later with the finished product.

I also need to finish Jeanne's Diamonds, which I also hope to do today.

They're still asleep and I best get downstairs to start HP 6 and finishing up all that green....

Friday, December 30, 2011

Final Friday

Yep, it’s the last Friday of the year. And it’s a nice long weekend.

Goals:

Jeanne’s Diamonds – I have finished all the pieces for this top, and was at the clue where you put the top together when I noted that I really wanted an alternate block in the place where all the negative space blocks were. So I made those last night. But somewhere I cut some fabric both the wrong width and length, so I just stopped sewing at all last night. It was a wise move. So for this weekend I want to have the top finished. I also want to make a mini of this one and finish it, so I can hang the mini on my cube wall under my name plate.

Orca Bay – I know that Step 7 came out today and Step 8 will come out Sunday, but right now my goal is to get caught up. For Step 2, I have 12 done. For Step 4, I have 6 done. For Step 5, I have 200 done (Step 3 included). For Step 6, I have 20 done (Step 1 included). So I’ve done as Bonnie requested and worked a bit on each step as it came out. However, this weekend my goals are to finish Steps 5 and 6, and also the 100 extra units in Step 7 that use leftover Step 5 parts. Any string blocks that I get done will be considered a bonus at this stage of the game!

NYE Mystery – I’ll download the clues and that’s about all right now. We shall see.

January UFO – I’m eager for Judy to pull the number so I know what choices I have! Since a roll of batting is out of the question until late March, I have reviewed each box and there’s enough in each box let me finish stuff without having to worry about my lack of batting. So that’s good. More machine quilting, which may be bad in the short run, but overall, it’s good. So back to the topic – when the number is pulled, I’ll get going this weekend.

IT feels so good to be back in a crafty mood. It had been gone way too long.

Monday, December 19, 2011

2012 UFOs - Read 'Em and Weep

My UFO list for 2012 seems confusing. I have decided to store 4 UFOs per box and I have 6 boxes. So if a month is between 7 and 12, I will just subtract 6 from the number chosen and work from that box. I would love nothing more than to finish a UFO every 2 weeks. That would clear out some backlog. I have more UFOs than fabric, so that’s really how the stashbusting needs to happen. And yes, while 4 * 6 = 24, it would make 26 UFOs to finish one every 2 weeks. So I’m carrying Bonnie Hunter’s Orca Bay and Dorothy Young’s Jeanne’s Diamonds forward as the other 2 UFOs.

So without further adieu, this is how I came up with my 26 UFOs that I claimed to Ellen…All are quilts unless noted. LCRR stands for Log Cabin Round Robin.

Box 1

1a Thimbles BOM – A BOM, with an extra block made so I can set on point. Civil War fabrics. Status: Blocks completed.

1b Christmas 2 BOM – I took the instructions for 2 different BOMs I was in and made another block in Christmas fabrics. I need to make the 25th block and set them on point. Status: Most blocks completed.

1c Seaside Rose Sweatshirt – A jacket covered in the Seaside Rose line, with the jacket coming from a sweatshirt. Status: In pieces.

1d Red Strings – Red string blocks and die-cut hearts come together for a cuddle quilt. Status: In pieces.

Box 2

2a Chiclets Table Runner – I made a 4 block rectangular runner that I want to hang on my cube wall. Status: Flimsy.

2b Huge Fence Rail – I made a bunch of these fence rail blocks which are only 3 rails each, but the rails are each 3.5 inches. I want to make this into a quilt and donate it onward. Status: Most blocks completed.

2c 16 String Blocks – Just like it sounds, I have 16 string blocks done. I want to make some more, make a quilt and donate it onward. Status: Most blocks completed.

2d Yellow LCRR – I made this for my DD. Status: Blocks completed.

Box 3

3a Carpenter’s Wheel – A Dorothy Young pattern. Status: Flimsy.

3b Dear Jane LCRR – Log cabin blocks done with a Dear Jane block in the middle. Status: Blocks completed.

3c Easter Carrie Nation – A Dorothy Young pattern. Status: Flimsy.

3d My Blue Heaven – A Bonnie Hunter pattern. I hate the quilting I’ve done on it. Status: Needs to have quilting frogged and redone.

Box 4

4a Diamond Shapes – Die-cut diamonds and no focus. Status: In pieces.

4b Valentines – Lots of nickel charm packs in this one. Status: Most blocks completed.

4c Purse Pack – A package of fun and different fabrics that I bought. Status: In pieces.

4d St. Pat’s LCRR – Making this one for the month of March of course. Status: Blocks completed.

Box 5

5a Snowmen – I swapped 12” snowmen blocks a while ago and also some snow FQs. Status: Flimsy.

5b Australia FQs – I received these in a secret santa type box and I need to finish this project and donate it. Status: In pieces.

5c Bricks & Stepping Stones – I started these blocks trying to make 10 per color of Judy Laquidara’s 2011 Monochromatic challenge. Status: Some blocks completed.

5d Watermelon – A Dorothy Young pattern. Status: Sandwiched.

Box 6

6a Bird Crewel – A piece of needlepoint needing some finishing. Status: In pieces.

6b Beau’s – I swapped with Nancy , Near Philadelphia for the Miss Mellie quilt and Ashley’s quilt. It only makes sense that I bring everything together for a huge quilt called Beau’s quilt. Status: Most blocks completed.

6c Dog Bandannas – I have many bandannas from my dog and a friend’s. Status: In pieces.

6d Black & White BOM – The BOM won’t finish until July, but when it’s done it will be finished in blue and hopefully go to DD. Status: Some blocks completed.

Bonus UFOs

25 Orca Bay – The Bonnie Hunter 2011 Christmas mystery. Status: In pieces.

26 Jeanne’s Diamonds – The Dorothy Young 2011 Christmas mystery. Status: In pieces.

Homework – Yes, I do also assign myself monthly homework. So for each month, I plan to make/do…

12 Chiclets blocks
4 Old Navy Flag shirts
8 String QAYG blocks

And that is more than enough to do for 2012. I desperately need to order a roll of batting! It feels good to be enthused about quilting again and to have some semblance of a plan.

Addendum: I'm going to track my additional costs of finishing these UFOs. I wonder what that will be this upcoming year....

Monday, December 12, 2011

Weekend Update

Despite having a huge migraine for part of the weekend, I did spend some time sewing.

I did indeed go through my entire set of scraps from the yellow log cabin and pulled out all of the leftovers. I made 350+ inches of binding and sewed them all together on the bias, so all of those triangles are now in the scrap bucket. Any other 2.5 inch logs were cut up the middle and thrown in the yellow strings ice cream bucket. Well, by that point, I might as well just cut the foundation papers and go.

And I’m so glad I did; it was the mindless sewing in the near-dark I could do with a migraine. I got 6 of them done, 6 black ones and a whole bunch of HSTs that had been previously cut out. I’m now out of pre-cut units, but I got far despite the migraine, which is good. I still have 2.0 green strips cut, so more HSTs until those run out. Then I can cut more greens and keep working on QSTs.

One day I’ll be caught up. But for now, I’ve got every step underway.

Friday, December 09, 2011

Actual Sewing - Can You Believe It?

I sewed yesterday for a little bit. I actually cleaned up my cutting table for 15 minutes first. I was so excited, as I found a packet of 80 die-cut hearts that I have been looking for, plus I unearthed my quilter’s reference book. You know the one – it has how to set on point and how many triangles will you need and cut them this way, etc. I was quite glad to see that again.

We’re trying to move back our small family room sofa so that there is more floor space for the PS3 Move that we have. My cutting table butts up against the sofa, so the cutting table has to move so that we can move the sofa. So it will move to where the ironing board is. The ironing board will go away and so I need an ironing pad. A series of bookcases are also going to be moved in all of this, so it’s just a boatload of crazy. We want it done soon, so that we can enjoy the Move, but it is not a requirement for us to host Christmas.

We are hosting Ted’s mother’s side, who are all very forgiving people when it comes to housework. That is right up my alley.

In detailed Orca Bay news, I am using green where Bonnie is using black. So I am taking out 5 hunks of green fabric at a time and cutting 1.5 strips and 2.0 strips, and then of course the corresponding neutrals. Someone did point out that the HSTs for Old Tobacco Road (OTR) were the same size as these, so I’m cutting more 2.0 strips and just piecing those HSTs like crazy and dumping them in an ice cream bucket. Once I get all the QSTs made and counted, etc, I will go back and start pressing and counting all of the HSTs. I want to knock out the OTR ones at the same time and since I have a king sized bed, I want like double the amount of HSTs. So basically I just need to make 1200 HSTs and life will be good. See why I’m not even counting them at this point? I have 22 QSTs sewn and many halves sewn.

I am using black where Bonnie is using blue, so I did cut out 18 foundation papers and started sewing those as the leaders and enders for when I chain-piece all the cut green pieces. I just add a strip to every block I’ve started and make sure the last thing through the needle is a new string block. These are going very quickly. I have not been able to find any black strings so far in my scrap bags, so I am cutting strips from black hunks of fabric.

I am using yellow where Bonnie is using red, and of course since I work, I haven’t started those yet. I don’t think I can have 4 steps going at once. So these will just have to wait. I did just finish an all yellow log cabin, so I have tons and tons of leftover strips that I will use. I will sort through all of my bags and pull them all. The first goal will be to see if the strip is 2.5 inches. If so, and it’s long enough, it will go into the pieced binding. Once I have 350 inches of binding or if the strip doesn’t meet the binding qualifications, I’ll go ahead and use it as a string.

My weekend is already a bit crazy, but that’s OK. The goal right now is to finish the QSTs while sewing on steps 2 and 3.

As for Christmas, I have two small gifties to make for a pair of sisters that are the nieces of a friend of mine. That will be something fun to do next week.

Wednesday, December 07, 2011

Folding Optional

As we are now in what I am calling the 4 Long Weeks, this week and perhaps the rest have been dubbed Folding Optional. We are literally gone every weekend or we are hosting. One or the other. So since I don’t have the weekends to do laundry, I’m doing it during the week, thanks to the wonderful timer capability on my lovely LG washer. I set one load up to go off at like 4.30 in the morning. I throw it in the dryer as I get up in the morning (I get up about an hour before I actually start moving – it’s called coffee) (and Facebook, truth be told). Then I set up another load to go off at about 5pm and I can throw that one in the dyer when we get home at about 6pm. If I’m feeling super-industrious, I throw another load in that I switch out as I head out for bed.

Everything ends up in laundry baskets. Folding is truly optional right now. There’s nothing I can do about it and I could fold, but then I would be doing housework all the time and not resting, which is really not a very good thing. So, yeah, grab your stuff from the laundry basket.

Keeping this quilty: I am now up to 22 QSTs – 10%! And I sewed some HSTs and left them chained together and dumped them into an ice cream tub. No string blocks at all; I went through 2 bags of scraps yesterday and some of my cutting table and no black strings or scraps showed up.

Monday, December 05, 2011

Bear Down

Yesterday we went to the Bears game. While the game itself was atrocious, there are a few things that I try to notice each time we go.

The classiest piece of Bears-wear that I noticed belonged to a gentleman in the row in front of me. He was wearing a navy fedora with a discreet GSH on the brim. For those of you old enough to understand this, it was the same style hat Papa Bear Halas wore on the sidelines. It was impressive.

I also take note of jersey sightings. I myself wear 34 Walter Payton – can’t go wrong with Sweetness. I did spot the usual amount of 54 Brian Urlacher and 90 Julius Peppers and of course 23 Devin Hester. Some 1985 throwbacks included 45 Gary Fencik (2 of them!) and 72 William Perry. I also saw one that nearly broke my heart – 57 Olin Kreutz, sadly traded away before the season started. There were 51 Dick Butkus or course. But the best by far was 3 Bronko Nagurski. That is downright old school and as they say in The Incredibles, the old school is the best school.

Gary is a guy who sits in our section and for the second year in a row, he was absent. However, his daughter was there (they have the same smile), and I’m here to tell you that 6 beers by the end of the third quarter is not cute. You were spilling your beer and generally looking like a fool. Please, be classy.

And last, but not least, the guy behind me had a cowbell. He’s lucky to still be alive.

To keep this quilty, I have done one QST for Orca Bay . Count ‘em, one.

Sunday, November 27, 2011

Gearing Up and Winding Down

Well, I've decided to try metal bobbins in Ed to see if it helps, as the machine came back to me with a metal bobbin in it. That seems to mitigate the problem. I've also messed with the tension more than I ever care to.

I now need to find a sewing machine repair place nearby.

I did indeed finish up my swap and get it mailed. I found the pattern that I needed for 2 little gifties I need to make. My BOM is up to date. So I've started Orca Bay, with green where the black goes, so it's a Green Bay and not an Orca Bay!

I've decided that each week, I will do each step plus 50 from step 1. That will keep the sewing sane.

I've also started revamping the sewing area, which is being done in conjunction with the revamp of the family room (all of us have our hobbies in the family room - it's a zoo). Ted and I talked it through and we have a plan. Now to work the plan.

Today I've started project restock the deep freeze, and so off I go to package up 5 packets of pork chops bought in bulk today.

Friday, November 25, 2011

Machine Woes

There are 4 machines in my life (actually 6, but the other 2 don't have names...).

Old Betsy is up at Kim's.
Ed has just arrived back to me after Kim had him serviced at some place on Harlem that someone swore was wonderful.
Ruby is my Janome Gem that I dropped off today for servicing.
And Edd (yes, it's an Ed thing - points if you get the reference) is in the garage.

Since I just dropped off Ruby today, I've been using Ed. And man is Ed a mess. It's like he was never serviced. He has 22 stitches - now only 2 work. And this evening tension problems decided to rear their ugly heads.

As Flo would say on Good Times - damn damn damn.

Thursday, November 17, 2011

It's Almost Here!

Tomorrow starts the Orca Bay mystery! See the button on my sidebar?

Thursday, October 27, 2011

The Two Word Fax

If you have ever followed the career of a guy named Michael Jordan, he returned to basketball after the death of his father with a two word fax: "I'm back."

And all of Chicagoland rejoiced. (And the west side really rejoiced; the economic benefit was tremendous!)

And with that, here I am. My quilting mojo has returned. I have rejoined stashbusters. Life is good.