I'm working along this weekend, despite sleeping in until 9am this morning. That was luxurious, I assure you.
So I'm working on Second Hand Clothes for a soon-to-arrive baby. The dark pink I had hoped to use in the 9 patches (the fabric that makes the chain) did not want to be found today. So on to plan B I went, which was a yellow with pink flowers on it. AS of this writing I have 12 of the 16 blocks made and 14 of the 25 solid blocks cut.
Meanwhile, I am continuing to work on Hugs and Kisses. I finished Clue 5, which was the remaining 10 O blocks. Then I started on Clue 6, which is a sashing unit. I have 4 more to finish, which I will do while I sew the remaining 4 blocks for the baby quilt.
What I do is alternate which block I'm working on as I sew. So I will sew a seam for the baby quilt, then the mystery, then the baby quilt, etc. It's more intense than leaders and enders, but it does require that I can keep 2 sets of instructions straight. Sometimes I can, and sometimes I can't. Lately, I can!
Last night we watched The Blues Brothers. I bought the DVD for Thanksgiving travels and they never watched it. So Ted and I sat and enjoyed it last night (Renee does not know what she missed!). I finished sewing down the binding on Carolyn's quilt, so I'm moving forward there. It was so fun to watch, it wasn't worth trying to sew on the machine.
Oh and I got a lot of the yellow scraps sorted out of my scrap bags. It's not all of the scraps, but the baggie is full, so I will work with whatever's in there.
No comments:
Post a Comment