Tuesday, September 08, 2009

weekend update

Now it’s time to get down to business.


Labor Day weekend is over. It was nice that it was so late this year; it’s a shorter time until my birthday and another week of the school term got accomplished (my term, not hers – she’s on her own). We stayed in all weekend and, more importantly, ate in all weekend. I‘m pretty sure we singlehandedly accomplished the goal of 9 meatless meals after having eggplant parmesan 2 weekends in a row.


I did get some things done, like homework and quilting. I did not get the one cleaning thing down that qualifies as the Item that Makes You Nuts. I was planning on doing it while my MIL swung through on her way back from KS, but that return has been delayed because Grandma Mary wanted Karen to go to the banks, etc with her today. So my MIL will be swinging through on a different day in the next week. Since I have class on Thursday, I may or may not see her.


So now I have to get this annoying task done. I hope to spend 15 minutes on it tonight. I just have to do it; it’s making me crazy. Ted and I made a deal that we would both try to get an Item that Makes You Nuts done before Thanksgiving. This task is a small part of mine.


Sewing-wise, my foot pedal has died. A sad day indeed.


I did get the Christmas potholders done and also one of the RR’s. Another goal for tonight is to get those things ready for the post office. I have 1 more RR to do and a Miche shell for a friend and the donation for the Friends of the Brookfield Public Library’s 4th Annual Taste of Brookfield @ Your Library. I was going to make a large quilt, but switched to a small wallhanging. Less pressure.


I also worked on some other sewing items that I have broken down into manageable tasks. My goal is to get through the list once a week and over time, many things will get done. I love to piece, but once there are blocks, the process massively slows down. So I’m trying to break the backlog by breaking into tiny pieces.


Here’s my current list:

A small project – Miche shell, the wallhanging and potholders are on this list

1 denim square – using the fake cathedral windows pattern for denim circles, I’m committed (I need to be committed after this one) to a 5 by 5 square each week

Quilt 1 column on my curtain panels

A Round Robin or Swap – only one RR left

Pre-sash 6 blue blocks


So far for this week, I have completed a small projects (the Xmas potholders), did a denim square, and did a RR. I need to pre-sash some blue blocks and quilt a column. I continue to work on the wallhanging because it has a lot of small parts and appliqué and a little each day really does add up. I also hope to start part of the next RR, because it also has a lot of little parts.


Oh, and I should really do some homework. Details. I only have a 14 page case analysis on Intel due next week. Yawn.


Friday, September 04, 2009

Hope

OK, those Gutsy Gals over at (in)courage are asking for posts about Hope. So here goes.

Hope to me is a lot of things. It is having a president from my home county (much less from my state!) who is all about courage and hope. It is interesting to hear how the Kennedy family viewed Obama as having the same effect as JFK did 50 years ago. It is wonderful to hear people who took a moment from their lives in November and/or January and blogged about how they again felt hope.

(But you did not come here to read about how I am a bleeding heart pinko Cook County Democrat who does politics via the Chicago Way. I digress. Sorry.)

Hope for me is blonde. And eight-and-a-half. And in third grade. Yes, this is my child.

Bereaved parents walk among you. We do not have a mark on our foreheads indicating that we are bereaved parents; we usually never even mention this fact. But we all carry this fact in our hearts and souls – the fact that bad things happen to little children.

I myself have been pregnant 4 times. I have suffered one medically uneventful miscarriage, one adverse diagnosis pregnancy with fetal surgery, 6 amnios and a delivery at 29 weeks. He lived 35 minutes. My third pregnancy resulted in my daughter that I mention above. My fourth pregnancy ended in a miscarriage that nearly cost me my life. I was never so happy to turn 32 in my life (it happened the week before).

That above paragraph is something I can recite emotionless to anyone who asks. It’s the medical version; the cliff notes. I can elaborate, usually without incident, when asked. Other times, not so much. People tell me that I really have it together on this topic. I have it no more or less together than anyone else; but I do have hope.

I am lucky. One of my kids made it so I can be with her. She is hope personified, in Polly Pockets and Pokemon, in chocolate and Hannah Montana. She reminds me and my husband daily why we bother with this journey called life. She reminds us that our proper perspective is not on promotions or paychecks, it’s on learning multiplication tables and the names of all the presidents, not just the two (technically, four, I know, but work with me on this) from Illinois. She reminds us to enjoy life in all of its facets and not just on those we enjoy or are comfortable with. Without this kid, I would never be a Brownies leader or the Market Day mom for the school. I certainly would not know what a zhu zhu pet is or find it a very funny toy that is hypoallergenic!

So, Hope, thy name is Renee. Which means reborn. Which is what we were after she arrived, after so much heartache and pain.

Errata: For the courage post, I wrote about my collegiate parking pass. It was not red this year, nor was it shaped like the state of Illinois. This year it’s green and a boring rectangle. (They said they needed the rectangle to put the swipe stripe on a flat edge. Hello? Illinois’ border with Indiana is also a flat edge for a while. Get creative, people!)

Tuesday, September 01, 2009

Sorry, Grad School is getting in the way

Whoa, it has been a bit since I posted. Can’t you all see that I am now in the throes of grad school?


One theme running around a certain part of blogland is the idea that God may close a door, but He always opens a window. While this is true on the really big important things in life (like MckMama’s almost-house burning down the day BEFORE they were to close), it did happen with the sweet corn. I was gypped at the festival, but a co-worker gave me 4 ears, the farmer gave me 14 more, I had 2 from the previous week and I took 5 more from the exchange table. I ended up freezing 100 ounces of corn, which for our little family of 3 will last me a year. OK, it’s a little thing, but never fear – I will not be wanting for corn this winter.


I have been in squirrel survival mode, stockpiling for the winter. I have put up 3 types of fruit, the corn, and have started to buy a lot of flour, sugar, etc. Last winter, I overbought on the flour and sugar at Christmas, but it was OK because it did get me through a December and January that were either a sheet of ice (Ted literally had to throw me a towline once to get me to walk up the driveway) or bitterly cold (like -22 degrees F – don’t even ask in C). So I’m a bit paranoid about the winter weather being super nasty (more time for quilting!) and making sure we have enough supplies laid in. I’m not sure what I’ plan on stockpiling next, but meat seems like a logical next choice.


Meanwhile back to quilting. I have to get some things done and this 3 day weekend is just the ticket. Besides church, I have nothing else on the agenda, so I should be able to stay in and sew-sew-sew. There are some other things I do want to tackle around the house – things that are driving me nuts and will make my mental health feel better. And sewing is one of them!


Plus I cannot open the package from Nancy for the Miss Mellie swap until I get my deliverables done. And that package is singing its siren song to me from my kitchen table.


Saturday, August 22, 2009

Gypped!

The good news was that Ted was able to purchase a Normal Cornbelters hat. They are our new minor league baseball team, due to start play in the spring.

The bad news was that the Sweet Corn Fest was OUT OF CORN.

Grrr....

A Saturday in the Life of a Married Grad Student....

...or alternatively titled, "It's ALL About the Corn."

This weekend is the Sweet Corn Fest where I live. It's like the Hinsdale Sidewalk Sale and Taste of (insert your town name here) all rolled into one. Except the only food product for sale is corn. They steam it in some antique doohickey and people swear by it. Plus they offer a dozen ears for $3 for putting up purposes.

So this morning, as I was making chocolate mousse in the crockpot (I am not kidding) and making fresh bread, Ted ran to the bank and also ran by to buy 3 dozen ears for me to put up. (If you don't know, 'putting up' is the farmer term for preserving food, either via canning or freezing. I only freeze.) Except he went to the drive through corn pickup and no one was there.

So back out we'll go today, in search of corn. And no doubt, we'll have an ear or two, right then and there. After all, it's only 50 cents an ear!

Tuesday, August 18, 2009

...For These Thy Gifts...


This is our second year with Henry Brockman's CSA. Henry was selected as Illinois' Sustainable Ag Farmer of the Year today; quite the honor. In tonight's box, we have 7 ears of corn, tomatillos, a muskmelon, summer squash, basil, green beans, an eggplant and carrots.

The tomatillos are already made into salsa, using tomatoes from the container tomato plant that I got from Henry's sister Teresa (there are 6 in Henry's family; 4 of them farm). The muskmelon will be prepped tomorrow, and the basil is already made into frozen pesto. I plan on making crockpot stew on Thursday, using many of these things. I'm hoping to make ratatouille with the eggplant.

It was a requirement for me when we moved here (to Godforsaken middle of nowhere) that if we live in the farmland, we eat from the farmland. I'm a localvore about 6 months of the year. And I also got my eggs from the egg CSA. They're Henry's neighbors.

Friday, August 14, 2009

I'm a Wuss and an Avoider...So Here Goes

For the record, I made it through the dentist. A full root canal was required, since when they opened up the tooth, infection ran out. Evidently the infection ran into the root as well, so they did what they had to do. I personally don’t care, as I was sedated. Out cold.

Yes, I am a wuss and get completely sedated for anything more than the 6 month check up. This is how I roll. I have 2 teeth done, #3 is in process and #4 and #5 will be done next spring, which is when I can afford it. This assumes that the last 2 teeth will cooperate with me and not bug me between now and then.

Anyway, now I await the dentist phone call to schedule the follow-up. And to see if it’s really OK that I’m going without antibiotics. I’m OK with no antibiotics, but if I need them to avoid further issues, then by all means, let’s get the show on the road.

We shall see.

Meanwhile on the quilting front…..I have to finish the Mellie swap this weekend without fail. I need to make 120 9-patches by Monday and mail them. I have 80 made. So tonight, I hope to get the swap all ready to be mailed and then handle that tomorrow morning. Too bad I can’t use the Uptown post office due to construction. So off to the main post office I will go.

I also did complete 2 more jeans potholders. This got (rid of) used up 4 log cabin blocks I found and realized they weren’t done because, well, they’re (nasty) homely. So now they’re the fronts and backs of 2 nice potholders that reside in my kitchen.

As you can see, I’m avoiding the QBW topic. Well, let’s just get to it. Today starts Week 34. And because I didn’t make it to Patsy’s my quilty life is all screwed up. And school starts on Monday. So here are my goals, knowing full well that life officially becomes really crazy now.

Mellie swap done
Swap giftie done
Blue quilt squares done (they are being pre-sashed, to use a Dorothy Young term)
Start working on the KitchenAid cover
Quilt curtain panels – at least one

That’s plenty, considering all that needs to be done.

Monday, August 10, 2009

eBay update

The Monopoly chart arrived today. It is for a full scale model of the board. I *cannot* wait to start it.

My friend has a dad who is a woodworker. I would love for Mr. D to make the table for the cross-stitch to go in. That would be fantastic.

Parking Pass Red

There are several blogs that I read. And one that I write. Anyway, some of my newer blogs have been of the ‘mommy blog’ variety, and those usually have been of the bereaved mommy blog variety, because, well, I’m a member of that club. Well, some of these women have come together and made the site (in)courage, which is to nourish the hearts and souls of women. They are more in touch with their faith than I am, so that is what I hope to get out of it. Anyway, head on over to (in)courage now and fill your internal cup until it runneth over.

Meanwhile, they are looking for examples of courage made manifest in the lives of the online women blogging community. I admit that I’m taking the format directly from the blog as far as my courage goes. Please note that this is the last week of summer vacation and classes for me begin Monday the 17th.

I’m nearly thirty-nine and courage is parking pass red. I go to the Office of Parking and Transportation and buy my $77 parking pass for the College of Business. I’m the oldest woman in nearly every class, and the only mom. But I have a goal, which is just a dream with a deadline, of getting my MBA by the time I’m 40. And so I park my minivan in the lot, grab my pink backpack and head into class.

I have a lot of people ask me why I have returned to school. They are expecting the answer of job promotion, greater marketability and the like. My answer is always “for me.” Only one person has ever understood that answer; their response was that it was the best reason of all to go. We are a house of learning. My husband has 2 master’s degrees and I am working on this one, right along with doing Brownies and Market Day, being a wife and a mother to a third grader. Somehow, as a family, we make it happen, around crock pots and drive-thru’s, parent-teacher conferences and business trips.

I do not have any illusions of grandeur about this degree. This is solely for me. What I wanted to do and because I could do it. To learn different things. To enjoy learning at my own pace, and with the benefit of workplace experience. To keep my mind active. (Quilting can do a lot, but not everything.) To show my daughter that learning is life-long.

Wednesday, August 05, 2009

eBay score

OK, it was a complete impulse purchase, but I saw a picture of a cross-stitcher's project of doing the Monopoly board. It's a retired leaflet and let's just say one should observe the First Amendment on this one.

So $23 later (including shipping), I am the proud owner of someone else's leaflet. I love Monopoly and I can't wait to stitch a board.

Squee!

Messy

My cube at work is so messy, I don’t even know where to begin. (For the record, my quilty life is not a whole lot better, so at least I’m consistent.)

To start with, I am a systems analyst for the accountants at my work. Currently, I am on 3 projects. One project I am leading. This is my Big, Shining Moment. Another 2 are low levels of effort for me. And I backfill on some accounting that needs to be done.

Meanwhile, we have a not so great economy here in Central IL. The rest of the USA has a truly horrible economy. We only have not so great; we’re blessedly recession-insulated. Here at my company, we’re not hiring a lot and we’re trying to move people around to backfill when someone retires. One department here has lost of its people due to promotion and maternity leaves and so someone from our department is moving over there.

So the accounting that I backfill is going to someone else, so I’m now backfilling the work that the departed department member did. So things are coming my way all the time. “Here’s the key to file cabinet.” “Don’t forget to schedule training.” And now my cube looks like a disaster.

Time to dig out.

Tuesday, August 04, 2009

What happened?

And where were we?

Believe it or not, it has only been a week since my crazy life (please note that my life was crazy BEFORE all of this started…) took an even crazier turn. And so much for going to Patsy’s.

To make a really long story short, I received a phone call at work last Tuesday morning stating that my sister was in the hospital with a pulmonary embolism. Well, that pretty much made my day. After meeting Ted for lunch to go over logistical things, I headed up north.

It turns out she did not have that problem, but she did pass out nonetheless and bashed in her teeth and misaligned her jaw. So I spend half of Tuesday and all of Wednesday and Thursday up there, arriving back home on Thursday afternoon with my 12 year old nephew in tow. So much for going to Patsy’s.

I had all my projects stacked up on my basement stairs. I was going to make a lot of tops and also take block sets and make them into pieced backs for the tops, because, well, I have no idea what to do with that many block sets. DD was going to finally get a bed-sized quilt. The Brookfield Public Library’s fundraising quilt was going to have the top done. The swap I am in was going to get all done. Same with RR’s I’m in.

We’re going to Patsy’s next year. C’est la vie.

Somewhere in all of this, my motivation to study for my next insurance exam for my job left the building. So this morning, I checked the testing schedule for this testing window and I can still take the exam in this window, but like a month, and not in 2 weeks. This is a huge load off my mind. I also found the study guide, which is an easier read than the text, and I actually put it in my bag. I should attempt to read it.

Meanwhile, Ted is travelling this week and DD and / or I have something every afternoon / evening this week. Monday, it was karate. Tuesday (today), it was the dentist for DD (her first cavity). Wednesday, it’s swim lessons. Thursday is third grade registration. And Friday, I plan on collapsing in a heap. Seriously. Actually, I hope to shop for the Mellie swap on Friday afternoon.

And I am on the very last strip for the barnyard GFG flower. I am so hoping to show those to you!

Monday, July 27, 2009

Pictures!



I thought I'd give pictures a try. Here's one of me, Ted and our fantabulous DD. She's 8 and really shouldn't be carried any more, but every once in a while, Daddy will oblige her.

Now that I know I don't need to use Flickr to show pics, we're off to the races!

This was taken at my Dad's 74th.

Friday, July 24, 2009

Week 30 done - week 31 abbreviated

07/27/09 – It’s now the beginning of Week 31. On a side note, I certainly hope that all of you have seen the highlights of the fantastic PERFECT game thrown by Buehrle of the White Sox. If you haven’t go read about it right now. I’ll wait.

And now for my progress:

Sandwich curtain panels – I got one long column quilted. It’s a start.
For the barnyard GFG flower, I got the 4th strip on and have started on the fifth.
For the 2 books goal, I did start Walden. Like only 3 pages, but I started.
No meatless meals this week.
Wannabees RR – Ute – Nothing done.
Wannabees RR – Julie – Halfway done. I have tried to progress twice and screwed up twice.
60 Mellie blocks – I have 40 done and am working on the next 10. I need to buy some more fabrics.

Since I am headed up to Patsy’s this Thursday, I’m cutting off Week 31 on Thursday morning. Week 31 goals:

Quilt one curtain panel.
Pack for Patsy’s.
Start DH’s 401k – Go through the big basket of paperwork and find what I need.
Pass CPCU 530 – Study through chapter 7.
Use up 100 yards in 2009 – There’s some yardage in the sandwiched pile. See if the Christmas BRB can be sandwiched this week as well.
Communicate with my DH’s grandma once a month – When I’m going through that big basket of paperwork, I will also pull out all of Renee’s school photos so that I can get those mailers ready as well.
Unrelated: Renew CPA Registration!!!! This only comes up once every 3 years and it’s due 09/30/09, so I thought I’d put it on here just in case.
Wannabees RR – Ute – started
Wannabees RR – Julie – mailed
60 Mellie blocks – 40 done – get to 60 done

Monday, July 20, 2009

Week 30

07/20/09 – I just realized by reading the 07/07 post, that the goal was to have a meatless dinner tonight and well, the stew meat is already in the crock pot. Whoops.

We’re now somewhere in Week 30, and I have enjoyed and relaxed over these past 10 days or so. While Ted and Renee were both at various overnight events, I had a really bad 4 day migraine, but once that subsided (which is when Ted came home), I did start getting some things accomplished. Not all on my 101 list, but things nonetheless.

And now for my progress:

Sandwich curtain panels – Done! They are sitting upstairs near the sewing machine that can handle that heavy duty quilting.

Finish the green GFG flower – Done! I just decided (while waiting for my health meter to recharge on a video game – don’t laugh, OK?) to sew it together and call it a day.

Finish strips on the barnyard flower – Done! They are hanging at work outside my cube. There are 9 strips to a flower and I am sewing the fourth one on. I sew this flower at lunch.

Find the 2 books I want to read – Haven’t started to read. Walden is one and I still have not made it to the library. I may just read this Star Trek book that Ted gave me to read.

2 meatless meals – Half-Done! Got one done on 07/07. Total is 2 down and 7 to go.

Wannabees RR – Ute – Nothing done.

Wannabees RR – Julie – Halfway done. I have 4 pieced boarders to add and then they need a coordinating border to go with. That is all I can write – Julie reads this blog!!!

60 Mellie blocks – I have 40 done and am working on the next 10.

Review Ted’s CD purchases – Only 4 CD’s left. Ted bought Thriller while at ALA. It seemed like a good idea, with all the hoopla and such. So now we need 3.

Pay $120 to the student loan – this has not been happening.

Candles – Researched some supplies.

And lastly my goals for the time between now and Friday morning:

101 goals:

GFG Barnyard Flower – finish the fourth strip and attach the fifth.
The 2 books – Try to read twice this week on Thoreau.
Start DH’s 401k – Go through the big basket of paperwork and find what I need.
Pass CPCU 530 – Study through chapter 5.
Use up 100 yards in 2009 – There’s some yardage in the sandwiched pile. See if the Christmas BRB can be sandwiched this week as well.
Communicate with my DH’s grandma once a month – When I’m going through that big basket of paperwork, I will also pull out all of Renee’s school photos so that I can get those mailers ready as well.
Unrelated: Renew CPA Registration!!!! This only comes up once every 3 years and it’s due 09/30/09, so I thought I’d put it on here just in case.
Wannabees RR – Ute – started
Wannabees RR – Julie – mailed
60 Mellie blocks – 40 done – get to 60 done

Monday, July 13, 2009

Migraines

You’d think that many days without a husband or a child underfoot I would have achieved a lot.

Except I had a 4 day migraine. And there went the concept of progress.

Yesterday was the first day I felt I could function for longer than an hour without retreating to a dark room. Saturday, I did drive DD to Chicago so she could spend the week with her aunt, but it was a very painful drive up and a very painful one home. I am just grateful it was achieved.

I also unplugged my phone. I just couldn’t stand the jarring ring every time I could fall asleep to end the migraine.

So while I had all of these grandiose plans to get so very much done as of Wednesday night to the present, very little has been achieved. I did get the kitchen to an acceptable level, as well as the rest of my main floor. This is key; then anyone can walk in. I of course have been living on that floor this week, so it needs maybe 10 minutes of love, but otherwise I am in good shape. (The dry cleaning lying on the floor is really the issue. Dry cleaning is such a pain in the butt.)

I did also start and accomplish a significant amount of the laundry. There are something like 10 loads that need to be done, and Ted comes home tonight (a day early!) and he’ll be bringing his. Hopefully we can stay on top of this. I have been folding as they are complete (and shamelessly watching the Michael Jackson tribute whilst doing so), so folding is remaining current.

I also did finally get downstairs to sew. After declaring that there was absolutely NOTHING on TV on Sunday, I headed down there. I fired up the Friday Night Lights and got through about 5 episodes. I also got 40 blocks down for the Mellie swap (1/3) and sandwiched a curtain panel, which was no small endeavor. That thing was a monster (4 feet by 7 feet just for the top, so you can imagine the rest), but now that one is sandwiched, there’s only one more left to be sandwiched and then the quilting can begin. I also am developing a way to sandwich large quilts via my ironing board, and if it holds true for the second curtain panel, then I will attempt to sandwich the Christmas BRB this way. Then I will have something like 6 quilts ready to be quilted, which is a good and beautiful thing.

And I just remembered to buy tickets and ride bracelets for the county fair! Yay!

Wednesday, July 08, 2009

Prayers

This is a non-quilty post.

I have decided to bookmark and follow the 3 blogs that made me so emotionally fragile a few weeks ago. They are women who have walked the hard road of grief, but their lives have moved forward (some people just make shrines…). Anyway, one of them has posted a link to a young girl’s story of fighting a brain tumor.

Diagnosed just last week, Kate is 5, loves pink and is fighting an aggressive brain tumor. Their family has been turned upside down. If you pray, pray for these people. This is a shitty thing to go through and no little kid should have to.

http://www.caringbridge.org/visit/mcraekate

OK, one quilty note: I got nothing done yesterday, save 15 minutes of handwork on the barnyard GFG flower.

Tuesday, July 07, 2009

DD is Sewing!

07/07/09 – We did eat meatless last night!!! Quesadillas, beans and rice and fresh broccoli for DD! Next week, I’m the only one home on Meatless Monday, so it will no doubt take a hiatus. I’m eating whatever I want when people are not around! So we are 2 for 9.

DD and I are also working on skirts. Check out the last June project at the Moda Bake Shop (www.modabakeshop.com) and that is what we are making. Hers is blue and mine is pink. This is the most motivated she has ever been to sew, so it really depends on the project.

Monday, July 06, 2009

Week 29? 30? Bueller?

I’m not so sure what week it is, but here are my goals. I’m making this list to get me all the way to July 17. I am considering the July 17 to be the start of week 30 (to get myself back on track).

Sandwich curtain panels
Finish the green GFG flower
Finish strips on the barnyard flower
Find the 2 books I want to read
2 meatless meals

And here are some more goals:
Wannabees RR – Ute
Wannabees RR – Julie
60 Mellie blocks

And my progress from last week:

Review Ted’s CD purchases – I did check with him and nothing else has been purchased besides the Genesis packs. So we need to buy 4 more.

Pay $120 to the student loan – this has not been happening. It is very possible that I will not make this one by Ted’s 40th, but sometime in his 40th year.

Sandwich curtain panels – I actually got one panel sewn, so the process is beginning.

Finish the green GFG flower – I have only one white strip to sew on.

Finish strips on the barnyard flower – all done and waiting in my cube to go.

Find the 2 books I want to read – I actually have some thoughts on this. One is Walden by Thoreau. My sister gave me some other ideas.

Potholders – completed and given to my sister.

Ted and DD will be gone for a while, with everyone back under one roof on Friday, July 17, late that night. So I plan to get lots of annoying things done during that time.

Friday, June 26, 2009

Week 27

It’s week 27, and here are my goals:

Review Ted’s CD purchases
Pay $120 to the student loan
Sandwich curtain panels
Finish the green GFG flower
Finish strips on the barnyard flower
Find the 2 books I want to read.

And here are some more goals:
Wannabees RR - Ute
Potholders
20 Mellie blocks

And my progress from last week:

I did nothing on my list. I’m not surprised, with class winding down. Actually getting my MBA is on my 101 list, and by finishing this class, I am now halfway done with my MBA, which is an achievement, at least in my book. Tonight is Relay for Life and so part of my weekend is booked, but we’ll figure it out.

Wednesday, June 24, 2009

But Who's Counting?

In less than 6 hours, I get my life back!

Tuesday, June 23, 2009

36 hours to go

Believe it or not, TOMORROW is my final exam in my accelerated summer class. I absolutely cannot wait. I have a roast in the crock pot and am making Italian Beef with it. One classmate is bringing rolls and cheese and another is going to KFC and buying a bunch of sides. I have a French Silk pie from Market Day in the fridge and we are all good to go for study group tonight. We had a study group the night before the mid-term 3 weeks ago and so we thought we’d do it again tonight. Works well for us.

Ted and DD (well, 99% Ted) cleaned up the main floor of the house so we can have people inside our house. It’s a detail. After work today, I can run home, water the plants (OMG, it’s 102 heat index or something crazy like that), do the last bit of tidying (15 minutes max) and get ready for company.

Unfortunately, I don’t think a lot of things on this week’s 10 in 101 goal list will get done this week, but hey, Friday starts a new week, one without class.

So as Scarlett says, ‘tomorrow is another day.’

Friday, June 19, 2009

Week 26 Goals

I’m going to make my 101 week match my quilting week for sake of my mental health. So for the week that starts 06/19 (week 26), here are my 101 goals:

Review Ted’s CD purchases
Pay $120 to the student loan
Sandwich curtain panels
Finish the green GFG flower - brought it home for the weekend

And here are some more goals:
Wannabees RR
Potholders - started last night
20 Mellie blocks
Finish FIL 440, another class toward the MBA

Tuesday, June 16, 2009

10 in 101

There’s a challenge out here called 101 Things in 1001 Days. It is actually fascinating; list 101 things that you want to do (the bucket list) and/or 101 things that you have been procrastinating on. I’ve started this once before and one of the first things I completed was switching my mortgage from monthly to bi-weekly and I’ve saved like $100,000 in interest or something crazy. Well worth my time. However, 101 is a lot for me to focus on. So some people chop it into smaller pieces. I’ve even seen things like 3 in 30.

With the summer term for me ending in 9 days (but who’s counting?), I’m going to see if there are 10 things I can do in 101 days. Not quite the same as the 101, but more bite-sixed. This would give me 7 items that would be completely done and others that would have progress. Sometimes, that has to be enough.

Start Date: 06/22/09 (my sister’s birthday)
End Date: 09/29/09 (my birthday)
Yes, it’s only 99 days

1. Complete the grandmother's flower garden quilt (progress is plenty, trust me)
Goal: finish the barnyard flower and green flower. Start diamonds process.

24. Work my way through the Alphabet reading a book by authors whose last name begins with each letter. I didn’t mean I have to read in alphabetical order, just that I have to read a book for every letter.
Brown – The da Vinci Code
Moore – The Stupidest Angel
Goal: Read 2 more books.

• 16. make candles just once
Goal: Complete the mission

• 44. climb a rock wall
Goal: A friend’s kids want to come down to our wall, so maybe then.

• 52. start DH’s 401k
Goal: Fix this mess.

D. Finish my CPCU
Goal: Pass CPCU 530 – test date is 08/19/09

K. Pay off Ted’s student loan
Goal: Current balance is 3800 – get to 2000 left

U. Use up 100 yards in 2009
Goal: Get to only 40 yards left in the dash.

• Make some fabric grocery bags and stop using plastic ones
Goal: Just Do It

64. Communicate with my DH’s grandma once a month
Goal: 3 times

• Eat Meatless one night a week for two months
Goal: Just Do It

9. Complete the woods sampler – restarted on smaller canvas.
Goal: Progress. Not sure how best to do this, but some progress would be good.

• 87. Buy 33 new CD’s (like 1 per month) – DH and I are doing this one together.
Genesis – blue box – 6 CDs
Genesis – red box – 10 CDs
Genesis – green box – 13 CDs
Goal: See if Ted’s bought 4 more CDs. Which I bet he has.

• 19. See the movie Crash
Goal: Stalk the Tivo.

Unrelated: Renew CPA Registration!!!! This only comes up once every 3 years and it’s due 09/30/09, so I thought I’d put it on here just in case.

Tuesday, June 09, 2009

Over Halfway There

Well, it’s technically still Week 24, but besides washing the curtain backing fabric and doing some retail therapy on Saturday, nothing quilty has been accomplished. Such is life for a grad school student.

I have only 5 more classes to go. I just need to get to June 24 at 10pm and then my summer is my own. Well, except for that insurance exam I need to take on August 19….

Sunday, June 07, 2009

100 Yard Dash Update

In my infinite wisdom, I never updated my spreadsheet nor my sidebar over to the right for the completion of the P&P quilt. Based on the Superbowl post below, I had the quilting done by then. So I'm guessing that March first was when it was done. I can guarantee you it's done; it's a fort in the basement right now.

Well, that does help to be 8.25 yards closer.

Sunday Morning Peace

I can tell it's summer - Ted and DD were up until midnight having fun. So of course, I'm the only one up and they are both OUT.

It's a gentle rain this morning in central IL. Right now, I hear an owl whoo-hoo-ing. That is very interesting.

My flowers made it into the ground yesterday, so I am grateful for the rain. We never quite made it to Peoria. We were really slow leaving the house and I told Ted there was nothing urgent, so let the day go as it does. We did make it up to Washington to that quilt shop and I did some damage. (I joined a quilt swap where the quilt is a called "A Quilt for Melanie Wilkes." How can I not join?!?!?!)

So today, there is housework and folding and laundry and homework. And getting ready for camp and tonight's cocktail party and hopefully some quilting.

Sorry for no pics yet - slept away Friday afternoon and did I need it. I had a migraine flirting with me and that kept it at bay.

Friday, June 05, 2009

A Baby Step

Well, I had high hopes for last night. I did cut and wash the curtain panel backing. That makes a lot easier. However, I did not piece anything or look at Ute’s RR. Whoops.

I did, however, talk in depth with Ted about next week’s schedule and DD’s first week at camp. This is a new experience for her and so we are trying to manage the logistics. She also has expressed an interest in taking karate (the first time ever for a sport) (everything else has been our idea) and so we signed her up for those at $2 per lesson. However, they start Monday, so the first day of camp will be craziness.

So while sewing wasn’t accomplished, logistics and family time were, and that is never a bad thing.

So for this afternoon and tonight….

Piece the 2 panels (rows are done – just piece the rows)
Sandwich the 2 curtain panels
Pictures!
Kim’s potholders
Ute’s RR

Plus stuff like…
Menu planning
Grocery list
Dinner
Brownies paperwork all done and filed away
Camp backpack
Dishes, folding, etc.
Call Kim

Thursday, June 04, 2009

Week 24 Goals

So now we’ll try for 2 posts in one day.

I used to post that my quilting week began on Friday, whenever work was done. Using that, tomorrow at 12:15 starts Week 24. Anything I get done tonight, I’m counting towards it.

Thursday night
Cut and wash curtain panel backing
Piece the 2 panels (rows are done – just piece the rows)
Look at Ute’s RR

Friday night
Sandwich the 2 curtain panels
Pictures!
Kim’s potholders
Ute’s RR

The weekend
Finish Ute’s RR
Do the zigzag quilting on the curtain panels and the chiclet quilt

I have no idea what I can get done next week during the week, so we will just manage with this.

I suck

So much for my New Year’s resolution to update this blog. Whoops.

As I mentioned in a January post, I’m in school until essentially the fourth of July. It’s actually the 24th of June at 10pm, but who is keeping exact track?  Last night I had my summer class’ midterm. It seems to have a midterm after only 3 weeks of class, but that is the way it works. My spring classes ended well; I got an A in one (the boring one) and a B in the other. It was my first B in grad school and hopefully my last, but even so, as long as my GPA stays above 3.5 (I’m at 3.81), I continue to qualify for a grad student grant. I need that grant to pay for this whole endeavor!

Anyway, it’s been a dearth of quilting. I have been plagued for the last 4 months with what I describe as annoying illnesses – ear infections, strep, exhaustion and finally diverticulitis, which made me so exhausted, I felt like I did when I had mono. Don’t worry, I don’t have mono! But I have to go a week from tomorrow and have another blood draw done to confirm that I am on the mend and not suffering from thyroid problems or anything else.

So needless to say, quilting has just not been happening. I have suffered a bit from ‘I need to handle this one project before I can face anything else’ syndrome. I also realize that I want to piece, but there’s too much piecing lying around not turning into anything else. I also realize that I have a lot of projects out right now and I am being overwhelmed by them. And Ted’s crap is all over my space right now, and that is not helping things either.

So starting anew, as I am feeling better, the midterm is done and I can see the light at the end of the tunnel:

Goals for June:

Update at least one a week.
Pictures!
2 more potholders for Kim’s birthday on June 22.
Finish Ute’s round robin.
Finish the 2 curtain panels, wash backing, sandwich and zigzag quilt. Attach binding.
Pay Patsy for retreat.
Quilt chiclets quilt.
Sandwich Christmas BRB.

I know there’s more, but let’s just start there.

Sunday, February 22, 2009

This morning

For the record, it started as a nice, calm morning. I got up, started to do dishes, fired up the PC and was thinking about coffee and cinnamon rolls when DD came down the stairs and very calmly said she had just thrown up.

And a good morning to you too.

So now I'm on the third load of laundry. The grocery list is made; now I just need to go and run. A third of my own homework is done. I hope to get partway through the next third before I leave to get groceries.

Ain't life grand?

To keep this quilty, I did finish quilting my P&P last night. Tonight's goal is to trim it and attach the binding. Also, make 6 boxy stars blocks and find my focus fabric for Judy's quilt-along.

Wednesday, February 11, 2009

Morning musings

It’s been far too long since I updated. Hrmmm… So I’m taking a little time right now to type something up. I was trying to do an account reconciliation, and then I discovered that others did some things in my accounts and they didn’t tell me. So in a fit of frustration, I took the whole stack of papers and put it in a very messy pile behind me in my cube and pretty much have told everyone it can stay there and rot for all I care. In reality, it will stay there until I can talk to someone who can help me make sense of it. Because at this company, I don’t have the freedom (nor should I – I am OK with this) to do exactly what I want.

So here I am.

I need to do a total of stashbusting for January. The only things that got down were a tiny dresser topper and the potholders for Kim. The dresser topper was done for the Inauguration, and it was really the Election Night challenge put out there by Sweet Pea. So not exactly a lot of yardage. I have 2 quilts basted and ready for quilting: Chiclets #1, the P&P and Watermelon Slice. No, I haven’t done any quilting on them at all.

I did, however, on Superbowl Sunday, start a blue boxy stars from Bonnie Hunter. Way back, the goal was to do a Bonnie quilt in blue on the day of the big game. I think that may have changed over time, but that is what I remembered. (Due to homework, I have had to go no mail on my quilting lists.) So I started and got pretty far – maybe halfway with making the 120 units that will make the 30 stars. This quilt will go to the 4th Annual Taste of Brookfield @ your library. The library has its largest fundraiser with FOOD INSIDE THE LIBRARY. Yes, sacrilege if I’ve ever heard it, but it is a ton of fun. I organized the 1st Annual, so I’m partial to this event. It won’t be until the fall, but if I start now, it won’t hurt.

I haven’t been doing a lot of stitching at lunch either, because of year end at work or going out for lunch. I need to get back to that. I’m running out of hexagons and need to start making the large bloom so I can unbaste some! Plus I plan to run Joann’s this weekend and get thread for Watermelon Slice, since thread is on sale.

So my new goals for now are:

Post a January stashbusting total.
1 hex done in February.
Quilt 2 quilts.
Bind 2 quilts.
Finish the stars for boxy stars.
Make dresser topper to match Watermelon Slice.

My Q1 goals are:
25 yards busted from stash.
Finish the fab 4 I want to do: P&P, Chiclets #1, Watermelon Slice and the Christmas BRB.
Finish boxy stars top.

OK that’s plenty and I’m getting overwhelmed. Back to work.

Monday, January 12, 2009

Sneaky

I’ve gotten devious. Or smart, depending on how you look at it. I realize that I pretty much stay here at work for lunch and bring something to heat up. I only have a half-hour to eat, but once you show me anyone in this building who enforces that rule, we’ll talk. But when I go downstairs to eat, it’s usually more like 15 minutes – eat and run. They do have a TV and put on CNN, which is nice.

So I’ve decided to start bring in my GFG to work on. I will sew 5 hexs per day. Since each of my flowers are triple bloom with a full white border, that means it will take me 12 business days to complete the hex sewing of a flower. Then I’ll go ahead and start flower construction. This is about 15 minutes of sewing time per day, guaranteed.

I’d love to get one flower done per calendar month. I would just ROCK if I did that. But fat chance, that is not happening. I’d be pleased with 6 flowers this year. I have another 6 or 7 done at home. I plan on connecting using green diamonds, so my other goal this year is to have a single bloom flower of the flowers I’ve done. That should take up the rest of the time.

Tonight starts class. I’ve heard that this prof is incredibly dull, treats you like you were stupid and spends 3 evenings teaching us how to get on to the internet. I hope he knows that Vint Cerf invented the internet (he did – go google it right now). I worked at MCI when Vint did, so I know my knowledge is correct. So here’s hoping that tonight’s class is short because we are just introducing ourselves and going through the syllabus.

Sunday, January 11, 2009

The End of Freedom

Tomorrow, I go back to class for 18 weeks and then it's right into another 6 weeks doing double time. I'm essentially in school until the 4th of July. That's a long stretch in life, it seems.

So today I worked my tail off to get my fab 5 set up for the term. The Christmas BRB is still in a pile on my bedroom floor. That one will wait to be sandwiched until I have more spray baste. Watermelon Slice is sandwiched and ready to go, except I have no idea on how to quilt it or any appropriate thread. I sandwiched Patches & Pinwheels with the last of the spray baste (and pinned as well) this evening. There's a pucker ot two in the back; I just don't care. It's mean for my DD to enjoy while watching TV and playing in our basement family room. The Chiclets #1 quilt was easily basted without issue this afternoon and it's ready to go.

I do have ideas on how to quilt both the BRB and the P&P, so at least I can get started on the P&P. I need some thoughts/inspiration for the Chiclets quilt and for Watermelon Slice. For WS, I need to read what people are doing on A Pocketful of Mysteries; maybe that will insprire me.

As far as the flannel quilt goes, I took it out and assessed it. Realized that I could just plod on. Worked on it for an hour the other day. Tried to work on it again today and sewed it very very wrong. Threw it out. As I was pitching it, DH saw and asked. When I explained, he helped me. I've only thrown away 2 projects ever and both times it was so liberating. This was time #2.

So my fab 5 is now a fab 4.

Once I got all of that dne, I took out a baggie and started making some crumb blocks from the contents. I ahve had a hankering to make crumb blocks for a while and once my fab 5 were ready for teh school term, I got right to it.

New goals:

1 hour of some sort of sewing a night.

Friday, January 02, 2009

2009 resolutions

I have made some quilty New Year’s resolutions. Let’s see how this goes.


Resolutions


I resolve to update this blog at least once a week with my quilty progress. I’ve been really bad about it and I just need to be better about it. It’s just that simple.


I resolve to put pictures up on this blog. Blogs with pictures are better and that is a fact. I also just have been too lazy about learning new computer things and have relied on Ted. Well, after Ted broke BOTH PCs in December, I feel the need to be a bit more proactive.


I resolve to have 52 crafts this year of some sort or another. This is for another challenge somewhere else, but since 90+% of them will be most likely be quilty, here’s a good place to talk about them.


I resolve to bust 100 yards from stash. I work my stash inventory like the IRS – everything you’ve got, plus everything you’ve bought this year is inventory. No one told me it had to age in the stash a certain amount of time to be considered stash. If the time elapsed is 5 minutes, who cares? Makes my math easier.


I resolve to make sure my husband Ted and my DD each get quilts from me. Somehow, they always get the short end of the stick.


How To’s


I’m not sure how to accomplish all of that. I do know that when I am in grad school, I quilt a lot less, especially if I am also taking insurance exams for work. Fortunately, for all of 2009, I have decided to take only one insurance exam and it is January 28. So one crisis is solved. However, quilting during grad school still is a challenge.


I have figured out that the picking of fabrics, cutting of fabrics, piecing, and making units and subunits and blocks requires an attention to detail I do not possess during the school term. So I have decided to work a lot on UFOs. A UFO, as defined by me, is any project that has been committed in some way to cloth – from fabric and a pattern have been selected to blocks are done and anything and everything in between.


I’ve also decided that working on groups of 5 at a time seems to make sense, so I will tweak a Stashbusters idea, and have the Fabulous 5. My goal right now is to get as many of the Fab 5 to the ‘ready to be quilted’ stage. Quilting is something I can do with ease during the school term, so if I can get lots of things sandwiched and ready to quilt, life is good. I go back to class on the 12th, so I may try to get 10 or even 15 items ready to go, so that I have an inventory of quilt sandwiches to work on. I hate making the quilt sandwich, but hey, sometimes you gotta do what you gotta do. I need enough inventory to get me through to spring break in early March.


That said, here are my first Fab 5 (if no goal is stated, then it’s completion):


1. Christmas Blue Ridge Beauty (BRB) – For you Bonnie Hunter fans, I took her BRB and made each diamond either red or green. This took some thought, but it did bust a lot of Christmas stash, which was the point. I have fallen out love with my Christmas stash and I really do the holiday low key anyway, so this seemed like a good idea. The top is all done and the backing has been selected. Part of my holiday quilt collection, representing December.


2. Watermelon Slice – For you Dorothy Young mystery quilters on A Pocketful of Mysteries, I did her Christmas quilt for the second time and it turned out great. It was what I needed to get back in the quilty groove. I got fabrics selected, the top is made and the whole monster is sandwiched and ready to quilt. Part of my holiday quilt collection, representing June (maybe August – not sure).


3. Patches & Pinwheels – Another Bonnie Hunter pattern. When I made the pinwheels, I made 80+ spinning each way, which meant I had enough for 2 quilts. The first quilt is done and went to a silent auction. The second quilt, which will be for my family room, is in rows.


4. Flannel quilt – You know the type, flannel front and back in squares, and sewn together and snip the edges and all of that. It was abandoned long ago and it’s been unearthed. So let’s get this done and donated.


5. Chiclets #1 –The Chiclets pattern was running around Stashbusters for a while there and I started a bazillion blocks. The reason for starting them no longer exists, so I now have a bazillion finished blocks. I plan to set them 4 x 5 and use my roll of plaid fabric (my official charity backing fabric for now) to finish these off into Project Linus quilts.


Thoughts for the next Fab 5:


1. Ted’s birthday quilt
2. Chiclets #2
3. Inauguration dresser quilt (election challenge)
4.
5.

Wednesday, September 17, 2008

I'm baaaacccckkkk!!!!!!!

OMG, it has been a *really long time* since I updated this blog.

It appears that this summer, I went into a huge quilting funk. I finished class in early May and promptly had to have 2 teeth fixed. They were next to each other, upper back. The all the way back one had to get a gold crown and the one next to it needed a root canal and a crown. $2500 and 5 appointments later, my mouth is all better, but there went my summer. Granted, it was an area of my mouth that I have neglected for 10 years, so the fact that one tooth could be saved and neither needed to be pulled is nothing short of a minor miracle. So that killed a lot of my spirit this summer.

I got through that crisis, and then it was the last week in July, which started the Great Travel Period of Ted. He was essentially gone for 2 weeks straight, which meant it was me and DD against the world. Now, I knew this was going to happen, so we had a great time, but still, it’s all about her at that time and not about me sewing.

The second week of August (right when the Olympics opened) was our family vacation to southern California. This was 7 days of pure enjoyment and relaxation (plus 2 very frustrating days of travel). No sewing got done that week, but the rest alone was fantastic. When we arrived home, I started school 2 days later and DD started the day after me.

The past month has been all about getting into the swing of things. Getting used to being in class 2 nights a week. Getting used to second grade. Getting used to being Market Day mom and Brownie troop co-leader. It’s just been a month of getting organized.

But I have started to sew. If you look over to the right, that’s the list for the rest of this year. I’m starting to work on it. But first I had to clean up my sewing area. This took some thought and insight before I could work on it. I decided that part of the problem was that too many projects were out and making me stressed. So using the list to the list as my guide, everything else went away into a closet. And in that process, I made the closet a better place. Having a cleaner sewing area has helped immensely.

And then Cher sends me a “you’re the queen!” notice. Aw dang.

Monday, June 16, 2008

Sunday's baby steps

Well, for the first time what seems like forever, I stepped into the family room to sew. After the ironing board disaster, I went and bought a cheap cover at Target. Well, the soda got into the bottom casing of the iron which is open because the cord winds into there. So now the new cover has soda spots on it. Whatever.

I cut 10 2” strips of cream and then picked out the blues to go with and got a few things sewn together.

I would hope to sew tonight, but I have part 3 of the root canal, so I will be sedated come this afternoon and that will carry me through until the morning. Tomorrow night we have swimming so maybe I can get down there to sew later on.

Ted figured out why I’ve been so tired. Work for me has really picked up and I have not had that happen in a very long time. So now I need to adapt. It’s good to at least have a reason as to why it is happening!

I’ve already listed my sewing goals, but now a mini-goal is to get the wedding quilt done before I leave for California in August.

Tuesday, June 10, 2008

The Death of the Ironing Board Cover

Well, yesterday turned out to be a double-bust for sewing. I had to go back home to Chicagoland for my annual appointment with my OB and then I stayed for dinner at my sister’s. by the time I got home, I was toast and everyone else was toast. I had gotten up at 5 yesterday morning to make sure I worked enough yesterday before leaving before the doctor’s. thus leading to the extreme tiredness.

Then late last night, Ted reported that a soft drink from a fast food place had exploded on the ironing board. I had left my drink from Sunday’s lunch on the ironing board and the cup gave way and it leaked all over my very scorched ironing board cover. So I just rolled it up and tossed it out. Ted thought for sure the world had ended and it leaked through the pad, etc.

So now I can’t sew until I get a new pad. I’m scheduled for a Target run Friday night, so I guess things will wait until then. Or maybe I’ll just a use for a few days. But tonight contains swimming lessons for both me and DD, and then we need to pick up our farmer produce, so there went tonight!

Monday, June 09, 2008

Second Mini-Challenge

Second Mini-Challenge

My second mini-challenge will run from now until 08/07/08, which is when we leave for vacation. The theme of this challenge is Next Steps. I need to get through the next steps of each of these quilts to feel like something is happening.

1. OC – top done
2. CC – top done
3. Batik Lover’s quilt – top done and sandwiched. I had to withdraw this one from my quilt show earlier this year because it wouldn’t come together. Now that I have gone through and cut from every milk crate, I have put all batik scraps I could find in one spot to finish off the piano key border. Also, one of the blocks in the swap was horribly made, so I will remake that one so the top looks proper.
4. Red Fence Rail – I started this one in the early 1990’s when Ted and I were dating. I have since hosted a log cabin round robin to make a log cabin red back so that this one will be reversible. The goal is to finish both tops.
5. King Center – I have made a 50” center for a scrap quilt for our bed. (We have one on the bed now, but in winter, we need more.) The goal is to sandwich and quilt this center.
6. Super Secret King Center – This is for an online friend. I need to make the 50” center, sandwich it and quilt it. The goal is to run the construction of my King center and her King center concurrently.
7. Xmas Sampler – A few years ago, I did 2 blocks of the month from 2 different stores. I made one block in Christmas fabrics of each block so that I would have 24 blocks done and then I need to make one more, set them all on point, etc. The first goal is to finish the blocks. I am more than halfway done. The second goal would be to finish the top.

Meanwhile, the following remains undone from my first mini-challenge:

Lasagna #2
Brownies Quilt
Baby Boy Quilt
P&P wedding gift
Joyful quilt

This makes 12 projects to work on in the next 7+ weeks. Plus there are a few small things I would like to do. I need some coasters for work that are thematic. I would like to make a few more dresser mats like the little red mat, which is really just making a glorified placemat. I would like to make 2 bags for swimming class, so that after we come home from swimming, the bag and all of its contents can just be dumped into the washer. Plus I need to complete 18 chiclets blocks per quarter. And I did actually make enough pinwheels to make 2 P&P, so to finish off that second one would be a nice bonus.

I am going on a 4 day retreat July 31 – Aug 3. My goal is to take all of my Christmas fabrics (a Rubbermaid tote), buy some WOW or something and make a Blue Ridge Beauty. That’s all I plan on bringing to that retreat.

My last goal of the year will be to finish these items. I will be in class at the point this challenge starts, so no thought is a good thing. God help me if Bonnie does another challenge.
It was a long weekend with DD. Ted was gone for 4 days are returned very late (11:30pm) last night, so I am plumb worn out. Not a stitch of sewing got done, but I did get through my kitchen and my second floor for cleaning.

I hope to sew every night this week.

Wednesday, June 04, 2008

weekend preview

I made an executive decision about my exam and I paid $75 and moved it to October. I am greatly relieved. This was the main source of stress for the famous first 10 days of June, so now that this has been handled, the rest of life is falling into place.

Ted has been feeling better. It seems that after he hurt his ankle, the Percocet they gave him produced a ton of massive side effects which were all detrimental. So he needed another 10 days to recover from the Percocet. Now that he is well, he leaves on yet another business trip tomorrow morning. So he will be gone from early Thursday until late Sunday.

Now that I have no exam, my goal is to enjoy DD and get some stuff done. What gets done, gets done. No more, no less. Tomorrow we plan on going swimming after work/daycare and then going to La Bamba for burritos as big as our heads. Friday night I will make low key, just because that is my style. Maybe homemade milkshakes. Saturday, we plan to make homemade spinach fettuccine. Sunday we plan on going to church. Otherwise we will hang loose.

So how does all of this relate to quilting? I am nearly done with my mini-challenge. I wanted to finish 8 things and I think I will finish 4. Since this is my hobby, I will not beat myself up over this. This is actually pretty good, considering all that went on, including my root canal stuff.

So I hope to work on the 16 patches for the P&P. I also hope to finish lasagna #2. I see that the resolution to the OC has been posted by Bonnie and so of course now I am spurred to continue. I also have the next mini-challenge planned, even before this one is done. I’m such a nut.

Monday, June 02, 2008

Weekend

I did manage a bit of quilting time on Sunday. I sewed some 2” WOC strips to colors for making the 16 patch blocks for the P&P quilt. Not a lot, but it was some time. I will be grateful if I get about 15 minutes per day until the exam is over, but I will strive for that 15 minutes.

Friday, May 30, 2008

a finish in the chaos

I did finish the binding on the first lasagna quilt. So...

UFO #3 - lasanga quilt

Stress has not abated, so I am taking some time to think through how to cope for the next 2 weeks.

Thursday, May 29, 2008

Restful Wednesday

Well, I did not get a lot done last night. I was just at wit’s end, so Ted recommended that I just take the night off and relax. So I watched Recount that I had tivo’d and continued to hand stitch the binding down on the first lasagna quilt. I only sewed for half of the movie, so I’m not done, but it was a restful evening.

Hopefully I can plod through and get some stuff done. This insurance exam looming over my head is making me nutso.

Wednesday, May 28, 2008

exhaustion update

It has been nearly 10 days since I posted. It’s been a hard 10 days.

Ted ended up in the ER last Monday and again yesterday on 2 unrelated items. The only benefit is that we have paid all of our deductibles, so it should all be covered 100%. For many days, I was Mom’s Taxi, running Ted and DD everywhere they needed to be.

DD also threw up one day last week, and that was a hard day. I felt bad for her.

We were to entertain family last Saturday, but cancelled that. We saw them in Chicago on Monday anyway. I did have part 2 of the root canal done as well.

I spent the weekend sewing as much as I could. UFO #3 is the lasagna quilt and I am hand stitching the binding down, so that one will be done soon. I did another bobbin of FMQ on the Jackson quilt. My crowning achievement was finishing 7 dozen pinwheels blocks, spinning in opposite directions (that would be 14 dozen total) for the P&P quilt I am making as a wedding gift.

I have no idea when I will get any time to sew in the next 4 weeks and I am not making that up. My main goal is to continue on this mini-challenge and before Q2 is done, I will report in to Cher how I’ve done. I do have an insurance examination for work on the 10th, and that is eating into my quilting time.

If I get any sewing time, my thoughts are to do a bit on the second lasagna quilt (step 1 is to sandwich and then a bobbin a night), a bobbin a night on the Jackson quilt, and then on to the 16-patches for the P&P quilt. The first 2 items take about an hour total, so we shall see how this goes.

If I end up with a stack of quilts next to my bed that only need the hand stitching of the binding down, that will be a huge achievement.

So hang in there, all. I’m exhausted.

Monday, May 19, 2008

exhaustion

Well, Friday night I relaxed and slept after running 10 errands, making dinner and collapsing.

Saturday I was in Chicago.

Sunday I was in Chicago.

I have done no sewing. And I’m exhausted. Ted’s in Ohio and also in the ER (now resting at the hotel).

Stay tuned.

Friday, May 16, 2008

Week 19 report and Week 20 goals

Last night, I had illusions of grandeur of sewing a storm. Not exactly.

I did watch last week’s and this’ week’s Grey’s Anatomy, so that’s nice. While I did not sew a stitch, I did continue cutting. I started cutting my yellow milk crate. I also cut some WOC strips so I can start cutting blades for the pinwheel blocks for the P&P quilt. I did cut 24 pinwheels of blades and I’m still not done with blue. Such is life.

So week 19 did not have a UFO finish, and while I am bummed by that, I have to remind myself that this mini-challenge is not meant to frustrate me. I had hoped to have a quilt to bind while at my sister’s, but that did not happen. So I will bring my GFG bag with me and hope to get a flower worked on. That would still be progress, just on a different goal.

So Week 20 has the following goals:

Cut yellow milk crate
Finish first lasagna quilt to the hand sewing portion of binding
Brownie top all done
Sandwich other lasagna top
Sandwich baby boy quilt top
Cut into pink and brown milk crate
Sew all cut pinwheels
1 bobbin FMQ on the Jackson quilt

That would have me doing something on all 6 remaining UFOs in this challenge.

Tonight’s goals:
Finish cutting the yellow milk crate.
Cut all pinwheels blades out from all of the 3.5” strips I’ve cut. This would be blue, orange and yellow blades.
Square up Brownie blocks, so they are ready for their next logs.

Thursday, May 15, 2008

nothing new

I didn't sew last night, but I did fold 4 loads of laundry and converted DD's closet from winter to summer. That was enough, I assure you.

Wednesday, May 14, 2008

Sleep, Precious Sleep

Well, I forgot about a library function last night, so I got DD after work, headed to McD’s for dinner and then to the library. We watched “The Hollywood Librarian”, which is a must-see if you love libraries.

Then when we got home, Ted and I ate our dinner, which was ribs. And then I fell promptly asleep at 8:30 and slept all the way through. I did get up at 1:30 for an Aleve and the headache medicine and went right back down.

So no quilting, but I am well rested for sure!

Tuesday, May 13, 2008

Milk Crate Success!

Another day with the teeth. Actually, after being pregnant so many times, I stopped being a belly sleeper and had to become a side sleeper. The problem is that I am lying on the bad teeth. I’m achy and I have 10 days to go. Wish me luck. I didn’t get an appointment this week, so at least I get more sewing time!

I forgot I had a church meeting last night, but they are very prompt that they are only an hour long. So before the meeting I did some cutting and after the meeting I cut for hours. While I got nothing else on my list done, I did finish cutting up the blue and orange milk crate. My God, that took FOREVER.

Tonight there are no errands, but there is laundry and folding. So after those things are done, I hope to do 2 bobbins on a lasagna quilt, which will finish its quilting. I also hope to sandwich the other lasagna quilt, as I did wash the backing last night. I hope to cut 10 yardage pieces of yellow (the next milk crate) and finish framing the Brownies squares. I think that’s plenty for the evening.

Monday, May 12, 2008

Sunday update

Despite major dental work that was started on Friday, it was a pretty good weekend for quilting. I did it all on Sunday instead, which is a great Mother’s Day in my opinion. I needed an emergency root canal on one tooth and potentially on its neighbor. The process is started, but it will take 4 appointments to accomplish the mission. Plus I need to be seriously sedated to get through each appointment because I am a chicken. Thankfully, the dentist gets this.

Meanwhile, Sheri did receive her quilt and it made her day, as she has been having a less than ideal set of days. I’m glad that hit the mark.

So on to Sunday. The weather here in central IL was downright nasty. We were checking the TV at 3 am for tornado warnings, it was so bad. So we stayed in, as the advisory was for wind and you weren’t to drive unless you had to. Since I am functioning on temporary crowns right now, eating out wasn’t really high on my list, so we had lots of scrambled eggs and noodles.

I did sandwich a lasagna quilt and quilted a third of it with my very bad FMQ scribbles. I did try some more FMQ on another quilt, but stopped after the top thread broke twice. Then it was on to the quarterly quilting homework of chiclets blocks. Now I love the chiclets pattern, but all of those HSTs can be annoying. Since working on Patches & Pinwheels and the OC, I am now using my easy angle for those HSTs and it’s going much faster. I also found my WOW pile, hidden in the basement under some toys (I wonder who that could be?). So now no more chiclets blocks until July.

Then I started on the Brownies quilt, ironing off all the extra crayon wax and trimming the blocks down to the actual colored surfaces, as the girls did not fill up the whole block in most cases. Then it was framing the blocks log cabin style in 2.5” strips. I then started cutting into my blue and orange milk crate and I started with the scrap bag and not the yardage. The scrap bags take forever, so I didn’t get very far.

And then I watched 3 hours of Survivor and I had Amanda and Parvati in my pool, so I have won some cash! Yay!

Week 18 report and Week 19 goals

UFO #2 – Sheri’s quilt

Goals for Week 19:
Progress, progress, progress
Each night:
Sandwich a quilt – there are 3
Quilt for one bobbin or one hour, whichever is shorter
Finish Brownies top
Attach binding to one quilt
Continue cutting blue and orange milk crate
Start cutting the yellow milk crate

There is not a lot of piecing this upcoming week, but I have a lot of weekends in the car for the next few weeks, so I am trying to quilts quilted and bindings attached for whipping down in the car or while visiting with families. 6 of the UFOs in this mini challenge were already pieced, so quilting is what needs to be done, so let’s just get to it.

I will lose one night due to dental work, so we shall see how this all goes.

Tuesday, May 06, 2008

It's Mailed!

Not much happened yesterday, but in many ways the little bit that did was A-OK.

I FINALLY got the label on Sheri’s quilt last night, while DD flitted about in the backyard, running from neighbor to neighbor playing with all the little girls. (It’s high time she made some friends!)

And then today, I got the quilt over to the FedEx-Kinko’s and mailed it out. It should arrive either tomorrow or Thursday, which is perfect, because Sheri’s birthday is Thursday. She will be 54.

The quilt is all cow fabric and hearts fabric. On the one day I call in sick in October 2006, Sheri leaves work ill and is diagnosed with congestive heart failure. She already had leaky valves and within the year before she fell it, she had lost 75 pounds and looked terrific. If she had not lost all the weight, the congestive heart failure would have killed her.

Anyway, Sheri needed some valve replacements. They told her they were going to use cow valves. She asked for one cow valve and one pig valve so she could “Moo & Oink.” It’s a Chicago reference: http://en.wikipedia.org/wiki/Moo_%26_Oink. Trust me, it’s worth clicking on the link.

The doctors did decline, and when they got inside Sheri, she only needed one valve and they were able to repair the other. Meanwhile, Sheri’s mother was not exactly sympathetic; her mother is one that has to be in the spotlight. So Sheri nearly dying and having open heart surgery (!) was not considered a big deal and her mother has no idea why Sheri is so damned whiny.

Needless to say, Sheri needed a quilt. It got lost in the move, but it’s on its way, better late than never. The Cow Quilt, pattern, Yellow Brick Road, symbolizing the road to recovery.

I did take pictures, but I have no idea how that part works. Stay tuned.

Monday, May 05, 2008

UFO #2 is done

Let’s see, how was the weekend for quilting?

I finished the binding on Sheri’s quilt and made the label using Printed Treasures. Tonight I will sew the label on, pack it in a box and mail it on its way!

So UFO #2 – Sheri’s quilt.

I worked on stupid Chiclets blocks and ran out of WOW. I ran to the Treadle and fixed that issue. Only other offense: 2 packs of charm squares. I buy 2 at a time for nickel quilt patterns.

I had been given a roll of 54” fabric that if it washes up OK, would be suitable for charity backs. I cut off a hunk, washed it, dried it and it appears not to have shrunken down to a handkerchief. I need to iron it and measure to it check for shrinkage. Overall though, this was a success.

UFO #3 - I’m not sure where I’m going with this. I have 3 quilts all about the same size that need to be sandwiched, and then the quilting can commence. I need to work on the Brownies quilt as well. I may sandwich one using the washed back and have it at the ready to quilt.

I need to cut the milk crate and do all of that processing, but the finance final looms on Thursday.

I did, however, find my car sticker!

Friday, May 02, 2008

Week 17 ends and 18 begins

Just a quick update. I tried to sew more binding down last night after class (while watching Survivor on tivo) and the new medication I’m on put me right to sleep. Well, so much for that!

Goal is to work on that tonight and over the weekend and get it to the Kinko’s by Monday for shipment. We should be good to go.

Week 17 finish:

Little Red Mat - 1/8

Week 18 goals:

Finish Sheri’s quilt
Process blue and orange milk crate (please note that this involves several things, as noted before)
Brownies quilt – progress
Start OC step 2
Start OC step 3
Kit step 1b for Kim
Kit step 2a for Kim
Kit step 2b for Kim

Thursday, May 01, 2008

At my work, we have 3 hours of ‘give’ in our schedules per week. As long as we make up the 3 hours, we can take it whenever. So since I need to be at work on Friday afternoon, I took my choicetime yesterday afternoon.

I did get the binding on Sheri’s quilt and even started to stitch it down before class. Then after class I came home and got even more done. A whole long side is whipped down.

So tonight I have find my car sticker, but then I will continue to stitch that binding down. There is actual hope that I will make it to mail it on Saturday! Yay!

Wednesday, April 30, 2008

I remembered!

I gotta do the Brownie quilt for my DD's troop.

That makes 8!

a finish!

I just realized I haven’t posted an update since issuing myself the mini-challenge.

I did indeed complete UFO #1 – the little red mat. It is all done and actually on display (albeit in the wrong month – it’s for February) on the little dresser. YAY! I used my large stipple stencil and FMQ’d it. There are some HUGE toe-catching stitches on it, but I have to start somewhere.

I also quilted all of Sheri’s quilt, which is a twin. I then unpinned it and snipped all the threads last night, which took me well over an hour (so of course I watched 2 tivo’d things). It needs to be trimmed and bound. I do have class tonight, and a doctor’s appointment right after work, so I may or may not get this done. If I could get it trimmed and the binding attached before class, then I can leave it next to my bed at night and work on it as I wind down each night. I want to get his one in the mail on Saturday because her birthday is on the 8th.

Monday night did leave me exhausted. I took a nap when I got home, watched some TV and then ended up going to bed. I do not know how I ended up this tired, but I went with it.

So week 17 showed the little red amt as a finish and week 18 should show Sheri’s quilt as a finish. Other items in consideration are the Hunter quilt, 2 lasagna quilts and the Jackson quilt. That’s 4 more things. That leaves one left to figure out.

Monday, April 28, 2008

Weekend update

Well, it was a pretty productive sewing weekend! Since I cancelled the evil dentist appointment, I had a free bonus weekend. No homework, no dental pain. Well technically I had homework, but I did it all Friday night so it would be out of the way.

I did plan my herb garden in little window boxes that hang over my deck. Of course, tonight is going to be like 30, so I need to bring them in tonight.

On to quilting. I worked toward my mini-goal and actually finished the red mat. Of course, it doesn’t have a label yet; I’m waiting until I have enough finished to warrant using a whole sheet of Printed Treasures. I’m loving Nann’s idea of using a label size from Avery and making the labels that way. So one finish down, and 7 to go.

I also finished the purple pinwheels, which made 25 pinwheels, which is 100 HSTs, which is 200 triangles cut with that EZ angle. I can vouch for the EZ angle. Again, these are for the P&P I’m making for a wedding gift in June.

Nothing else was outstanding from the last milk crate, so I could cross that off the list.

I did quilt Sheri’s quilt in full. Now I need to take out the safety pins, trim the threads, square it up and attach the binding so I can hand whip it down this week. This needs to be in the mail on Saturday.

I hauled some serious butt on the GFG as well. My goal was organization, which was to be to get one flower completely pinned to the hexagons and figure out from the existing partially constructed flowers what I could work on. My goal is one flower per month and 2 hours on the existing mess, so that slowly I can get some stuff done. Once I get 7 flowers all done, I will join them together. I have 3 flowers done.

So during the evening last night, I watched some Star Wars on Spike with DD, and sewed 3 hexes and folded 10 items and did that for 2 hours. All the folding got done and 18 hexes got done, so it was rather productive.

I have an entire laundry basket full of paperwork to go through, so no doubt that will be tonight’s goal. From a sewing point of view, I’m aiming to de-pin and thread trim Sheri’s quilt, do more hexes and find the backing I want to use up for the Brownies quilt. I need to measure it and then lay out the girls’ blocks and see what comes to me.

So what’s left:
Brownies quilt all done
Sheri’s quilt all done
1 bag for work quilts
18 Chiclets blocks

Friday, April 25, 2008

Mini-Challenge

I have a family wedding in 8 weeks. I’ve been doing extra cutting for a Patches & Pinwheels (yet another Bonnie quilt) and even assembling the pinwheels as I go. I’ve figured out that a P&P would be a perfect wedding quilt for this couple, as they are White Sox fans and pinwheels figure prominently on the exploding scoreboard.

So I’ve decided that I will finish (not start!!!) 7 UFO’s between now and then. They may be UFO’s or they may be WHIMM’s, but the goal is getting 7 started things done. So 7 UFO’s and the wedding quilt = 8 quilts.

OK, then 8 UFO’s between now and then.

Week 16's a bust, so on to Week 17

OK, it was a quilting week off. I rested this week and took a test this week, so those were some necessary and meaningful uses of my time in my opinion. However, I am getting cranky and need to sew, so I will get at it today after work. I’m done today at 1:15 and although I have homework for my group project due tonight, I can sew and do homework in the same room and just switch off.

As usual, my quilting list for week 17 is far longer than will actually get done, but I gotta dream big!

Week 17
Brownies quilt all done
Sheri’s quilt all done
Purple pinwheels
Finish anything else from last milk crate
GFG organization
Mycala’s gift
Red dresser mat
1 bag for work quilts
18 Chiclets blocks

Please note this really doesn’t include any OC stuff. I have been doing OC stuff and cutting more and more milk crates up, but not getting through some of the items on the list. They’ve been carried forward over and over. So it’s time to work on some of that. Catching up on OC will not be hard.

Plus I have 2 birthdays coming up and I need to handle those things, as they are timely.

Tuesday, April 22, 2008

Well, it’s not exactly been a quilty week so far. I have a strong feeling that nothing will get done in a quilting vein at all this week and I’m not going to beat myself up over it!

On other fronts, I have a test in one class tomorrow night and the dishwasher installation is Friday afternoon, so those are 2 things I must prepare for.

Friday, April 18, 2008

Week 16 goals

For Week 16:

Brownies quilt
Mycala’s gift
Process blue and orange milk crate
25 4 patches OC
24 step 1 CC
24 step 2 CC
Sew up 3.5” P&P strips
Sew up 2” P&P strips into 2’s (need 4’s)
Finish red dresser mat
6 Chiclets blocks
Sheri quilt – progress
Prep 1 GFG block
OC step 2 blocks – up to 100 if possible

It’s going to be hard to get stuff done, but I continue to aim big.

Back to work – it’s crazy-busy.

Monday, April 14, 2008

Sunday report

It was also a pretty productive Sunday as well. I got through the red pinwheels and cut our all the HSTs for the purple pinwheels. 20 step 1 CC blocks also got done. That leaves me pretty far on the weekly list. We’ll see how much I get done during the week. I also got the heart block done for Sonya, so I need to pop that in the mail.

Sunday, April 13, 2008

A great Saturday

Yesterday’s quilting went pretty well. I got as far as I could on my OC. Since I want to be scrappy, I have to wait for other milk crates to be done. So 75 4 patches are done and 75 2 patches are done.

All the 2” P&P are sewn.

20 step 1 blocks are done for the CC.

I started the 20 step 2 blocks for CC and the red pinwheels for P&P. Everything is in the process of assembly, but my back gave out at like 8:30, so I went ahead and stopped for the evening.


My SIL and I mis-communicated about the date for her son’s communion. It was Saturday and I had emailed her to confirm it was Sunday and she did indeed confirm it was Sunday. So now that we’ve missed it, I’m home all today too. So after I go count cash at church all morning, I can come home and sew.


Today’s goals include Sonya’s heart block, finishing the 20 step 2 blocks, finishing the red pinwheels and cutting the purple HSTs for the purple pinwheels. Next goals would be prepping the GFG hexes and the 6 Chiclets blocks.

Saturday, April 12, 2008

Successful Friday

What a good kickoff to Week 15.

I came home at like 3:30, and started cutting the next milk crate, which is full of reds and purples. It took 1 hour to cut up the crate and another 1 each for the scrap bags, for a total of like 3 hours of cutting. That was hard on the back.

However, I had a lot to show for it, which is great. My 2.5” strip bag is 100% full, so it will be time to start another bag. I didn’t even cut any of these – I just took them out of the scrap bags. I already sewed all the 2” strips together for the P&P, but I did not worry about making any strip sets of 4 strips or any sub cutting. The 3.5” strips are half done. I sub cut all the red strips with the WOC strips with my EZ angle. Those are for the P&P pinwheels.

Today’s goals are prepping the GFG hexes for tomorrow’s road trip, sewing all of the pinwheels together, 20 step 1 and step 2 CC blocks and some 4 patches for the OC. OMG, I will be sewing all day. The weather’s due to be crappy, so that’s OK, but I do need to do some housework and homework too.

Well, off I go! Oh, and we bought a dishwasher last night too.

Friday, April 11, 2008

Week 14 Wrap Up

No quilting last night, but the presentation for class went well and I was able to come home, watch Survivor and then hit my marketing homework. That took some serious time, but now I can quilt with freedom today. I get off work at 2:30 or so, so I can go home and sew for a while (after starting laundry). A list mom from one of my yahoo groups is seriously ill, so I need to make a block and send that through.

Here’s how week 14 shook out:
Done - Go through green ziploc, take out 2.5 strips and process
Done - Kim’s GC packet – 150 2 patches (she needs small steps)
Done - Sew 150 2 patches for OC
Done - Sew up 3.5” P&P strips
Done - Sew up 2” P&P strips into 2’s (need 4’s)
Done - Sew up CC 2” strips – all steps will be involved!
In progress - Finish red dresser mat
Not started - 6 Chiclets blocks
Not started - Sheri quilt – progress

Not too shabby, despite plumbing problems and classes, which included a presentation.

Week 15 goals

Time for some Week 15 goals:

Process red and purple milk crate
Cut another WOC for lights for the 3 Bonnie quilts I’m cutting for
OC 2 patches and then some 4 patches – quantity dependant on what I can get out of the milk crate
Sew up 3.5” P&P strips
Sew up 2” P&P strips into 2’s (need 4’s) – join a few to the greens already done
Sew up CC 2” strips – working on steps 1 and 2, which will make the ring block, which is step 6
Finish red dresser mat
6 Chiclets blocks
Sheri quilt – progress
Heart block for Sonya
Prep 1 GFG block
Sew all colored hexes for GFG

These are some seriously aggressive goals, considering that Sunday I have to count cash at church (8am until noon) and then hop in the car to Chicago for a family thing at 2. If I get all the GFG stuff prepped, I could actually get that whole thing done in the car going back and forth. We shall see.

Thursday, April 10, 2008

A little bit here, a little bit there

While waiting for my group work partner to come over to finish our presentation, I did a little quilting. I made a little bag to hold a wall hanging when it’s all rolled up for storage and I continued work on the little red mat. I was able to pick out fabrics to finish it from my stash, added borders and got it sandwiched. It’s basically the size of a large placemat.

I’m thinking of practicing my stippling on it. I bought a large stipple template a few months ago and the pounce with chalk, so I may whip all that out to try it out. My free motion quilting is awful, but hey, you gotta start somewhere.

Tonight class was moved up from 8-10 to 6-8. We also have to give the aforementioned presentation, which is not fun, but it won’t be too bad and it will be over. The only other obligation for this class will be the final. However when I get home, I need to do group work for my other class that must be submitted by midnight. I have no idea if I will get to sew at all.

Wednesday, April 09, 2008

Plumbing Problems

Those 2 words strike terror in the heart. DD astutely caught the drip into the basement and Ted undid the dishwasher and found the leaky value. So now I await the plumber’s phone call so I can leave work and head home.

On a related note, we are trying to plan a large vacation and I have extensive dental work planned and now this. The Lord provides; the Discover Card people raised our limit by $2000 last week. While I don’t like to use credit, I am OK with it for these types of things. I have a hard time planning for the vacation without having all the money in hand right now to pay for all the pieces.

And on top of this all, I got either a migraine or a sinus headache last night. No sewing got done, but nothing else was urgent, so I was a slug and was OK with it.

Tuesday, April 08, 2008

Tupperware

Well, no quilting got done yesterday, but I went to a Tupperware party. I bought the cupcake transporter thingy.

Goal for tonight is to clean up my house. It’s in pretty good shape, so it should be a quick tidy. Laundry, folding and then some sewing.

Monday, April 07, 2008

Successful Sunday

What a great Sunday! More fantastic sewing got done.

I did go through the green Ziploc of scraps and half the bag was 2.5" strips, 2" strips or bindings. So I put all of those things in their home, leaving just the scraps.

I also handled all the 3.5" strips that I cut for the Patches and Pinwheels (P&P). I ran out of cut lights, so the remaining green strips were put into a newly created 3.5" strips Ziploc. Overall, I made 11 A pinwheels and 12 B pinwheels (they spin different ways) in green. That’s like nearly 100 HSTs.

I did also sew the 2" strips together greens and lights for P&P.

I unsewed the bad row on the little red mat and resewed it. So now it’s a teeny topper that needs some borders, etc.

Kim’s kit is ready, except for instructions.

Tomorrow’s goal will be to get Kim’s pack ready for mailing, and the 6 Chiclets. Bonus would be to start to finish the Sheri quilt. I do have a Tupperware party to attend.

Saturday, April 05, 2008

Saturday night news flash

A quick Saturday night update:


I did get the 150 2 patches done for my OC. I also sewed as much as I could on the CC with the milk crate strips I had cut. I netted 16 step 1 blocks and 16 step 2 blocks, plus more pieces for variety later on. I also cut 70 of the 150 dark squares needed for Kim’s GC 150 2 patches. So I got a lot done.


Tomorrow’s goal is the green Ziploc and its processing, finishing Kim’s kit so I can mail it to her and maybe the 3.5” strips for the Patches and Pinwheels. Those are all EZ angle units, so lots of cutting and sewing into HSTs and then into pinwheels.

Friday, April 04, 2008

Week 14 and Crushing

I started cutting in earnest last night after my class. I am cutting for 3 quilts, because, well, I am nutso. But you all knew that! All 3 are Bonnie quilts: Patches and Pinwheels, OC and GC, and CC.

I have all my small yardage stash in milk crates by color under my sewing table. I pulled out a crate and got to work. I did greens and a few reds. I only picked really dark values. I cut a 3.5, a 1.5 and 3 2 inchers. One 2 incher went into the GC pile, and another into the OC pile. The 3 other strips all went into their own piles for the other quilts. I then went into the green scrap Ziploc (those really tiny pieces) and busted some stash there too. The only modification I’m making to this milk crate cutting system is to remove all 2.5 strip pieces from the Ziplocs and handle them. I had started cutting for a Boxy Stars, so I can just continue with that.

I also cut up some COC for the P&P and the CC and added them to their respective strip piles. And I did find some solid white, so I cut that up for the OC for now. The whole process only netted 3 strings, which is nice.

I’m so glad someone mentioned cutting the WOF strips in half! I get more variety, but more importantly, stuff is just way less wonky. I cut the white strips in half and started sewing some greens to them for my 4 patches. I didn’t get very far, being tired, but I did cut for an hour.

So this week’s sewing goals (it’s week 14) are:
Go through green ziploc, take out 2.5 strips and process
6 Chiclets blocks
Kim’s GC packet – 150 2 patches (she needs small steps)
Sew 150 2 patches for OC
Sew up 3.5” P&P strips
Sew up 2” P&P strips into 2’s (need 4’s)
Sew up CC 2” strips – all steps will be involved!
Finish red dresser mat
Sheri quilt - progress

It’s a lot to do, but with the sewing area clean, it makes it far more enjoyable to be down there. I will be sewing hard and doing homework hard, as best as I can tell.

Wednesday, April 02, 2008

Does this count?

I cleaned up my sewing space last night. The cutting board, the machine, the ironing board and all the little places I leave stuff all over the room are all now tidy. I realized I was avoiding sewing and even going into the basement (my sewing room is in our fully finished basement, which is also our family room) because of the mess.

So I stopped worrying about cutting up scraps and just cleaned everything up. Some of it was not so elegant (shove pieces-parts of projects into a really big banker’s box so that least the nuttiness is together), but all the surfaces are clean and dusted. I can start anew.

I am also very excited to read that it will be a full 2 weeks before another clue is posted. I’m nowhere near ready to start sewing, plus I need to cut Kim’s out at the same time. Plus I have 2 tests and one presentation in the next 3 weeks from today, so I pace myself. Grad school continues to kick my butt, but there are only 6 more weeks and then 14 glorious weeks of summertime.

But at least I can set foot in my sewing area again!